HUBERT COLLECTIO Vanity Set Ensemble meuble-lavabo 9-VF60GWH-67 Porcelain top 6mm 46mm 20mm 94mm 46mm 820mm Tools You Will Need - Outils Requis Power drill Perceuse électrique Screwdriver Tournevis Pencil Crayon Glue Glue Colle Rev. February 2, 208
Replacement parts / Pièces de remplacement 3 4 2a 6b 6a Size / Dimension: NUM DIMESION / SIZE: W x D x H (mm) QTÉ / QTY NUM DIMESION / SIZE: W x D x H (mm) QTÉ / QTY 7-3/6" x /8"T x 22" -/8" x /6"T x 22-/4" 6b 437 x 6T x 6 29 x 8T x 80 20-/2" x /8T" x 32-/4 " 4-/8" x /8"T x 23-3/8" 2a 437 x 6T x 820 7 7 x 6T x 94 20-/2" x /8T" x 32-/4 " 437 x 6T x 820 -/2" x /8" x 22" 3 40 x 6T x 6 4-3/4" x /6" x 23-/6" 4 20 x 8T x 93 -/8" x /8" x 22" 30 x 6T x 6 -/8" x /6"T x 22-/4" 6a 29 x 8T x 80 Part List / Liste de pièces: 4 X B 0 X C 4 X E 2 X H 60mm 4 X F 4 X O 30mm Master Part : B. Metal cam / Vis pour cam-lock C. Cap for cam-lock / Capuchon pour cam-lock D.. Screw for facial board / Vis pour planche de rive 2 X D E. Hinge part on side panels / Charnière côté panneau F. Hinge part on doors / Charnière côté porte G. Screw for Hinge part on doors / Vis pour Charnière côté porte F. Hinge part on doors / Charnière côté porte H. Handle for doors / Poignée pour portes 8 X G O. Bumper / Pare-chocs 23mm P. Screw / Vis R. Screw for back panel / Vis pour panneau arrière R.Plastic plug / Bouchon en plastique S. L-shape metal plate to fix boards together 4 X P H / L-forme plaque de métal à fixer planches ensemble T. Screw for L-shape metal plate / Vis pour plaque de métal en forme de L 7 2 X R 2 X R 2 X S 6 X T P2 of 8
Vanity installation procedures / Procédures d'installation de meuble-lavabo Step / Étape 2a 7 x B White color side *Côté blanc de la couleur Step 2 / Étape 2 White color side *Côté blanc de la couleur 7 x B P3 of 8
Vanity installation procedures / Procédures d'installation de meuble-lavabo Step 3 / Étape 3 Step 4 / Étape 4 4 x T 7 2 x C 3 X2 3 x C 2 x S X2 X3 Step / Étape Step 6 / Étape 6 2 x T X2 7 3 2a 2 x C X3 3 x C P4 of 8
Vanity installation procedures / Procédures d'installation de meuble-lavabo Step 7 / Étape 7 Step 8 / Étape 8 2 x D 4 6a (2*2) x F 6b (2*4) x G Step 9 / Étape 9 (2*2) x E P of 8
Vanity installation procedures / Procédures d'installation de meuble-lavabo Step 0 / Étape 0 Door orientation adjustment *Réglage d'orientation de porte x4 4 x O 6a 6b 4 x P 2 x H P6 of 8
Installation procedures / Procédures d'installation Step / Étape The vanity wall mounting screws need to be fixed onto the studs behind the dry wall board. Locate and mark the stud positions with a stud finder, drill pilot mounting holes at marks onto desire studs. Insert the plastic screw sleeves into drilled mounting holes on wall. Drill the screw holes on vanity back panel to match the mounting holes on wall. Install the mounting screws through the vanity back panel, dry wall board to the studs. *Les vis de fixation murale vanité doivent être fixés sur les montants derrière le panneau mural sec. Repérez et marquez les positions des goujons avec un détecteur de montants, percer des trous de montage pilotes à des marques sur les goujons de désir. Insérez les douilles à vis en plastique dans les trous de montage percés sur le mur. Percez les trous de vis sur la vanité panneau arrière pour faire correspondre les trous de fixation sur le mur. Installez les vis de montage à travers le panneau arrière de la vanité, panneau de cloison sèche sur les poteaux. studs *goujons studs *goujons 2 x R 2 x R Dry wall *Cloison sèche Tools You Will Need - Outils Requis stud finder finder stud P7 of 8
Installation procedures / Procédures d'installation Step 2 / Étape 2 silicone Step 3 / Étape 3 P8 of 8