PISAF - Integrated Family Health Program ANNUAL PERFORMANCE REPORT N O 1 MARCH 28 SEPTEMBER 30, 2006

Dimension: px
Commencer à balayer dès la page:

Download "PISAF - Integrated Family Health Program ANNUAL PERFORMANCE REPORT N O 1 MARCH 28 SEPTEMBER 30, 2006"

Transcription

1

2

3 PISAF - Integrated Family Health Program ANNUAL PERFORMANCE REPORT N O 1 MARCH 28 SEPTEMBER 30, 2006 Distributed to: Donald Dickerson, USAID/CTO Cotonou, Bénin PISAF, Projet Intégré de Santé Familiale, is funded by the United States Agency for International Development (USAID), under Cooperative Agreement No. 680-A PISAF is managed by University Research Co., LLC (URC) in collaboration with Abt Associates. DISCLAIMER: The author s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development of the United States Government.

4 TABLE OF CONTENTS 1. INTRODUCTION Cross-cutting Strategies PERFORMANCE REVIEW AND ANALYSIS Intermediate Result 1: A Supportive Implementation Environment Created Intermediate Result 2: Access to Quality Services and Products Increased Intermediate Result 3: Demand for Health Services, Products, and Preventative Measures Increased PROGRAM MANAGEMENT Introductory Meetings Administrative and Personnel Management Financial Management Buildings and equipment Technical Assistance and Consultants CHALLENGES AND OPPORTUNITIES Challenges Opportunities FINANCIAL DATA... Error! Bookmark not defined. 6. ANNEES Annex 1: Performance Monitoring Plan Annex 2: Progress Table Annex 3: 2007 Draft Implementation Plan... 47

5 ACRONYM LIST AIDS Acquired Immunodeficiency Syndrome ART BCC CBOs CBS CBSA CDC DDSP DSF EONC FBOs FHS GFTAM HIV IEC IMCI M&E MOH NGOs PMP PMTCT PNC QA RFA SNIGS STI TA URC USAID VCT Anti-retroviral therapy Behavior Change Communication Community Based Organizations Community-based services Community Based Services Agent Center for Disease Control and Prevention Directeur Départemental de la Santé (Departmental Health Director) Direction de la Santé Familiale (Family Health Directorate) Emergency Obstetrical and Neonatal Care Faith Based Organizations Family Health Services Global Fund to Fight AIDS, Tuberculosis and Malaria Human Immunodeficiency Virus Information, Education and Communication Integrated Management of Childhood Illness Monitoring and Evaluation Ministry of Health Non-governmental organizations Performance Monitoring Plan Prevention of Mother-to-Child Transmission Prenatal Consultation Quality Assurance Request for Application Système National d Information d Gestion Sanitaire (National System of Health Information and Management) Sexually Transmitted Infection Technical Assistance University Research Co., LLC United States Agency for International Development Voluntary Counseling and Testing PISAF - ANNUAL REPORT NO. 1 v

6 INTRODUCTION The Integrated Family Health Project, or PISAF (Projet Intégré de Santé Familiale), is a health project funded by the United States Agency for International Development (USAID) and awarded to University Research Co., LLC and Abt Associates through cooperative agreement on March 28, PISAF partners with the Ministry of Health (MOH) and seeks to improve the health status of the people of Benin through collaboration with NGOs, government agencies, other donors and USAID projects, communities, and the private sector. The project s activities support the Government of Benin s national policies and strategies and USAID s health objective, which seeks to increase the use of health services, products and preventive measures in a supportive policy environment. PISAF is a five-year project implemented by a multidisciplinary team that provides technical support to the Ministry of Health and other actors in the health sector. PISAF is based in Zou/Collines, which is the region of primary focus, and also provides support in the Borgou/Alibori and the Ouémé/Plateau regions. PISAF activities address three main results areas: Intermediate Result 1: A Supportive Implementation Environment Created Intermediate Result 2: Access to Quality Services and Products Increased Intermediate Result 3: Demand for Health Services, Products and Preventive Measures Increased The following report describes the main activities within each of these results areas carried out from March 28 through September 30, This is the first annual report prepared and submitted to USAID for the PISAF project Cross-cutting Strategies To achieve the desired results, the PISAF project engages the following cross-cutting strategies: Fostering Beninese investment and ownership of improvement efforts at all levels of the health system Putting decentralization into practice at zone-level Ensuring that norms are updated, communicated and integrated into service delivery Emphasizing quality assurance and institutionalizing continuous improvement Strengthening linkages between communities and health facilities to stimulate demand and quality of care Multi-sectoral approaches Using pilots and small applied research to test new or innovative approaches Over the period from March 28 through September 30, 2006, the PISAF Project began laying the ground work for advances in each of these cross-cutting areas. Project activities within each IR and directed towards each technical area were designed specifically to be integrated across the project to achieve the greatest results. The following specific activities were undertaken to ensure effective realization of these cross-cutting themes: PISAF - ANNUAL REPORT NO. 1 1

7 Fostering Beninese investment and ownership of improvement efforts at all levels of the health system. PISAF works to ensure that Beninese partners at the national, regional, zonal, health centre and community levels participate in the development of new approaches and tools and take them on as their own. In the first months of the project, PISAF has fully engaged the Ministry of Health and the DDS in each zone in which we are active. From planning specific activities to development and validation of tools and documents and formation of long term plans, MoH and DDS staff have been actively involved. In the implementation of the Management Assessment (MA), DDS staff provided input into the design of the assessment, participated in data collection, and were fully briefed on the results of the assessment. Selected staff at the national and departmental levels also were trained in the presentation of the data and findings. These staff were prepared to make a full presentation to Congress on their own. Putting decentralization into practice at zone-level. Many of the policies and decrees that facilitate effective decentralized planning, financial and human resource management of health zones and foster allocation of health budget by local governments have been developed by the MOH. During this reporting period, PISAF supported the implementation of decentralization by providing technical and financial support for the regular meeting of the committee to monitor the recommendations generated during the forum on health sector decentralization. PISAF also provided technical and financial support to organize a national exchange day on integrated ascendant planning as a first step toward full integration of ascendant planning into the annual planning and budgeting process. Discussion also took place between PISAF and the National AIDS Control Program (PNLS) regarding the decentralization of HIV/AIDS and STI activity planning. Ensuring that norms are updated communicated and integrated into service delivery. In consultation with departmental level partners and under review and approval by national level staff, PISAF will be working to develop mechanisms for review and revision or adaptation of standards and protocols, and to communicate them to the health workforce and community, and ensure they are integrated into M&E and supervision guides. To date, PISAF has begun its work in this area by supporting the validation workshop of the national contraceptive security strategy paper and providing logistical and financial support for the reproduction of the Five-Year Maternal and Neonatal Mortality Reduction Plan. Additionally, job aids on malaria rapid diagnostic tests (RDTs) and infant feeding practices among HIV positive mothers are being developed based on revised international standards. Emphasizing quality assurance and institutionalizing continuous improvement. Quality assurance is being promoted at all levels of the system, such that quality assurance activities, structures and values become an integral and sustainable part of the health system. To begin its work in quality assurance, PISAF conducted an assessment of the availability of the quality family health package in public sector facilities in the Borgou/Alibori and supported a collaborative improvement session there. The Zou/Collines has existing quality assurance activities in the areas of IMCI and emergency pediatric care; emergency obstetric and neonatal care; nosocomial infections and client satisfaction. PISAF will support these activities in the coming year. Strengthening linkages between communities and health facilities to stimulate demand and quality of care. During the first six months of the project, PISAF has led several efforts to strengthen community-health facility linkages. To better direct its interventions in community mobilization, PISAF organized an experience-sharing workshop for partners working at the community level. In preparation for strengthening the COGECS in the Zou/Collines, PISAF performed an inventory of the existence and operations of the COGECS in the two departments. PISAF also worked with the DDS in the Zou/Collines and the PNLP Coordinator on a community-based ITN distribution strategy that uses women s groups as PISAF - ANNUAL REPORT NO. 1 2

8 key partners in distribution. In the Borgou/Alibori, PISAF organized a training session on mutuelles to increase knowledge and awareness of their purpose and benefits. Multi-sectoral approaches. By building on existing contacts and networks and maintaining continuous communication with the MoH, DDS, and local groups, PISAF regularly engages players across sectors to enter into dialogue and participate in project activities. Most notably, PISAF has engaged locally elected officials, many of whom are eager and willing to participate in and support PISAF activities and objectives. Using pilots and small applied research to test new or innovative approaches, with results informing policy. Over the past several months, PISAF has begun to generate ideas and identify opportunities for small pilots and operations research studies. Several initiatives are forthcoming with focus on malaria, HIV/AIDS, and IMCI. Further details on the incorporation of these cross-cutting strategies and specific activities related to each IR are described in the following pages. 1. PERFORMANCE REVIEW AND ANALYSIS 2.1. Intermediate Result 1: A Supportive Implementation Environment Created This Intermediate Result, which contributes to USAID/Benin s health strategic objective (SO 5), seeks to create a favorable policy environment to improve access to quality health care and services through policies that support decentralization, well-defined standards and protocols disseminated at all levels, quality management and the effective involvement of communities in managing their health. Principal Accomplishments Advocated for incorporating policies from the strategic plan on development of mutuelles into the policy paper on health sector development policy paper. Supported the regular session of the committee to monitor the recommendations generated by the forum on decentralization of the health sector. Held a dialogue workshop on integrated ascendant planning in the Ministry of Health. Supported the validation of the national contraceptive security strategy. Supported the finalization and reproduction of the five-year national plan to reduce maternal and neonatal mortality. Supported the preparation of the National Malaria Program s (PNLP) proposal to the Global Fund. Introduced PISAF to the the MOH and the DDS of Zou/Collines and of Ouémé/Plateau. Conducted the first management assessment in the Zou/Collines region. Purchased computers and established an Internet domain for the DDS and health zones. Identified and contacted the NGOs, CBOs, women s groups, local radio stations and local authorities in Zou/Collines. PISAF - ANNUAL REPORT NO. 1 3

