Spectra Series Power Panelboards. Application. Installation. Bolt-On Circuit Breaker Kits. DEH055 Installation Instructions

Documents pareils
Lavatory Faucet. Instruction Manual. Questions?

Warning: Failure to follow these warnings could result in property damage, or personal injury.

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE ombre pendant lamp lampe suspendue à tons dégradés, chocolat

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE luster chandelier lamp chandelier à trois branches en verre lustré

R.V. Table Mounting Instructions

GIGABIT PCI DESKTOP ADAPTER DGE-530T. Quick Installation Guide+ Guide d installation+

WINTER BOAT STORAGE SYSTEM SYSTÈME DE REMISAGE HIVERNAL POUR BATEAU

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

MONTEGO 3 PERSON CUSHION GARDEN SWING WITH CANOPY ASSEMBLY INSTRUCTIONS ITEM# SC-177-2GS

Folio Case User s Guide

Contrôle d'accès Access control. Notice technique / Technical Manual

Instructions Mozilla Thunderbird Page 1

Notice Technique / Technical Manual

Fabricant. 2 terminals

Z-Axis Compliance Device Compliance en z

Sécurité relative aux sièges auto et aux rehausseurs

03/2013. Mod: WOKI-60IP/TR. Production code: DTWIC 6000

Paxton. ins Net2 desktop reader USB

Instructions pour mettre à jour un HFFv2 v1.x.yy v2.0.00

Le No.1 de l économie d énergie pour patinoires.

This is a preview - click here to buy the full publication NORME INTERNATIONALE INTERNATIONAL STAN DARD. Telecontrol equipment and systems

ENGLISH 4 FRANÇAIS 6 ESPAÑOL 8

Embases pour raccordement G1/8 - G1/4

Trim Kit Installation Instruction

DOCUMENTATION - FRANCAIS... 2

Monitor LRD. Table des matières

DOCUMENTATION - FRANCAIS... 2

User guide Conference phone Konftel 100

Editing and managing Systems engineering processes at Snecma

Support Orders and Support Provisions (Banks and Authorized Foreign Banks) Regulations

English Q&A #1 Braille Services Requirement PPTC Q1. Would you like our proposal to be shipped or do you prefer an electronic submission?

Credit Note and Debit Note Information (GST/ HST) Regulations

Guide d'installation rapide TFM-560X YO.13

NORME INTERNATIONALE INTERNATIONAL STANDARD. Dispositifs à semiconducteurs Dispositifs discrets. Semiconductor devices Discrete devices

BLUELINEA ,00 EUR composé de actions de valeur nominale 0,20 EUR Date de création : 17/01/2006

33 inch open & closed storage Rangement à espace fermé et ouvert de 33po (83.7cm) 33 pulgadas almacenaje abierto y cerra

Material Banking Group Percentage Regulations. Règlement fixant le pourcentage (groupe bancaire important) CONSOLIDATION CODIFICATION

Interest Rate for Customs Purposes Regulations. Règlement sur le taux d intérêt aux fins des douanes CONSOLIDATION CODIFICATION

POLICY: FREE MILK PROGRAM CODE: CS-4

PARIS ROISSY CHARLES DE GAULLE

LE FORMAT DES RAPPORTS DU PERSONNEL DES COMMISSIONS DE DISTRICT D AMENAGEMENT FORMAT OF DISTRICT PLANNING COMMISSION STAFF REPORTS

First Nations Assessment Inspection Regulations. Règlement sur l inspection aux fins d évaluation foncière des premières nations CONSOLIDATION

Contents Windows

Using a Walker. 2. Move your injured or weak leg toward the walker first. If you have had surgery on both legs, use either leg to begin walking.

Stainless Steel Solar Wall Light

NORMES D INSTALLATION PARTITION W/SCA Avec rideau gonflable

Garage Door Monitor Model 829LM

Ships Elevator Regulations. Règlement sur les ascenseurs de navires CODIFICATION CONSOLIDATION. C.R.C., c C.R.C., ch. 1482

Umkehrfräse Typ UF 70/80/80-T/90/100 Reversing Harrow UF 70/80/80-T/90/100

Propriétés de la matière. Material properties. Sonde de pression Pressure probe. Ref : Français p 1. English p 3.

Cheque Holding Policy Disclosure (Banks) Regulations. Règlement sur la communication de la politique de retenue de chèques (banques) CONSOLIDATION

86 rue Julie, Ormstown, Quebec J0S 1K0

LOOPED THREAD OSTEOSUTURE: SMARTLOOP

Short-term Pooled Investment Fund Regulations. Règlement sur le fonds commun de placement à court terme CONSOLIDATION CODIFICATION

CONVENTION DE STAGE TYPE STANDART TRAINING CONTRACT

Now enhanced with powerful workplace solutions Maintenant amélioré, diet+ vous offre de puissantes solutions novatrices pour le milieu de travail

