PRESENTATION EnerCiel Tunisie UPC Renewables Mai 2011
Italian Vento Power Corporation (IVPC) 1995-2005 - @ 700 MWs (V40, V42, V44, V47, V52, G52, V80-1000+ machines) - Fabrication Turbines Vestas à Taranto (IT) - Les Plus Grands Financements Mondiaux dans le Secteur Eolien - Taux de Disponibilité Supérieur à 98,5% (moyenne 6 ans)
UPC Wind Partners (First Wind) 2001 Présent - @ 300+ MWs Opérationnel (GE 1.5 SL/GE 1.5 SLE/Clipper 2.5) - 400 MWs en Phase de Construction 2009 (GE et Clipper) - Premier Développeur à Financer les Machines Clipper - Pipeline de 3000 MWs (2010 2015) This announcement appears as a matter of record only $69.5 Million Senior and Structurally Subordinated Debt Facilities 30 MW Wind Power Project Maui, Hawaii Maui s First Commercial Scale Wind Farm (Project Sponsors) (Arranger and Administrative Agent) March 2005
UPC Renewables (Chine) 2006 Présent - plus de 200 MWs en Phase d Opération en Chine (Guodian) - 150 MWs en Phase de Construction (Sinovel/Goldwind) - 200-300 MWs en Phase de Construction Par Ans Après - Pipeline de 3500 MWs (2010 2017) - Financement «Global Environment Fund» pour USD 30 000 000 (2010)
UPC Renewables (Philippines) 2006 Présent - 80 MWs en Phase de Financement - Installation en 2012 - Pipeline de 300-400 MWs (2012-2015) - Financement «Climate Change Capital» pour USD 2 500 000 (2009)
EnerCiel Tunisie - UPC Renewables (MENA) - 500+ MWs en Tunisie (5 Sites) - 120 MW et 50 MWs au Maroc (2 Sites) - Études Avancées - Resource de Vent - Société Spécialisée dans le Montage des Mats de Mesure (Gish)
SITE SIDI ABDERAHMANE - CAP BON Mast 60m : 1 installed 21/03/10 Mast 30m : 8 installed/ 17/02/99, 11/09/99, 16/09/99, 23/09/99, 30/09/99 16/02/00, 16/08/00, 23/08/00 Land arrangments: 30 years lease agreement / Ministry of Agriculture/forest department: 100 hectares on the ridge line. Interconnection: ti 4Km from the substation to Grombalia/Menzel Temime 90 KVA line. 17 KM to the Menzel Temime substation.
Site Sidi Abderahmane
SITE HZEIZIA - CAP BON Wind Masts: Mast 30m : 1 Installed, 16/03/02 Land arrangements: 20 years Lease agreement Ministry of Agriculture/Forest Department, renewable for 20 years. 5 Hectares on the ridge line. Interconnection: 4km from the 90 Kva line Grombalia/Menzel Temime
Site Hzaizia
SITE HAOUARIA - CAP BON Wind Masts : Mast 30m : 1 Installed, 19/03/02 Land arrangements : 20 years lease agreement / Ministry of Agriculture/Forest Department, renewable for 20 years. 4 Hectars on the ridge line. Interconnection : 30km from the 90 Kva line Grombalia/Menzel Temime and 3 km Interconnection : 30km from the 90 Kva line Grombalia/Menzel Temime and 3 km from the new substation used for Sidi Daoud Wind farm.
Site Haouaria
SITE ZOUNKAR/HOUICHET - NORTH/NORTH WEST Wind Masts : Zounkar : Mast 30m & 10m : 6, Installed, 8/11/00, 25/12/00, 15/02/01, 22/02/01, 22/06/01, 28/06/01 Houichet : 30m : 1 /installed, 25/06/01 Land arrangement s: Most of the land is private. Purchased and lease more than 85% of the land. We bought more than 90 hectares and have lease for 9 turbines. Interconnection : The 90KVa line is 8 to 9 km from the first ridge line.
Site Zounkar
SITE KECHABTA NORTH/TN Wind Masts : Mast 30m ; 2, Installed 29/05/99, 17/11/99 Land arrangements : Most of the land is private and acquired through purchase. We have more than 50 hectares on the ridge line, representing a capacity of 60 to 80Mws. Interconnection: The Menzel Bourguiba/Menzel Jemil 90KVa line crossing the area is 2 km far from the site. The site is also 7km from the 225Kva line Mnihla/M.Jemil.
Site Kechabta
Les phases de développement - Etudes du vent (installation de mats de mesure). - Contrôle du foncier - Analyse des technologies et leurs acheminement jusqu aux sites - Etude de l évacuation sur le réseau nationale et mise en place des contrats de raccordement - Le financement du projet avec les institutions locales et internationales. - La construction et la mise en marche du projet
Possibilités d intégrations ti locales l - Construction des tours - La fourniture de transformateurs pour les turbines. - La construction (génie civile et génie électrique. - Le montage/ levage et le transport
Cadre légal - Loi de février 2009. - Contraintes de la loi pour les industriels. - Investissement a risque dans un secteur qu ils ne maitrisent pas -Exemple de partenariat : Cas du projet avec la S.C. G (Société des ciments de Gabes) -Intérêt pour l industriel : cout de l énergie compétitif et visibilité sur le long terme - Intérêt pour l état : éviter la subvention ( 52Mm/ KWh)
Merci de votre attention Merci de votre attention Thank you for your Attention