9 Sub IR 1.1: Selected health policies and approaches implemented Finalized and assisted with the implementation of the policy on mutuelles Advocated for incorporating policies from the strategic plan on development of mutuelles into the policy paper on health sector development policy paper. The strategic plan for development of mutuelles, the main points of which already have been validated, will serve as a framework for all the stakeholders in the area of mutuelle development in Benin. The implementation of this plan will create an environment that is favorable to developing mutuelles. The steps for finalizing this strategic plan began as soon as PISAF started up, with work sessions involving resource persons from the Planning and Program Directorate (DPP) and the community health department of the National Health Protection Directorate (DNPS). With technical support from Abt Associates, the local PISAF team provided technical and financial assistance to the DNPS/MOH community health service team by reviewing the Benin Health Mutuelle Strategic Development Plan. These sessions made it possible for the team to deliver a final draft of the document to the Ministry of Health. One of the suggestions made during the meeting at the Ministry of Health was to hold a workshop including DPP officials; the committees in charge of preparing the Health Sector National Development Plan (PNDS) and the second edition of the Poverty Reduction Strategy Paper (PRSP 2); the Strategic Planning Directorate in the Ministry of Economic Development and Finances; the Advisor for Project and Program Monitoring in the Ministry of Health; and other partners, to encourage ownership of the contents of the strategic plan on the development of mutuelles in Benin. Such a workshop will facilitate the inclusion of the plan s policies in the various strategic papers now being prepared. PISAF will provide technical and financial support for this workshop, which is to be organized by the Community Health Service. PISAF - ANNUAL REPORT NO. 1 4

10 Prepared a communication plan for decentralization policies: Supported the regular session of the committee to monitor the recommendations generated by the forum on decentralization of the health sector. PISAF provided technical and financial support for the regular session of the committee to monitor the recommendations generated by the forum on decentralization of the health sector. The session was chaired by the Director of the Cabinet, and attended by the Assistant Director of the Cabinet, the Secretary General of the Ministry, the Assistant Director of the DPP, and the PISAF Chief of Party in attendance (see photo below). Approximately 30 people attended this session, held on Tuesday, June 27, 2006, at the Ministry of Health in Cotonou. The work of the session consisted of two presentations, made by the Director of Health Zone Development and the Head of the DPP s Research, Strategies and Planning Service respectively. The first dealt with the Monitoring Committee s mission and the results of the work done by the five (5) technical subcommittees set up to implement the recommendations of the forum on decentralization of the health sector, which was held in April The Director of Health Zone Development shared each technical subcommittee s progress in the decentralization and health system reform process. PISAF - ANNUAL REPORT NO. 1 5

11 The second presentation highlighted the remaining tasks that each of the technical subcommittees would be likely to carry out in The tasks are as follows: Technical Subcommittee Human Resource Management Financial and Material Resource Management Document Review Programs and Planning Integration Information and Awareness Tasks Prepare an operating plan for the human resource management policy Disseminate Decree No. 465 of September 29, 2000, and the new standard contract model Establish a 2-year duration for contracts of workers addressing social issues Conduct a mapping of the disadvantaged/isolated zones Update the order on personnel turnover based on operational level Reflect on the placement of budgeted positions at the decentralized level Finalize the study on procedures for transferring the funds of decentralized project and program activities by delegating appropriations Make consistent the bylaws for the COGECS and the order providing approval for zone hospital charters. Prepare the implementing documents for the decree on reorganization of the base of the health pyramid Prepare and have adopted the laws on the new names of the health zones and commune-level health centers with special status Establish mechanisms for implementation of the integrated ascendant planning cycle Finalize the order on the duties, organization and operation of the Department Health Directorates Prepare the information and awareness guide on decentralization Mobilize resources for carrying out the information and awareness plan Organization in charge Human Resource Directorate DRFM DDZS DPP SGM DSF with support from the DDZS The analyses of the members of the Monitoring Committee in response to these presentations made it possible to highlight the challenges faced and to adopt an action plan as indicated above. The Ministry s technical director are responsible for implementing the established action plan from this point forward. At the end of the session, the Director of the Cabinet and Chair of the Monitoring Committee expressed the Ministry of Health s satisfaction with USAID support for the decentralization process: Through PISAF, I wish to sincerely thank USAID for waking us up by supporting the organization of this session, because truly, we were asleep. We will do everything to stay awake in order to rise to the challenges we have identified for PISAF - ANNUAL REPORT NO. 1 6

12 The PISAF Chief of Party spoke of the project s commitment to support the Ministry when these activities are implemented. A report on the activities carried out in 2006 pointed out that only two subcommittees, Program and Planning Integration and Human Resource Management, were able to carry out the planned activities. They prepared the ascendant planning manual and held the workshop to revise the order on MOH personnel turnover respectively. The other subcommittees were unable to carry out their planned activities for various reasons, including unexpected obstacles that led to postponement of several working sessions and changes in government that resulted in the appointment of a new Minister of Health and new heads of Ministry departments. Considerable effort will be required in 2007 to carry out all the remaining activities. Regular forums to discuss decentralization issues with health care workers and civil society Workshop to revise the order on the reassignment of Ministry of Health personnel In August 2006, PISAF took part in the work of revising the order on the reassignment of health care workers. This activity was part of the 2006 planning work of the Human Resource Management technical subcommittee. The goal was to create a third level of reassignment to provide a regulatory framework for strengthening the prerogatives of the heads of the health zones in the decentralized management of human resources. PISAF, the only partner present at this workshop, was unable to bring the participants to an understanding, neither at the central nor the department level. Participants held onto the argument that much power already has been given to the coordinating physicians of the health zones in the context of decentralization. Even though the third reassignment level (the peripheral level) was not adopted, the workshop did serve to revive the debate on the decentralized management of health zones and on decentralized human resource management in particular. Likewise, the meaning and level of the debates are indicative of the large amount of information and awareness work necessary to bring a large percentage of stakeholders to the same level of understanding of the reform in progress in the health sector in Benin. Finally, the position taken by PISAF compelled the Cabinet to reconsider certain provisions of the document that was adopted but which the Minister has not yet signed. Implemented ascendant planning at all levels of the health system (central, department and zone) Dialogue on implementing integrated ascendant planning PISAF provided technical and financial support to organize a national exchange day on integrated ascendant planning. This meeting was held on August 30, 2006, at the Ministry of Health, and over 40 people attended. The workshop familiarized the participants with the eight (8) main stages in the integrated ascendant planning cycle validated by the committee to monitor the recommendations generated by the forum on decentralization of the health sector. The main recommendation dealt with the broad dissemination of the procedures manual, prepared by the Ministry of Health. PISAF indicated its intention to continue to support dissemination of the manual in the Zou/Collines. PISAF - ANNUAL REPORT NO. 1 7

13 The presence of representatives from the Ministry of Development (formerly the Ministry of Planning), Economy and Finance and their awareness of the ascendant planning process will enable this strategic ministry to place greater importance on budget forecasts submitted by the health sector in the future. Regular meetings between the Ministry of Health and donors for coordination and collaboration on health policy issues PISAF s introduction to authorities at the central level and in the departments Following the official launch of PISAF, which was co-chaired by the Minister of Health and the U.S. Ambassador, the project was introduced officially to the DDS of the Zou/Collines on August 3, 2006, to the Ministry of Health on August 8, 2006, and to the /Ouémé-Plateau DDS on August 23, At the Ministry of Health level, the introduction was made by the Minister s Director of Cabinet, and, at the Department Directorate level, by the Department Director. The primary concerns expressed by the participants were the sustainability of the accomplishments made by prior USAID projects and the coordination of PISAF programs with the involvement of Ministry officials. In particular, the issue of the six-day IMCI training was mentioned, as well as questions about the possibility of a project annex in Ouémé/Plateau, similar to that in the Borgou/Alibori. PISAF staff, with the support of the USAID family health Team Leader during the introduction at the Ministry, provided detailed responses to questions. After each introduction, brochures and project summaries were distributed. Due to scheduling considerations, the next phase of introduction of PISAF to the Borgou and Alibori authorities has not yet occurred. This series of introductions was an opportunity for PISAF to describe the project s framework and to refocus partner expectations of the project at each level. It is important to note how the Director of the Cabinet expressed the Ministry of Health s satisfaction: We are truly excited to see that the PISAF team consists almost entirely of national technical staff who are familiar with the health issues and behaviors of the people of Benin. That is what sustainability is about. The fact that there is confidence in nationals will enable them to develop expertise through PISAF. This is a great honor for us and we will do everything in our power to make this project a success, because we know everything that PROSAF accomplished in Borgou/Alibori. Zou/Collines health partner coordination meeting To ensure the effectiveness of the support from the Zou/Collines DDS health partners, a partner dialogue meeting was held in Abomey on July 10, This meeting, initiated by the USAID Family Health Team, received financial and technical support from PISAF. The meeting included all the partners working in both departments, as well as some Technical, Project and Program Directorates in the Ministry of Health. PISAF took advantage of this opportunity to share the major pillars of its work with the partners. Participants also became more familiar with the work of the other partners which should facilitate coordination of activities and avoid duplication of programs in the field. All partners and their activates were mapped. It was agreed that the partners meeting will be held every three months. PISAF - ANNUAL REPORT NO. 1 8

14 Supported the DSF to finalize and implement the national strategy to reduce maternal and neonatal mortality: This year, PISAF provided technical and financial assistance to the DSF in different areas. The workshop to validate the national strategy on contraceptive security was held in Lokossa on May 30 and 31, 2006: This workshop was an opportunity to: i) validate the major axes of reproductive health product (contraceptives, blood and blood derivatives, and oxygen) security, including, ii) validate the list of contraceptives, and iii) amend the draft collaboration contract between the CAME and the Ministry for signature. This contraceptive security plan is one of the pillars of the maternal and neonatal mortality reduction strategy. Holding this workshop was positive for the plan established by the DSF to release contraceptives acquired for the Ministry of Health that were in the port of Cotonou and pending clearance. A mini-workshop was held again in Lokossa on June 1 and 2, 2006, to distribute three separate planning documents for implementing the national maternal and neonatal mortality reduction strategy at each level (central, department and health zone). By participating in this workshop, PISAF was able to obtain these tools as soon as they were launched. The Five-Year Plan for Reduction of Maternal and Neonatal Mortality reproduced: After providing technical and financial support for the workshop to finalize the five-year plan, PISAF provided financial support for printing the plan, which will be distributed to the health facilities in the Zou/Collines. A dissemination campaign will be organized for this purpose in collaboration with the DSF. Other support to the Ministry of Health: Several activities were carried out that helped strengthen collaboration with the central level: Technical support for the PNLP to prepare terms of reference PISAF provided technical support to the PNLP for the preparation of the terms of reference to obtain technical assistance from USAID consultants in three areas: 1) preparing the MOH s malaria proposal for the 6 th Global Fund round; 2) preparing a monitoring/evaluation plan for the PNLP; 3) preparing a procurement and management plan for ACTs and long-lasting insecticide treated nets (ITNs). Support to the PNLP in preparing its proposal to the Global Fund: PISAF supported PNLP officials to develop a proposal for Global Fund funding, both in the preparatory and finalization stages. An international consultant was made available to the PNLP using PISAF funding. PISAF technical staff gained considerable experience in this process, which is one for which local expertise is scarce. This is an asset that can be used for subsequent support from PISAF for similar processes. Support to the DPP for disseminating national health account reports In this quarter, the printing of 5,000 brochures and 500 national health account reports was completed with PISAF funding. The printed items were made available to the DPP which, starting October 9, 2006, must organize the dissemination of these documents to all the departments in the country. Financial support also was provided to the DPP to organize a national dissemination session in November 2006 for the members of the government, deputies and heads of the country s institutions. PISAF - ANNUAL REPORT NO. 1 9

15 Support to the PNLS for the decentralization of HIV/AIDS and STI activity planning With the goal of developing collaboration between the National AIDS Control Program (PNLS) and PISAF, the PISAF Chief of Party paid a visit to the PNLS Coordinator. At this meeting, the highest official in this program was briefed on PISAF s objectives, with emphasis on its mandate from USAID to support implementation of PMTCT activities and decentralization of PNLS activities. This meeting made the PNLS Coordinator more comfortable with PISAF objectives. He was the only official from the central level that attended the health partners meeting of the Zou/Collines DDS to better understand the content of PISAF s interventions. During this meeting of the Zou/Collines health partners, the PNLS Coordinator said I need to better understand how PISAF can help us decentralize our activities, because the providers consider AIDS activities additional activities that overburden them and thus are the responsibility of the PNLS, which to date has been implementing a vertical program. In light of these remarks, two important events allowed PISAF to demonstrate to the PNLS the advantages of decentralizing its interventions. The first was the session for the MOH adoption of integrated ascendant planning with PISAF support. At this session, the DPP presented to all Ministry of Health programs the process to be used henceforth to prepare budgeted annual workplans, a process that must be implemented to if all health sector programs are to comply with decentralization. This process requires the different programs to provide the health zones with the information necessary to prepare budgeted annual action plans with the participation of the community, the health zone partners and the DDS. Once these plans have been developed, each level must play its assigned role in the context of decentralization. For example, the central level designs, monitors and evaluates, while the operational, or zone, level implements. Each level also must have the appropriate resources to play its role. The second event that demonstrated the advantages of decentralization was the PMTCT partner roundtable. At this event, the difficulties related to PMTCT implementation were brought out, including a lack of financial resources. In addition, the PNLS mentioned that health care workers that provide PMTCT services do not consider PMTCT activities to be health zone activities; rather, they are central-level, PNLS activities, and thus add to the zone level workload. Thus, they believe they should be given financial incentives to carry out these additional activities. PISAF pointed out that the verticalization of PNLS activities has led them to this conclusion. By including PMTCT activities in the health center and health zone action plans, the resources required for these activities will be set aside by the providers who will carry them out. PMTCT activities must be owned by the providers, which means transferring the planning of these activities to the level where they are executed. Advocacy with the PNLS will intensify in 2007 and will be facilitated by having the DPP implement integrated ascendant planning with PISAF support in early The startup of the IMPACT Project activities, which include a component for institutional support to the PNLS and CNLS, is a positive factor since PISAF and IMPACT will be working together in synergy. Attended dialogue meetings/workshops with partners Dialogue for the distribution of free long-lasting insecticide-treated nets (ITNs): Along with the other MOH partners, PISAF participated in the meeting to establish a procedure for distributing free ITNs, which is scheduled for the first quarter of 2007 with guidance from the World Bank s Booster Program. Two important points came out of this exchange: 1) a technical PISAF - ANNUAL REPORT NO. 1 10

16 committee should be established immediately to discuss the details of this distribution; and 2) distribution should take place in both the health facilities and in the community. Workshop to prepare the National PNLP Monitoring/Evaluation Strategy (Lokossa): PISAF made a technical contribution to this workshop, which was recommended by the World Bank prior to implementation of the Booster Program. Several aspects of the M&E strategy were addressed during this workshop, including: i) review of all indicators ii) development of a monitoring and evaluation plan and iii) discussion of the areas of monitoring and evaluation, the system for implementation and the different levels of intervention. The PNLP technical staff were given the task of finalizing this document so that it could be validated. Exchange meeting on IMCI between PISAF and the DSF: To foster the continued implementation of IMCI, PISAF initiated a meeting with the DSF and the head of the maternal and child health unit. At the end of the meeting, the proposal to hold a workshop on the implementation of the IMCI directives was accepted. Also, a decision was made to conduct an evaluation of the experience of implementing the six-day IMCI course in the Borgou/Alibori, present the preliminary findings to the decision-makers and discuss the results with them, so they could make an informed choice. Participation in the PMTCT partner roundtable On September 13 and 14, 2006, in the CODIAM conference room, a roundtable was organized by the PNLS on the progress made in expanding the PMTCT program in Benin. Financed by UNICEF, forty (40) participants from the central and department levels attended, as well as other partners working in PMTCT. The workshop began with a presentation of the workshop s objectives and a reiteration that once the work is complete, a plan for the acceleration of PMTCT expansion will be prepared, along appropriate strategies to be implemented to achieve expansion. The next presentation at the workshop was on the status of PMTCT in Benin and provided the background of the PMTCT program from 2000 to date highlighting that as of the end of 2005, PMTCT sites increased from 33 sites in the preparatory phase to 188 in the expansion phase, and that PMTCT is coordinated by a management committee with support from a technical unit. The accomplishments of this coordination are: i) preparation of the PMTCT policy, standards and procedures; ii) preparation and distribution of PMTCT training and management tools; iii) training of trainers and supervisors; iv) holding workshops for experience-sharing; and v) evaluation of the quality of site operations. However, the implementation of PMTCT activities is facing organizational, material, financial and human resource difficulties. Special emphasis was placed on the poor monitoring of children of HIV+ mothers; reagents, consumables and drugs that are out of stock; insufficient numbers of providers trained in PMTCT; lack of mediators at the sites; lack of funding for certain activities; and lack of means to send blood samples to the reference and CIPEC laboratories. Given these difficulties, the challenges are to strengthen the links between PMTCT and treatment sites using ARVs, implementing a system for monitoring children born of HIV+ mothers up to the age of 18 months, and the incorporation of PMTCT activities into the minimum package of activities, including supervision. The third presentation was on the CNHU s experience in treating children infected with HIV and children born of HIV+ mothers. The fourth presentation on the new WHO directives on PMTCT focused on participant knowledge. The purpose of these directives is to assist health ministries to select and obtain ARVs for women and their children in an PMTCT context. The WHO has proposed several types of arrangements to be adjusted to each country s context and realities. PISAF - ANNUAL REPORT NO. 1 11

17 The fifth presentation, made by the PNLS Coordinator, summarized the status of people on ARV treatment in Benin as of the end of the second quarter of It showed that the projections for treating 300 patients per quarter in 2003 were largely exceeded in 2005 when 700 patients were reached per quarter and in 2006 when 1,000 patients were reached per quarter. This is quite disconcerting because patients on ARVs receive free care and resources are limited. September 26 was the date selected for finalizing the PMTCT expansion plan with the partners, but this date was postponed and this meeting had not yet taken place as of the end of the quarter. PISAF was actively involved in the work of this roundtable by proposing several specific contributions, such as integrating PMTCT activities into health zone action plans, including PMTCT components in the health zone management team supervision grid; involving mutuelles in paying the mediators; training health providers in correctly estimating ARV needs with the support of the three MOH representatives from the PNLS, the PNLP and the CAME who were trained in QUANTIMED in August 2006 in Dakar with USAID support through PISAF. PISAF has agreed to contribute to better monitoring of children born of HIV+ mothers in its concentration department of the Zou/Collines. PISAF s contribution was very much appreciated by the chairs of the roundtable and by the PNLS and CNLS, as they saw USAID as an important technical and financial partner on which they can rely for PMTCT in Benin. Participation in presenting and discussing the preliminary results of the ProFam pilot project evaluation The ProFam project, whose purpose is to improve the quality and accessibility of family health services in the private sector, is now in its eighteenth month of implementation. This project involves the use of social franchising to improve the quality of service delivery in the private clinics in Atlantique and Littoral. Population Services International (PSI) and IntraHealth worked in collaboration with the DSF on this project, which notably targets the private health sector. Results include an improvement in the skills of workers trained in FHS protocols, better availability of contraceptives, and better integration of data into the SNIGS. This experience will be taken into account in PISAF s involvement in the authorized private health facilities in the Zou/Collines to improve access to quality family health services. Participation in the workshop to validate the three studies performed in Benin on the Standard Days Method (SDM): By invitation of the DSF/MOH, PISAF attended the workshop to validate the reports on studies performed on the SDM in Benin with technical and financial support from USAID through the Institute for Reproductive Health (IRH). This workshop was held in the Zou/Collines CIPEC and roughly 40 participants attended. After three days of work, from July 18 to 20, 2006, the reports on the three studies were validated and a plan to implement the findings was prepared. Through its support of the national strategy on contraceptive security, PISAF will contribute to the permanent availability of SDMs in the Zou/Collines Sub IR 1.2 : Increased health system management capacity created PISAF - ANNUAL REPORT NO. 1 12

18 Implemented the management assessment in the Zou/Collines region One of the major activities of this year was to implement the first Management Assessment (MA) under PISAF with the objective of establishing baselines for indicators available for effectively starting up activities to improve the quality of clinical and management interventions in both departments. One international and one local consultant were engaged to provide extra support for this effort. Several phases of the assessment were completed over the past two quarters. Other phases were in progress at the time of the writing of this report and a report on them will be available soon. A summary of the phases is as follows: Preparatory phase: The preparatory phase involved preparing the survey protocol and data collection tools. Nineteen (19) tools were validated along with the evaluation protocol at a workshop attended by officials from the Ministry of Health, the DDS and its partners. Areas of clinical intervention as well as support activities were included in the tools, which meet the concerns of the DDS, which was seeking a broad evaluation of the deficiencies in the health system. Data collection phase: This phase was facilitated by the involvement of the Zou/Collines DDS, which provided leadership to identify a solution to the many obstacles that occurred during this phase. In addition to the commitment made by the DDS and its staff, the implementation of the management assessment received substantial support from the Ministry of Health, which visited the data collectors during the first day of their training. The MOH stressed the importance of data quality and the use of data to improve health sector indicators. Data collection took place in two major phases: the data collector training and pretest stage and the actual data collection stage. The data collectors were health care workers from the two departments. Teams from each zone were assigned to collect data in another zone to avoid having individuals collect data in their own zone. Through collaboration established with the social promotion centers, workers from this sector were able to participate. Thus, the officials of the social promotion centers helped collect data in their respective communes. Local data collectors were selected on the basis of their mastery of the local language and their ability to translate the tools. A week-long training course that included pre-tests of the tools prepared the data collectors for their work. Since the management assessment thoroughly covered the Zou and Collines, the pretest by the data collectors was conducted in the departments of Mono and Couffo. Sixty-four (64) health care workers (physicians, nurses, midwives, administrators and medicaltechnical officials), including 23 women, and thirty (30) data collectors (9 women and 21 men), collected the data over a period of about ten days. These people were divided into 16 teams. Collection was supervised by 18 people divided into 6 teams. A total of 5,523 tools were administered, which accounts for about 70% of the projections. About 50% of tool 1: observation of services and tool 4: client interviews were not well-administered due to the fact that no many clients were using the health centers visited. The great achievement of this evaluation is that ALL accessible the health facilities were included (136, including four zone hospitals and one departmental hospital. Had it not been for the flooding that made the Idadjo Health Center in Collines and the Lobeta Health Center in the Zou inaccessible, the data collectors would have visited all the health facilities. The other major achievement is that all the subsystems identified by the DDS were included. Thus, at the DDS s insistence, even the DDS s organizational capacity was evaluated. PISAF - ANNUAL REPORT NO. 1 13

19 Data entry and analysis phases, and report preparation, validation and results dissemination phases: The final quarter of 2006 will be spent largely on the subsequent phases of the management assessment, which include entering and analyzing the data that were collected, organizing the results validation workshop and, finally, holding the partner roundtable for disseminating these results. These phases should culminate with the preparation of action plans for the COGECs, health zones and the DDS using the validated data from the management assessment. Pending the results of this data analysis, the following preliminary observations can be made based on the two completed phases of the survey:: A strong commitment and resolve by the DDS and data collection teams PISAF was most impressed with the initiative taken by the stakeholders from the two departments, beginning with the DDS, which provided 16 vehicles to transport the teams for data precollection and collection. Further more, the data collection team leaders incurred expenses for minor vehicle repairs. These expenses were charged to the operating expenses of the health zones, which was not something that happened in the departments of Borgou and Alibori. Some of the teams had to resort to small boats to access the different sites made difficult to reach due to this period of flooding. Discoveries Individuals who have been in public service for many years discovered places they had never seen. The leader of collection team No. 7 said: Thanks to the management assessment, I realized that we have our work cut out for us if only to prevent infections, because I would not have imagined that in this day and age, health care workers would be using fire to sterilize instruments. This is an anachronism and is hazardous to client safety. Contradictions The following statement was made by a data collection team leader after his tour: Some well-built and well-equipped health centers are underused, while the usage rate is better in centers where the buildings are dilapidated. Data analysis, which is to be completed in the first quarter of FY2007, will make it possible to quantify through quantitative data and describe through qualitative data the level of these noted deficiencies. The following photos depict the management assessment data collection process in the departments of Zou and Collines. PISAF - ANNUAL REPORT NO. 1 14

20 A data collector administers the data collection tool to four (4) COGECS members in Tchetti in the commune of Savalou. A team leader (the woman in the white blouse seated on the bench) administers the service organization tool to a health center team while a supervisor looks on (the man in civilian dress in the background) PISAF - ANNUAL REPORT NO. 1 15

21 A supervisor from team 7 interviews a client after she received services in the Tchetti health center in the commune of Savalou/Collines: September 15, Observation of a curative IMCI visit by the nurse from team 6 in the Doumè/ Savalou Health Center on September 20, PISAF - ANNUAL REPORT NO. 1 16

22 Supplied computer equipment to the Zou/Collines DDS and HZMT to build their management capacities When PISAF was launched, the following computers and multimedia equipment were issued to the Zou/Collines DDS: ten desktops, ten laptops, ten printers, ten uninterruptible power supplies, ten power strips and one multimedia projector to strengthen the information system in the DDS, departmental hospital and health zones. To streamline and increase security of informationsharing between the zone offices, the department hospital, the ministry in charge and the stakeholders involved in the health sector, additional computer equipment was acquired for the DDS and zone hospitals. This consisted of eight servers, eight uninterruptible power supplies, eight voltage regulators, eight surge protectors, 41 WiFi network cards and 20 audio headsets with multimedia microphones. This equipment will enable the DDS of the Zou/Collines, the departmental hospital in the Zou and the health zones of Zou and Collines to take better advantage of Information and Communication Technologies (ICT). For this purpose, a wireless Internet connection was installed on a local server configured as a wireless client in a LAN/WiFi, and the DDS, CHD and two health zones already have Internet access. The goal is for the DDS to have an Internet identity through its own network and a professional electronic messaging service that can be used both in the Zou/Collines and outside Benin. This service should enable the users to have both a business and also a personal address. Because PISAF started while the 2006 DDS and health zone budget plans were being implemented, it was impossible for these partners to set aside funding in their budgets for monthly Internet access subscription expenses. An agreement was reached among the DDS, departmental hospital, health zones and PISAF that PISAF would pay the subscription costs for the last quarter of These expenses are included in the 2007 budgeted action plans. The work of installing the LAN for the other health zones will continue over the coming months Sub IR 1.3 More effective civil society participation created Prepared mechanisms to involve the NGOs, CBOs and the private sector in the prevention and treatment of malaria and acute respiratory infections (ARIs): Several actions were taken in 2006 that contributed to the establishment of a collaborative spirit that will facilitate future interventions. Identified and made contact with the NGOs, CBOs, women s groups, radio stations and local authorities. In this activity, seven local radio stations that cover all of the communes in the departments of Zou and Collines were identified and contacted. Stations were informed of PISAF s goals and strategies, with particular emphasis on the communication component, in which they have an important role to play. Seven (7) nongovernmental organizations (NGOs) and seventeen (17) women s groups were identified in the two health zones of Savalou-Bantè and Covè-Zangnanado- Ouinhi alone. Considering the important role that local elected officials can play in implementing communitylevel health interventions, a meeting was held with seven (7) local elected officials--mayors and/or councilors--to brief them on PISAF s objectives. Based on the information collected from the Health and Social Promotion Centers (CPS) and from NGOs, there are 110 functional women s groups in Zou and Collines. PISAF - ANNUAL REPORT NO. 1 17

23 All the organizations and officials met hoped for harmonious collaboration with PISAF to strengthen community involvement in health promotion and prevention. The statement made by D. Vidjogni Hounsa, second assistant to the Mayor of Savalou, attests to this: The commune of Salavou will always be by your side and will call on you whenever possible and take part in your activities so that the program reaches its goals for the greater good of the communities. Community mobilization evaluated Workshop to review community mobilization strategies To better direct its interventions in the area of community mobilization, PISAF deemed it necessary to organize an experience-sharing workshop for partners working at the community level in Benin. This exchange will be used to review each experience, its strengths and weaknesses, and the aspects that can be replicated in the context of Zou and Collines. During two trips to the field, PISAF staff met with several organizations, including Catholic Relief Services (CRS), Plan Benin, MCDI, Terres des Hommes and ROBS, as well as health zones that have carried out community mobilization activities using community-based service agents and community IMCI and EONC approaches with the support of projects. These health zones include Tchaourou (MCDI and PROSAF Borgou/Alibori), Bembereke/ Sinende (PROSAF Borgou/Alibori), Malanville/Karimama (PROSAF Borgou/Alibori) and Banikoara (PROSAF Borgou/Alibori). PISAF sought health zones participation in this activity and will write-up their experiences. After these meetings, a consensus was reached for holding this community mobilization strategy review workshop in the first half of October Trained COGECS and supported ascendant planning and other activities: Performed an inventory of the existence and operations of the COGECS An important step before implementing COGECS training is to identify the training needs of the COGECs in Zou/Collines. The different working sessions with the DDS s technical units brought out the fact that the COGECS have not received any training. One exception to this is in Djidja/Abomey/Agbangnizoun) where UNICEF trained COGECS on roles and responsibilities. Thus, an agreement was made with the Zou/Collines DDS to start training the remaining COGECS in roles and responsibilities. However, the problem remains as to which bylaws should be used as a basis for this training, because many bylaws that govern the COGECS were adopted in August 2006 and have not yet been disseminated to the HZMTs. Consequently, it is necessary to repeat the training even for COGECS that were trained earlier, as this training was based on old bylaws, the content of which is now outdated. This training activity for the COGECS will be planned so that it is carried out in the second quarter of FY2007. Grants for the NGOs and CBOs: Preparations for establishing a collaboration framework for awarding grants In preparation for the NGO grant award process, a draft grant procedures manual has been developed, which will be used as a guide for awarding grants to NGOs. The procedures manual specifies the types of organizations to be financed, the process to be used to apply for a grant, PISAF - ANNUAL REPORT NO. 1 18

CEPF FINAL PROJECT COMPLETION REPORT

CEPF FINAL PROJECT COMPLETION REPORT CEPF FINAL PROJECT COMPLETION REPORT I. BASIC DATA Organization Legal Name: Conservation International Madagascar Project Title (as stated in the grant agreement): Knowledge Management: Information & Monitoring.

Plus en détail

AUDIT COMMITTEE: TERMS OF REFERENCE

AUDIT COMMITTEE: TERMS OF REFERENCE AUDIT COMMITTEE: TERMS OF REFERENCE PURPOSE The Audit Committee (the Committee), assists the Board of Trustees to fulfill its oversight responsibilities to the Crown, as shareholder, for the following

Plus en détail

Application Form/ Formulaire de demande

Application Form/ Formulaire de demande Application Form/ Formulaire de demande Ecosystem Approaches to Health: Summer Workshop and Field school Approches écosystémiques de la santé: Atelier intensif et stage d été Please submit your application

Plus en détail

Natixis Asset Management Response to the European Commission Green Paper on shadow banking

Natixis Asset Management Response to the European Commission Green Paper on shadow banking European Commission DG MARKT Unit 02 Rue de Spa, 2 1049 Brussels Belgium markt-consultation-shadow-banking@ec.europa.eu 14 th June 2012 Natixis Asset Management Response to the European Commission Green

Plus en détail

EU- Luxemburg- WHO Universal Health Coverage Partnership:

EU- Luxemburg- WHO Universal Health Coverage Partnership: EU- Luxemburg- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage Year 2 Report Jan. 2013 - - Dec. 2013 [Version

Plus en détail

affichage en français Nom de l'employeur *: Lions Village of Greater Edmonton Society

affichage en français Nom de l'employeur *: Lions Village of Greater Edmonton Society LIONS VILLAGE of Greater Edmonton Society affichage en français Informations sur l'employeur Nom de l'employeur *: Lions Village of Greater Edmonton Society Secteur d'activité de l'employeur *: Développement

Plus en détail

Archived Content. Contenu archivé

Archived Content. Contenu archivé ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject

Plus en détail

Préconisations pour une gouvernance efficace de la Manche. Pathways for effective governance of the English Channel

Préconisations pour une gouvernance efficace de la Manche. Pathways for effective governance of the English Channel Préconisations pour une gouvernance efficace de la Manche Pathways for effective governance of the English Channel Prochaines étapes vers une gouvernance efficace de la Manche Next steps for effective

Plus en détail

Annex 1: OD Initiative Update

Annex 1: OD Initiative Update Fondements du D Cadre de travail stratégique Stratégie de Stratégie de programmes rédigée et Projet de stratégie de programmes partagée avec la Commission programmes Consultative Statut Commentaires/problèmes/

Plus en détail

Quatre axes au service de la performance et des mutations Four lines serve the performance and changes

Quatre axes au service de la performance et des mutations Four lines serve the performance and changes Le Centre d Innovation des Technologies sans Contact-EuraRFID (CITC EuraRFID) est un acteur clé en matière de l Internet des Objets et de l Intelligence Ambiante. C est un centre de ressources, d expérimentations

Plus en détail

COUNCIL OF THE EUROPEAN UNION. Brussels, 18 September 2008 (19.09) (OR. fr) 13156/08 LIMITE PI 53

COUNCIL OF THE EUROPEAN UNION. Brussels, 18 September 2008 (19.09) (OR. fr) 13156/08 LIMITE PI 53 COUNCIL OF THE EUROPEAN UNION Brussels, 18 September 2008 (19.09) (OR. fr) 13156/08 LIMITE PI 53 WORKING DOCUMENT from : Presidency to : delegations No prev. doc.: 12621/08 PI 44 Subject : Revised draft

Plus en détail

POSITION DESCRIPTION DESCRIPTION DE TRAVAIL

POSITION DESCRIPTION DESCRIPTION DE TRAVAIL Supervisor Titre du poste de la superviseure ou du superviseur : Coordinator, Communications & Political Action & Campaigns Coordonnatrice ou coordonnateur de la Section des communications et de l action

Plus en détail

Sub-Saharan African G-WADI

Sub-Saharan African G-WADI Sub-Saharan African G-WADI Regional chapter of the Global network on Water and Development Information for Arid Lands Prof. Cheikh B. Gaye G-WADI Workshop 20-21 April 2010 Dakar, Senegal 35 participants

Plus en détail

Consultation Report / Rapport de consultation REGDOC-2.3.3, Periodic Safety Reviews / Bilans périodiques de la sûreté

Consultation Report / Rapport de consultation REGDOC-2.3.3, Periodic Safety Reviews / Bilans périodiques de la sûreté Consultation Report / Rapport de consultation REGDOC-2.3.3, Periodic Safety Reviews / Bilans périodiques de la sûreté Introduction Regulatory document REGDOC-2.3.3, Periodic Safety Reviews, sets out the

Plus en détail

Discours du Ministre Tassarajen Pillay Chedumbrum. Ministre des Technologies de l'information et de la Communication (TIC) Worshop on Dot.

Discours du Ministre Tassarajen Pillay Chedumbrum. Ministre des Technologies de l'information et de la Communication (TIC) Worshop on Dot. Discours du Ministre Tassarajen Pillay Chedumbrum Ministre des Technologies de l'information et de la Communication (TIC) Worshop on Dot.Mu Date: Jeudi 12 Avril 2012 L heure: 9h15 Venue: Conference Room,

Plus en détail

INSTRUCTIONS. Comment compléter le formulaire. How to complete this form. Instructions

INSTRUCTIONS. Comment compléter le formulaire. How to complete this form. Instructions Instructions INSTRUCTIONS Objet du formulaire Ce formulaire vise à documenter l équivalence de stage d un candidat au permis de géologue par l obtention de diplômes de cycle supérieur. Une déclaration

Plus en détail

Provide supervision and mentorship, on an ongoing basis, to staff and student interns.

Provide supervision and mentorship, on an ongoing basis, to staff and student interns. Manager, McGill Office of Sustainability, MR7256 Position Summary: McGill University seeks a Sustainability Manager to lead the McGill Office of Sustainability (MOOS). The Sustainability Manager will play

Plus en détail

Working Group on Implementation of UNGCP Meeting

Working Group on Implementation of UNGCP Meeting United Nations Guidelines on Consumer Protection Working Group on Implementation of UNGCP Meeting 24 March 2014 10 a.m. and 3.00 p.m. (Geneva time) SUMMARY OF THE MEETING Participants: - Chair: Permanent

Plus en détail

For the attention of all Delegations/ A l attention de toutes les Délégations

For the attention of all Delegations/ A l attention de toutes les Délégations Postal address Adresse postale F-67075 Strasbourg Cedex France With the compliments of the Human Resources Directorate 17 September 2013 Avec les compliments de la Direction des Ressources Humaines DRH(2013)529

Plus en détail

that the child(ren) was/were in need of protection under Part III of the Child and Family Services Act, and the court made an order on

that the child(ren) was/were in need of protection under Part III of the Child and Family Services Act, and the court made an order on ONTARIO Court File Number at (Name of court) Court office address Applicant(s) (In most cases, the applicant will be a children s aid society.) Full legal name & address for service street & number, municipality,

Plus en détail

Instructions Mozilla Thunderbird Page 1

Instructions Mozilla Thunderbird Page 1 Instructions Mozilla Thunderbird Page 1 Instructions Mozilla Thunderbird Ce manuel est écrit pour les utilisateurs qui font déjà configurer un compte de courrier électronique dans Mozilla Thunderbird et

Plus en détail

Cheque Holding Policy Disclosure (Banks) Regulations. Règlement sur la communication de la politique de retenue de chèques (banques) CONSOLIDATION

Cheque Holding Policy Disclosure (Banks) Regulations. Règlement sur la communication de la politique de retenue de chèques (banques) CONSOLIDATION CANADA CONSOLIDATION CODIFICATION Cheque Holding Policy Disclosure (Banks) Regulations Règlement sur la communication de la politique de retenue de chèques (banques) SOR/2002-39 DORS/2002-39 Current to

Plus en détail

NOM ENTREPRISE. Document : Plan Qualité Spécifique du Projet / Project Specific Quality Plan

NOM ENTREPRISE. Document : Plan Qualité Spécifique du Projet / Project Specific Quality Plan Document : Plan Qualité Spécifique du Projet Project Specific Quality Plan Référence Reference : QP-3130-Rev 01 Date Date : 12022008 Nombre de Pages Number of Pages : 6 Projet Project : JR 100 Rédacteur

Plus en détail

Sustainability Monitoring and Reporting: Tracking Your Community s Sustainability Performance

Sustainability Monitoring and Reporting: Tracking Your Community s Sustainability Performance Sustainability Monitoring and Reporting: Tracking Your Community s Sustainability Performance Thursday, February 11 th, 2011 FCM Sustainable Communities Conference, Victoria, BC The Agenda 1. Welcome and

Plus en détail

CONVENTION DE STAGE TYPE STANDART TRAINING CONTRACT

CONVENTION DE STAGE TYPE STANDART TRAINING CONTRACT CONVENTION DE STAGE TYPE STANDART TRAINING CONTRACT La présente convention a pour objet de définir les conditions dans lesquelles le stagiaire ci-après nommé sera accueilli dans l entreprise. This contract

Plus en détail

First Nations Assessment Inspection Regulations. Règlement sur l inspection aux fins d évaluation foncière des premières nations CONSOLIDATION

First Nations Assessment Inspection Regulations. Règlement sur l inspection aux fins d évaluation foncière des premières nations CONSOLIDATION CANADA CONSOLIDATION CODIFICATION First Nations Assessment Inspection Regulations Règlement sur l inspection aux fins d évaluation foncière des premières nations SOR/2007-242 DORS/2007-242 Current to September

Plus en détail

Nouveautés printemps 2013

Nouveautés printemps 2013 » English Se désinscrire de la liste Nouveautés printemps 2013 19 mars 2013 Dans ce Flash Info, vous trouverez une description des nouveautés et mises à jour des produits La Capitale pour le printemps

Plus en détail

Rountable conference on the revision of meat inspection Presentation of the outcome of the Lyon conference

Rountable conference on the revision of meat inspection Presentation of the outcome of the Lyon conference Rountable conference on the revision of meat inspection Presentation of the outcome of the Lyon conference Brussels 18 May 2010- Dr Pascale GILLI-DUNOYER General Directorate for Food Ministry of Food,

Plus en détail

RESTRUCTURATION DES PROGRAMMES DE SOUTIEN AUX GOUVERNEMENTS INDIENS REDESIGN OF THE INDIAN GOVERNMENT SUPPORT PROGRAMS. Chef et membres du Conseil,

RESTRUCTURATION DES PROGRAMMES DE SOUTIEN AUX GOUVERNEMENTS INDIENS REDESIGN OF THE INDIAN GOVERNMENT SUPPORT PROGRAMS. Chef et membres du Conseil, REDESIGN OF THE INDIAN GOVERNMENT SUPPORT PROGRAMS RESTRUCTURATION DES PROGRAMMES DE SOUTIEN AUX GOUVERNEMENTS INDIENS Dear Chief and Council, I am writing to update you on the progress that has been made

Plus en détail

Mise en place d un système de cabotage maritime au sud ouest de l Ocean Indien. 10 Septembre 2012

Mise en place d un système de cabotage maritime au sud ouest de l Ocean Indien. 10 Septembre 2012 Mise en place d un système de cabotage maritime au sud ouest de l Ocean Indien 10 Septembre 2012 Les défis de la chaine de la logistique du transport maritime Danielle T.Y WONG Director Logistics Performance

Plus en détail

Support Orders and Support Provisions (Banks and Authorized Foreign Banks) Regulations

Support Orders and Support Provisions (Banks and Authorized Foreign Banks) Regulations CANADA CONSOLIDATION CODIFICATION Support Orders and Support Provisions (Banks and Authorized Foreign Banks) Regulations Règlement sur les ordonnances alimentaires et les dispositions alimentaires (banques

Plus en détail

Name of document. Audit Report on the CORTE Quality System: confirmation of the certification (October 2011) Prepared by.

Name of document. Audit Report on the CORTE Quality System: confirmation of the certification (October 2011) Prepared by. AUDIT REPORT ON THE CORTE QUALITY SYSTEM: CONFIRMATION OF THE CERTIFICATION (OCTOBER 2011) Name of document Prepared by Audit Report on the CORTE Quality System: confirmation of the certification (October

Plus en détail

Action concrète 14 Répertoire des compétences Féminines Africaines en Diaspora : Coopérer pour transcender en réalité

Action concrète 14 Répertoire des compétences Féminines Africaines en Diaspora : Coopérer pour transcender en réalité NGO official partner of UNESCO (consultative status) and in Special consultative status with the United Nations ECOSOC since 2012 Millennia2015, "An action plan for women's empowerment", Foresight research

Plus en détail

Manager, Construction and Engineering Procurement. Please apply through AECL website:

Manager, Construction and Engineering Procurement. Please apply through AECL website: Position: Location: How to Apply: Manager, Construction and Engineering Procurement Chalk River, Ontario Please apply through AECL website: http://www.recruitingsite.com/csbsites/aecl/en/jobdescription.asp?jobnumber=709148

Plus en détail

FCM 2015 ANNUAL CONFERENCE AND TRADE SHOW Terms and Conditions for Delegates and Companions Shaw Convention Centre, Edmonton, AB June 5 8, 2015

FCM 2015 ANNUAL CONFERENCE AND TRADE SHOW Terms and Conditions for Delegates and Companions Shaw Convention Centre, Edmonton, AB June 5 8, 2015 FCM 2015 ANNUAL CONFERENCE AND TRADE SHOW Terms and Conditions for Delegates and Companions Shaw Convention Centre, Edmonton, AB June 5 8, 2015 Early-bird registration Early-bird registration ends April

Plus en détail

WEST AFRICA INTERNET GOVERNACE FIFTH GLOBAL INTERNET GOVERNACE FORUM. 14th to 17th Septembre 2010 VILNIUS, LITHUANIA. Participants REPORT

WEST AFRICA INTERNET GOVERNACE FIFTH GLOBAL INTERNET GOVERNACE FORUM. 14th to 17th Septembre 2010 VILNIUS, LITHUANIA. Participants REPORT WEST AFRICA INTERNET GOVERNACE FIFTH GLOBAL INTERNET GOVERNACE FORUM 14th to 17th Septembre 2010 VILNIUS, LITHUANIA Participants REPORT Introduction : The fifth Global forum on internet governance was

Plus en détail

APPENDIX 6 BONUS RING FORMAT

APPENDIX 6 BONUS RING FORMAT #4 EN FRANÇAIS CI-DESSOUS Preamble and Justification This motion is being presented to the membership as an alternative format for clubs to use to encourage increased entries, both in areas where the exhibitor

Plus en détail

Projet de réorganisation des activités de T-Systems France

Projet de réorganisation des activités de T-Systems France Informations aux medias Saint-Denis, France, 13 Février 2013 Projet de réorganisation des activités de T-Systems France T-Systems France a présenté à ses instances représentatives du personnel un projet

Plus en détail

ONTARIO Court File Number. Form 17E: Trial Management Conference Brief. Date of trial management conference. Name of party filing this brief

ONTARIO Court File Number. Form 17E: Trial Management Conference Brief. Date of trial management conference. Name of party filing this brief ONTARIO Court File Number at (Name of court) Court office address Form 17E: Trial Management Conference Brief Name of party filing this brief Date of trial management conference Applicant(s) Full legal

Plus en détail

How to Login to Career Page

How to Login to Career Page How to Login to Career Page BASF Canada July 2013 To view this instruction manual in French, please scroll down to page 16 1 Job Postings How to Login/Create your Profile/Sign Up for Job Posting Notifications

Plus en détail

THE OUAGADOUGOU RECOMMENDATIONS INTERNET INFRASTRUCTURE FOR AN AFRICAN DIGITAL ECONOMY 5-7 MARCH 2012

THE OUAGADOUGOU RECOMMENDATIONS INTERNET INFRASTRUCTURE FOR AN AFRICAN DIGITAL ECONOMY 5-7 MARCH 2012 THE OUAGADOUGOU RECOMMENDATIONS INTERNET INFRASTRUCTURE FOR AN AFRICAN DIGITAL ECONOMY 5-7 MARCH 2012 We, the participants, assembled in Ouagadougou, Burkina Faso, from 5-7 March 2012, for the meeting

Plus en détail

UPFI URBAN PROJECTS FINANCE INITIATIVE

UPFI URBAN PROJECTS FINANCE INITIATIVE UPFI URBAN PROJECTS FINANCE INITIATIVE Union pour la Méditerranée Union for the Mediterranean Lors de la conférence ministérielle des 9 et 10 novembre 2011 à Strasbourg sur le développement urbain durable,

Plus en détail

Compléter le formulaire «Demande de participation» et l envoyer aux bureaux de SGC* à l adresse suivante :

Compléter le formulaire «Demande de participation» et l envoyer aux bureaux de SGC* à l adresse suivante : FOIRE AUX QUESTIONS COMMENT ADHÉRER? Compléter le formulaire «Demande de participation» et l envoyer aux bureaux de SGC* à l adresse suivante : 275, boul des Braves Bureau 310 Terrebonne (Qc) J6W 3H6 La

Plus en détail

APPENDIX 2. Provisions to be included in the contract between the Provider and the. Holder

APPENDIX 2. Provisions to be included in the contract between the Provider and the. Holder Page 1 APPENDIX 2 Provisions to be included in the contract between the Provider and the Obligations and rights of the Applicant / Holder Holder 1. The Applicant or Licensee acknowledges that it has read

Plus en détail

iqtool - Outil e-learning innovateur pour enseigner la Gestion de Qualité au niveau BAC+2

iqtool - Outil e-learning innovateur pour enseigner la Gestion de Qualité au niveau BAC+2 iqtool - Outil e-learning innovateur pour enseigner la Gestion de Qualité au niveau BAC+2 134712-LLP-2007-HU-LEONARDO-LMP 1 Information sur le projet iqtool - Outil e-learning innovateur pour enseigner

Plus en détail

EN UNE PAGE PLAN STRATÉGIQUE

EN UNE PAGE PLAN STRATÉGIQUE EN UNE PAGE PLAN STRATÉGIQUE PLAN STRATÉGIQUE EN UNE PAGE Nom de l entreprise Votre nom Date VALEUR PRINCIPALES/CROYANCES (Devrait/Devrait pas) RAISON (Pourquoi) OBJECTIFS (- AN) (Où) BUT ( AN) (Quoi)

Plus en détail

ETABLISSEMENT D ENSEIGNEMENT OU ORGANISME DE FORMATION / UNIVERSITY OR COLLEGE:

ETABLISSEMENT D ENSEIGNEMENT OU ORGANISME DE FORMATION / UNIVERSITY OR COLLEGE: 8. Tripartite internship agreement La présente convention a pour objet de définir les conditions dans lesquelles le stagiaire ci-après nommé sera accueilli dans l entreprise. This contract defines the

Plus en détail

Consultants en coûts - Cost Consultants

Consultants en coûts - Cost Consultants Respecter l échéancier et le budget est-ce possible? On time, on budget is it possible? May, 2010 Consultants en coûts - Cost Consultants Boulletin/Newsletter Volume 8 Mai ( May),2010 1 866 694 6494 info@emangepro.com

Plus en détail

Gestion des prestations Volontaire

Gestion des prestations Volontaire Gestion des prestations Volontaire Qu estce que l Income Management (Gestion des prestations)? La gestion des prestations est un moyen de vous aider à gérer votre argent pour couvrir vos nécessités et

Plus en détail

Statement of the European Council of Medical Orders on telemedicine

Statement of the European Council of Medical Orders on telemedicine Statement of the European Council of Medical Orders on telemedicine The CEOM statement on telemedicine was formally adopted by its participating organisations during the CEOM plenary meeting held in Bari

Plus en détail

INVESTMENT REGULATIONS R-090-2001 In force October 1, 2001. RÈGLEMENT SUR LES INVESTISSEMENTS R-090-2001 En vigueur le 1 er octobre 2001

INVESTMENT REGULATIONS R-090-2001 In force October 1, 2001. RÈGLEMENT SUR LES INVESTISSEMENTS R-090-2001 En vigueur le 1 er octobre 2001 FINANCIAL ADMINISTRATION ACT INVESTMENT REGULATIONS R-090-2001 In force October 1, 2001 LOI SUR LA GESTION DES FINANCES PUBLIQUES RÈGLEMENT SUR LES INVESTISSEMENTS R-090-2001 En vigueur le 1 er octobre

Plus en détail

Institut d Acclimatation et de Management interculturels Institute of Intercultural Management and Acclimatisation

Institut d Acclimatation et de Management interculturels Institute of Intercultural Management and Acclimatisation Institut d Acclimatation et de Management interculturels Institute of Intercultural Management and Acclimatisation www.terresneuves.com Institut d Acclimatation et de Management interculturels Dans un

Plus en détail

Technical Assistance for Sustainable National Greenhouse Gas Inventory Management Systems in West Africa (West Africa GHG Project)

Technical Assistance for Sustainable National Greenhouse Gas Inventory Management Systems in West Africa (West Africa GHG Project) Technical Assistance for Sustainable National Greenhouse Gas Inventory Management Systems in West Africa (West Africa GHG Project) Dr. Sabin Guendehou, Regional Project Coordinator Cluster Francophone

Plus en détail

RÉSUMÉ DE THÈSE. L implantation des systèmes d'information (SI) organisationnels demeure une tâche difficile

RÉSUMÉ DE THÈSE. L implantation des systèmes d'information (SI) organisationnels demeure une tâche difficile RÉSUMÉ DE THÈSE L implantation des systèmes d'information (SI) organisationnels demeure une tâche difficile avec des estimations de deux projets sur trois peinent à donner un résultat satisfaisant (Nelson,

Plus en détail

Comprendre l impact de l utilisation des réseaux sociaux en entreprise SYNTHESE DES RESULTATS : EUROPE ET FRANCE

Comprendre l impact de l utilisation des réseaux sociaux en entreprise SYNTHESE DES RESULTATS : EUROPE ET FRANCE Comprendre l impact de l utilisation des réseaux sociaux en entreprise SYNTHESE DES RESULTATS : EUROPE ET FRANCE 1 Objectifs de l étude Comprendre l impact des réseaux sociaux externes ( Facebook, LinkedIn,

Plus en détail

GEIDE MSS /IGSS. The electronic document management system shared by the Luxembourg

GEIDE MSS /IGSS. The electronic document management system shared by the Luxembourg GEIDE MSS /IGSS The electronic document management system shared by the Luxembourg Social Security Ministry and IGSS Introduction: The administrative context IGSS missions Legal and international affairs

Plus en détail

Township of Russell: Recreation Master Plan Canton de Russell: Plan directeur de loisirs

Township of Russell: Recreation Master Plan Canton de Russell: Plan directeur de loisirs Township of Russell: Recreation Master Plan Canton de Russell: Plan directeur de loisirs Project Introduction and Stakeholder Consultation Introduction du projet et consultations publiques Agenda/Aperçu

Plus en détail

Forthcoming Database

Forthcoming Database DISS.ETH NO. 15802 Forthcoming Database A Framework Approach for Data Visualization Applications A dissertation submitted to the SWISS FEDERAL INSTITUTE OF TECHNOLOGY ZURICH for the degree of Doctor of

Plus en détail

Paxton. ins-20605. Net2 desktop reader USB

Paxton. ins-20605. Net2 desktop reader USB Paxton ins-20605 Net2 desktop reader USB 1 3 2 4 1 2 Desktop Reader The desktop reader is designed to sit next to the PC. It is used for adding tokens to a Net2 system and also for identifying lost cards.

Plus en détail

LE FORMAT DES RAPPORTS DU PERSONNEL DES COMMISSIONS DE DISTRICT D AMENAGEMENT FORMAT OF DISTRICT PLANNING COMMISSION STAFF REPORTS

LE FORMAT DES RAPPORTS DU PERSONNEL DES COMMISSIONS DE DISTRICT D AMENAGEMENT FORMAT OF DISTRICT PLANNING COMMISSION STAFF REPORTS FORMAT OF DISTRICT PLANNING COMMISSION STAFF REPORTS LE FORMAT DES RAPPORTS DU PERSONNEL DES COMMISSIONS DE DISTRICT D AMENAGEMENT A Guideline on the Format of District Planning Commission Staff Reports

Plus en détail

Railway Operating Certificate Regulations. Règlement sur les certificats d exploitation de chemin de fer CODIFICATION CONSOLIDATION

Railway Operating Certificate Regulations. Règlement sur les certificats d exploitation de chemin de fer CODIFICATION CONSOLIDATION CANADA CONSOLIDATION CODIFICATION Railway Operating Certificate Regulations Règlement sur les certificats d exploitation de chemin de fer SOR/2014-258 DORS/2014-258 Current to September 10, 2015 À jour

Plus en détail

SMALL CITY COMMERCE (EL PEQUEÑO COMERCIO DE LAS PEQUEÑAS CIUDADES)

SMALL CITY COMMERCE (EL PEQUEÑO COMERCIO DE LAS PEQUEÑAS CIUDADES) CIUDADES) ES/08/LLP-LdV/TOI/149019 1 Project Information Title: Project Number: SMALL CITY COMMERCE (EL PEQUEÑO COMERCIO DE LAS PEQUEÑAS CIUDADES) ES/08/LLP-LdV/TOI/149019 Year: 2008 Project Type: Status:

Plus en détail

AMENDMENT TO BILL 32 AMENDEMENT AU PROJET DE LOI 32

AMENDMENT TO BILL 32 AMENDEMENT AU PROJET DE LOI 32 THAT the proposed clause 6(1), as set out in Clause 6(1) of the Bill, be replaced with the following: Trustee to respond promptly 6(1) A trustee shall respond to a request as promptly as required in the

Plus en détail

Editing and managing Systems engineering processes at Snecma

Editing and managing Systems engineering processes at Snecma Editing and managing Systems engineering processes at Snecma Atego workshop 2014-04-03 Ce document et les informations qu il contient sont la propriété de Ils ne doivent pas être copiés ni communiqués

Plus en détail

LOI SUR LE PROGRAMME DE TRAVAUX COMPENSATOIRES L.R.T.N.-O. 1988, ch. F-5. FINE OPTION ACT R.S.N.W.T. 1988,c.F-5

LOI SUR LE PROGRAMME DE TRAVAUX COMPENSATOIRES L.R.T.N.-O. 1988, ch. F-5. FINE OPTION ACT R.S.N.W.T. 1988,c.F-5 FINE OPTION ACT R.S.N.W.T. 1988,c.F-5 LOI SUR LE PROGRAMME DE TRAVAUX COMPENSATOIRES L.R.T.N.-O. 1988, ch. F-5 INCLUDING AMENDMENTS MADE BY S.N.W.T. 1997,c.3 S.N.W.T. 2003,c.31 In force April 1, 2004;

Plus en détail

Mon Service Public - Case study and Mapping to SAML/Liberty specifications. Gaël Gourmelen - France Telecom 23/04/2007

Mon Service Public - Case study and Mapping to SAML/Liberty specifications. Gaël Gourmelen - France Telecom 23/04/2007 Mon Service Public - Case study and Mapping to SAML/Liberty specifications Gaël Gourmelen - France Telecom 23/04/2007 Agenda Brief presentation of the "Mon Service Public" project (main features) Detailed

Plus en détail

We Generate. You Lead.

We Generate. You Lead. www.contact-2-lead.com We Generate. You Lead. PROMOTE CONTACT 2 LEAD 1, Place de la Libération, 73000 Chambéry, France. 17/F i3 Building Asiatown, IT Park, Apas, Cebu City 6000, Philippines. HOW WE CAN

Plus en détail

Cliquez pour modifier les styles du texte du masque

Cliquez pour modifier les styles du texte du masque Cliquez pour modifier les styles du texte du Building & Utilities maintenance at SOLEIL Journée SINERGY 1 Utilities parameters The group Bât Infra guarantees the supply of the utilities in the SYNCHROTRON:

Plus en détail

Frequently Asked Questions

Frequently Asked Questions GS1 Canada-1WorldSync Partnership Frequently Asked Questions 1. What is the nature of the GS1 Canada-1WorldSync partnership? GS1 Canada has entered into a partnership agreement with 1WorldSync for the

Plus en détail

Language requirement: Bilingual non-mandatory - Level 222/222. Chosen candidate will be required to undertake second language training.

Language requirement: Bilingual non-mandatory - Level 222/222. Chosen candidate will be required to undertake second language training. This Category II position is open to all interested parties. Toutes les personnes intéressées peuvent postuler ce poste de catégorie II. Senior Manager, Network and Systems Services Non-Public Funds Information

Plus en détail

Credit Note and Debit Note Information (GST/ HST) Regulations

Credit Note and Debit Note Information (GST/ HST) Regulations CANADA CONSOLIDATION CODIFICATION Credit Note and Debit Note Information (GST/ HST) Regulations Règlement sur les renseignements à inclure dans les notes de crédit et les notes de débit (TPS/ TVH) SOR/91-44

Plus en détail

Règlement sur le télémarketing et les centres d'appel. Call Centres Telemarketing Sales Regulation

Règlement sur le télémarketing et les centres d'appel. Call Centres Telemarketing Sales Regulation THE CONSUMER PROTECTION ACT (C.C.S.M. c. C200) Call Centres Telemarketing Sales Regulation LOI SUR LA PROTECTION DU CONSOMMATEUR (c. C200 de la C.P.L.M.) Règlement sur le télémarketing et les centres d'appel

Plus en détail

Interest Rate for Customs Purposes Regulations. Règlement sur le taux d intérêt aux fins des douanes CONSOLIDATION CODIFICATION

Interest Rate for Customs Purposes Regulations. Règlement sur le taux d intérêt aux fins des douanes CONSOLIDATION CODIFICATION CANADA CONSOLIDATION CODIFICATION Interest Rate for Customs Purposes Regulations Règlement sur le taux d intérêt aux fins des douanes SOR/86-1121 DORS/86-1121 Current to August 4, 2015 À jour au 4 août

Plus en détail

TABLE DES MATIERES A OBJET PROCEDURE DE CONNEXION

TABLE DES MATIERES A OBJET PROCEDURE DE CONNEXION 1 12 rue Denis Papin 37300 JOUE LES TOURS Tel: 02.47.68.34.00 Fax: 02.47.68.35.48 www.herve consultants.net contacts@herve consultants.net TABLE DES MATIERES A Objet...1 B Les équipements et pré-requis...2

Plus en détail

Deadline(s): Assignment: in week 8 of block C Exam: in week 7 (oral exam) and in the exam week (written exam) of block D

Deadline(s): Assignment: in week 8 of block C Exam: in week 7 (oral exam) and in the exam week (written exam) of block D ICM STUDENT MANUAL French 2 JIC-FRE2.2V-12 Module Change Management and Media Research Study Year 2 1. Course overview Books: Français.com, niveau intermédiaire, livre d élève+ dvd- rom, 2ième édition,

Plus en détail

Small Businesses support Senator Ringuette s bill to limit credit card acceptance fees

Small Businesses support Senator Ringuette s bill to limit credit card acceptance fees For Immediate Release October 10, 2014 Small Businesses support Senator Ringuette s bill to limit credit card acceptance fees The Senate Standing Committee on Banking, Trade, and Commerce resumed hearings

Plus en détail

UNIVERSITE DE YAOUNDE II

UNIVERSITE DE YAOUNDE II UNIVERSITE DE YAOUNDE II The UNIVERSITY OF YAOUNDE II INSTITUT DES RELATIONS INTERNATIONALES DU CAMEROUN INTERNATIONAL RELATIONS INSTITUTE OF CAMEROON B.P. 1637 YAOUNDE -CAMEROUN Tél. 22 31 03 05 Fax (237)

Plus en détail

INDUSTRY CANADA / INDUSTRIE CANADA RFP #IC401468/ DDP #IC401468. Retirement Planning Training / Cours de planification de la retraite

INDUSTRY CANADA / INDUSTRIE CANADA RFP #IC401468/ DDP #IC401468. Retirement Planning Training / Cours de planification de la retraite INDUSTRY CANADA / INDUSTRIE CANADA RFP #IC401468/ DDP #IC401468 Retirement Planning Training / Cours de planification de la retraite AMENDMENT NO. 1 / AMENDEMENT NO.1 This document is issued to answer

Plus en détail

NORME INTERNATIONALE INTERNATIONAL STANDARD. Dispositifs à semiconducteurs Dispositifs discrets. Semiconductor devices Discrete devices

NORME INTERNATIONALE INTERNATIONAL STANDARD. Dispositifs à semiconducteurs Dispositifs discrets. Semiconductor devices Discrete devices NORME INTERNATIONALE INTERNATIONAL STANDARD CEI IEC 747-6-3 QC 750113 Première édition First edition 1993-11 Dispositifs à semiconducteurs Dispositifs discrets Partie 6: Thyristors Section trois Spécification

Plus en détail

LOI SUR LE RÉGIME D ASSURANCE COLLECTIVE DE LA FONCTION PUBLIQUE PUBLIC SERVICE GROUP INSURANCE BENEFIT PLAN ACT

LOI SUR LE RÉGIME D ASSURANCE COLLECTIVE DE LA FONCTION PUBLIQUE PUBLIC SERVICE GROUP INSURANCE BENEFIT PLAN ACT PUBLIC SERVICE GROUP INSURANCE BENEFIT PLAN ACT LOI SUR LE RÉGIME D ASSURANCE COLLECTIVE DE LA FONCTION PUBLIQUE Application of this Act 1(1) This Act applies to the following (a) persons employed by the

Plus en détail

Dans une agence de location immobilière...

Dans une agence de location immobilière... > Dans une agence de location immobilière... In a property rental agency... dans, pour et depuis vocabulaire: «une location» et «une situation» Si vous voulez séjourner à Lyon, vous pouvez louer un appartement.

Plus en détail

accidents and repairs:

accidents and repairs: accidents and repairs: putting the pieces together accidents et réparations : réunir le tout nobody can repair your Toyota like Toyota Unfortunately, accidents do happen. And the best way to restore your

Plus en détail

Improving the breakdown of the Central Credit Register data by category of enterprises

Improving the breakdown of the Central Credit Register data by category of enterprises Improving the breakdown of the Central Credit Register data by category of enterprises Workshop on Integrated management of micro-databases Deepening business intelligence within central banks statistical

Plus en détail

INDIVIDUALS AND LEGAL ENTITIES: If the dividends have not been paid yet, you may be eligible for the simplified procedure.

INDIVIDUALS AND LEGAL ENTITIES: If the dividends have not been paid yet, you may be eligible for the simplified procedure. Recipient s name 5001-EN For use by the foreign tax authority CALCULATION OF WITHHOLDING TAX ON DIVIDENDS Attachment to Form 5000 12816*01 INDIVIDUALS AND LEGAL ENTITIES: If the dividends have not been

Plus en détail

The new consumables catalogue from Medisoft is now updated. Please discover this full overview of all our consumables available to you.

The new consumables catalogue from Medisoft is now updated. Please discover this full overview of all our consumables available to you. General information 120426_CCD_EN_FR Dear Partner, The new consumables catalogue from Medisoft is now updated. Please discover this full overview of all our consumables available to you. To assist navigation

Plus en détail

Tier 1 / Tier 2 relations: Are the roles changing?

Tier 1 / Tier 2 relations: Are the roles changing? Tier 1 / Tier 2 relations: Are the roles changing? Alexandre Loire A.L.F.A Project Manager July, 5th 2007 1. Changes to roles in customer/supplier relations a - Distribution Channels Activities End customer

Plus en détail

BNP Paribas Personal Finance

BNP Paribas Personal Finance BNP Paribas Personal Finance Financially fragile loan holder prevention program CUSTOMERS IN DIFFICULTY: QUICKER IDENTIFICATION MEANS BETTER SUPPORT Brussels, December 12th 2014 Why BNPP PF has developed

Plus en détail

Contrôle d'accès Access control. Notice technique / Technical Manual

Contrôle d'accès Access control. Notice technique / Technical Manual p.1/18 Contrôle d'accès Access control INFX V2-AI Notice technique / Technical Manual p.2/18 Sommaire / Contents Remerciements... 3 Informations et recommandations... 4 Caractéristiques techniques... 5

Plus en détail

MANAGEMENT SOFTWARE FOR STEEL CONSTRUCTION

MANAGEMENT SOFTWARE FOR STEEL CONSTRUCTION Ficep Group Company MANAGEMENT SOFTWARE FOR STEEL CONSTRUCTION KEEP ADVANCING " Reach your expectations " ABOUT US For 25 years, Steel Projects has developed software for the steel fabrication industry.

Plus en détail

Notice Technique / Technical Manual

Notice Technique / Technical Manual Contrôle d accès Access control Encodeur USB Mifare ENCOD-USB-AI Notice Technique / Technical Manual SOMMAIRE p.2/10 Sommaire Remerciements... 3 Informations et recommandations... 4 Caractéristiques techniques...

Plus en détail

Disclosure on Account Opening by Telephone Request (Trust and Loan Companies) Regulations

Disclosure on Account Opening by Telephone Request (Trust and Loan Companies) Regulations CANADA CONSOLIDATION CODIFICATION Disclosure on Account Opening by Telephone Request (Trust and Loan Companies) Regulations Règlement sur la communication en cas de demande téléphonique d ouverture de

Plus en détail

Conseillère : Stephanie Penwarden

Conseillère : Stephanie Penwarden REPORT OF THE FINANCE AND BY-LAWS AND REGULATIONS RESOLUTIONS COMMITTEE To the 6 th NATIONAL CAPITAL REGION TRIENNIAL CONVENTION of the PUBLIC SERVICE ALLIANCE OF CANADA May 9-11, 2014 HÔTEL LAC LEAMY,

Plus en détail

Enhancing cybersecurity in LDCs thru multi-stakeholder networking and free software

Enhancing cybersecurity in LDCs thru multi-stakeholder networking and free software WSIS cluster action line C5 22-23 may 2008 Pierre OUEDRAOGO, Institut de la Francophonie Numérique (IFN) pierre.ouedraogo@francophonie.org Enhancing cybersecurity in LDCs thru multi-stakeholder networking

Plus en détail

WEB page builder and server for SCADA applications usable from a WEB navigator

WEB page builder and server for SCADA applications usable from a WEB navigator Générateur de pages WEB et serveur pour supervision accessible à partir d un navigateur WEB WEB page builder and server for SCADA applications usable from a WEB navigator opyright 2007 IRAI Manual Manuel

Plus en détail

CADETS CATO 11-06 OAIC 11-06

CADETS CATO 11-06 OAIC 11-06 OFFICIAL CADET WEBSITES PURPOSE 1. This policy details the creation, management and approval process of official Cadet websites. AUTHORITY 2. The Director Cadets (D Cdts) is responsible through the Vice-Chief

Plus en détail

EnerSys Canada Inc. Policy on. Accessibility Standard For Customer Service

EnerSys Canada Inc. Policy on. Accessibility Standard For Customer Service EnerSys Canada Inc. Policy on Accessibility Standard For Customer Service The customer service standard applies to every organization that provides goods and services to the public or third parties and

Plus en détail

Le projet WIKIWATER The WIKIWATER project

Le projet WIKIWATER The WIKIWATER project Le projet WIKIWATER The WIKIWATER project Eau et assainissement pour tous Water and sanitation for all Faire connaitre facilement les moyens techniques, financiers, éducatifs ou de gouvernance pour faciliter

Plus en détail

Appointment or Deployment of Alternates Regulations. Règlement sur la nomination ou la mutation de remplaçants CONSOLIDATION CODIFICATION

Appointment or Deployment of Alternates Regulations. Règlement sur la nomination ou la mutation de remplaçants CONSOLIDATION CODIFICATION CANADA CONSOLIDATION CODIFICATION Appointment or Deployment of Alternates Regulations Règlement sur la nomination ou la mutation de remplaçants SOR/2012-83 DORS/2012-83 Current to August 30, 2015 À jour

Plus en détail

Bureau 17 septembre 2013 à 18h00 GSD 211. Board September 17, 2013 at 6:00 PM GSD 211 ITEM. Appel à l ordre : 18h10. 1 Call to Order: 6:10 pm

Bureau 17 septembre 2013 à 18h00 GSD 211. Board September 17, 2013 at 6:00 PM GSD 211 ITEM. Appel à l ordre : 18h10. 1 Call to Order: 6:10 pm Procès verbal Bureau 17 septembre 2013 à 18h00 GSD 211 Appel à l ordre : 18h10 Présent.e.s: Interne, vie étudiante, externe, affaires universitaires, finances, Najib Khan, Nicholas Jobidon, coordonnateur

Plus en détail

Faits saillants et survol des résultats du sondage

Faits saillants et survol des résultats du sondage NORMES PROFESSIONNELLES NATIONALES pour les gestionnaires de ressources bénévoles Préparer les prochaines étapes Résultats du sondage d'octobre 2012 Merci aux membres qui ont pris le temps de répondre

Plus en détail