PRINCIPE DE HOTTE SPÉCIALE COMPLÈTE TYPE «RHC» COMPLETE «RHC» TYPE SPECIAL HOOD SYSTEM

Package Contents. System Requirements. Before You Begin

APPENDIX 6 BONUS RING FORMAT

Railway Operating Certificate Regulations. Règlement sur les certificats d exploitation de chemin de fer CODIFICATION CONSOLIDATION

Règlement sur le télémarketing et les centres d'appel. Call Centres Telemarketing Sales Regulation

SA-32 / SA-62 INSTRUCTION MANUAL - MANUEL D INSTRUCTIONS

DOCUMENTATION MODULE BLOCKCATEGORIESCUSTOM Module crée par Prestacrea - Version : 2.0

Spécial Catégorie 6 Patch Cords

Institut français des sciences et technologies des transports, de l aménagement

Start Here Point de départ

Once the installation is complete, you can delete the temporary Zip files..

Improving the breakdown of the Central Credit Register data by category of enterprises

Quick Installation Guide TEW-AO12O

JSIam Introduction talk. Philippe Gradt. Grenoble, March 6th 2015

INVESTMENT REGULATIONS R In force October 1, RÈGLEMENT SUR LES INVESTISSEMENTS R En vigueur le 1 er octobre 2001

22/09/2014 sur la base de 55,03 euros par action

FÉDÉRATION INTERNATIONALE DE NATATION Diving

Le passé composé. C'est le passé! Tout ça c'est du passé! That's the past! All that's in the past!

LOI SUR LA RECONNAISSANCE DE L'ADOPTION SELON LES COUTUMES AUTOCHTONES ABORIGINAL CUSTOM ADOPTION RECOGNITION ACT

Resident Canadian (Insurance Companies) Regulations. Règlement sur les résidents canadiens (sociétés d assurances) CONSOLIDATION CODIFICATION

Name Use (Affiliates of Banks or Bank Holding Companies) Regulations

SERVEUR DÉDIÉ DOCUMENTATION

Règlement relatif à l examen fait conformément à la Déclaration canadienne des droits. Canadian Bill of Rights Examination Regulations CODIFICATION

The new consumables catalogue from Medisoft is now updated. Please discover this full overview of all our consumables available to you.

IPSAS 32 «Service concession arrangements» (SCA) Marie-Pierre Cordier Baudouin Griton, IPSAS Board

Archived Content. Contenu archivé

Compléter le formulaire «Demande de participation» et l envoyer aux bureaux de SGC* à l adresse suivante :

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Advanced Level

Cambridge International Examinations Cambridge International Advanced Subsidiary Level

12, Chemin de la Forge L Islet (Québec) G0R 1X0 CANADA

Borrowing (Property and Casualty Companies and Marine Companies) Regulations

Loi sur l aide financière à la Banque Commerciale du Canada. Canadian Commercial Bank Financial Assistance Act CODIFICATION CONSOLIDATION

Appointment or Deployment of Alternates Regulations. Règlement sur la nomination ou la mutation de remplaçants CONSOLIDATION CODIFICATION

FOURTH SESSION : "MRP & CRP"

Cedric Dumoulin (C) The Java EE 7 Tutorial

SYSTÈME JETS D AIR WISH WISH AIR JETS SYSTEM Système de massage à jets d air pour bains en polymère - Air jet massage system for polymer bathtubs

ETABLISSEMENT D ENSEIGNEMENT OU ORGANISME DE FORMATION / UNIVERSITY OR COLLEGE:

Restaurant Application Quick Reference Guide

Exercices sur SQL server 2000

Free filter reminders! Sign up online at: santevia.com/filterease. need help? Contact Santevia!

Le Tour de Bretagne à la Voile est une épreuve de catégorie 3 des RSO. En cas de traduction de cet avis de course, le texte français prévaudra

72" STORAGE SHELF OR WORKBENCH ÉTAGERÈ DE RANGEMENT OU ETABLI DE 72 PO

Gestion des prestations Volontaire

Transcription:

g DEH055 Installation Instructions Spectra Series Power Panelboards Bolt-On Circuit Breaker Kits R01 Application These instructions apply to bolt-on circuit breaker kits with catalog numbers AMCB6EY and AMCB4EY. For use with circuit breaker type TEY. For use with circuit breaker cover kit AFP3EYD. Installation WARNING: Danger of electrical shock or injury. Turn OFF power ahead of the panelboard or switchboard before working inside the equipment or removing any component. Equipment is to be installed and maintained by properly trained and qualified personnel only. In the following instructions, numbers in brackets in the text and figures refer to the items in Table 1. 1. Confirm the contents of the kit. These kits are used to install TEY circuit breakers into Spectra APNB bolt-on style interiors. The parts included in these kits are listed in Table 1. Qty. in Qty. in Item Description AMCB4EY AMCB6EY 1 A pole strap assembly 1 1 2 Carriage bolt, 1 /4-20 x 1 1 /2" Carriage bolt, 1 /4-20 x 1" * 2 3 3 Conical spring washer, 1 /4" 2 3 4 Nut, 1 /4-20 2 3 5 B pole strap assembly 1 1 6 C pole strap assembly 1 1 7 Lower mounting bracket 2 2 8 Thread-forming screw 4 4 9 Upper mounting bracket 2 2 10 Screw with lockwasher, 4 4 #8-32 x 1 /4" 11 B-phase isolator 1 1 12 Antiturn clips 2 3 * For use with a vertical bus rated at 600 A or less. Table 1. Parts included in kits AMCB4EY and AMCB6EY. 2. Locate the side of the interior with a 2.75-inch reference distance. The circuit breaker straps are mounted on the side of the panel interior bus at which the distance from the nearest vertical bus face to the inner face of the bus-support rail is 2.75 inches, as indicated in Figure 2. 3. Install the circuit breaker straps. For three-phase applications (kit AMCB6EY), install the straps beginning with the pole farthest from the 2.75-inch dimension, as shown in Figures 1 and 2. Slide an antiturn clip [12] over the square shank of a carriage bolt [2], then insert the bolt assembly into the A phase bus, with the head opposite the 2.75-inch dimension. Position the square hole of the A pole strap [1] onto the bolt, with the pin of the antiturn bracket inserted into the small hole in the strap. Secure with a conical spring washer [3] and nut [4], leaving the connection finger tight. Repeat the process for the B pole strap [5] and C pole strap [6]. For single-phase panels, dc applications, and phasebalancing purposes (kit AMCB4EY), Table 2 lists the possible configurations. Align the appropriate strap assemblies [1, 5, 6] with the corresponding holes in the vertical bus, as shown in Figures 1 and 2. Fasten each strap assembly loosely to the vertical bus with a carriage bolt [2], conical washer [3], and nut [4], as described for the three-phase kit. When installing any of the two-pole strap configurations in Table 2, be sure to install the straps in standard phase-rotation order. When installing a twopole and a three-pole breaker in a double-branch assembly, arrange the straps in the typical three-pole configuration, as shown in Figure 2. Application A Phase B Phase C Phase Single pole Two pole * * * Use for single-phase panels and dc applications. Table 2. Possible pole configurations with kit AMCB4EY. 4. Install the lower circuit breaker mounting brackets and cover supports. Attach the lower breaker mounting brackets [7] to the panel side rails with the thread-forming screws [8], as shown in Figure 1. Tighten the screws to 35 in-lb. Slide the cover supports (included in the breaker cover kit), with the mounting tabs oriented inward, onto each bracket until they snap into place, as shown in Figure 1. Use the uppermost slot on the cover support body. Cover supports can be easily removed by inserting a screwdriver blade into the slot on the underside of the mounting bracket assembly and gently prying downward while pushing the support off.

Cover Support Figure 1. Mounting TEY circuit breakers into Spectra APNB bolt-on interiors. Strap Mounting Side on Main Busbar Cover Support Figure 2. Mounting TEY circuit breakers into Spectra APNB bolt-on interiors, assembly end view.

5. Install the isolator and upper mounting brackets. Align the free ends of the B-phase isolator [11] with the corresponding #8 threaded holes on the top face of the lower mounting brackets, as shown in Figure 3. Place the upper mounting brackets [9] on top of the isolator ends and align them with the holes, as shown in Figure 1. Secure the resulting assembly with the #8-32 screws with lockwashers [10], leaving the screws fingertight. Slide the brackets to their outermost positions. 6. Install the circuit breakers. Position the breakers so that the line- or ON-side terminals rest on the straps. Fold the isolator flaps upward and insert them into the opposing grooves in the breaker housing between the phases, as shown in Figure 4. Secure the captive screws in the breaker terminals to the corresponding threaded holes in the straps and tighten to 35 in-lb. (The straps may require minor adjustments to obtain proper hole alignment.) For each breaker, slide the upper breaker mounting bracket until the steel flange on the underside of the breaker housing is fully engaged with the toothed section of the bracket, then tighten the bracket mounting screws to 18 inlb. 7. Tighten the bolted connections. Tighten the strap connections at the vertical bus to 65 in-lb. It may be necessary to remove adjacent circuit breaker modules to obtain access to the bolted connections at the vertical bus. Figure 3. Installing the B-phase isolator. Figure 4. Installing the breaker with the B-phase isolator.

These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency that may be met in connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise that are not covered sufficiently for the purchaser s purposes, the matter should be referred to the GE Company. g GE Industrial Systems General Electric Company 41 Woodford Ave., Plainville, CT 06062 DEH055 R01 0714 2001 General Electric Company

g DEH062 Instructions d Installation Panneaux de distribution Spectra Series R02 Kits de disjoncteurs à boulonnage Application Ces instructions s appliquent aux kits de disjoncteurs à boulonnage ayant les numéros de catalogues AMCB6EY et AMCB4EY. Pour utilisation avec les disjoncteurs de type TEY. Pour utilisation avec le couvercle de disjoncteur AFP3EYD. Installation AVERTISSEMENT: Danger de choc électrique ou de blessure. Mettre le courant en amont du panneau de distribution ou du tableau de contrôle à OFF avant de travailler à l intérieur de cet équipement ou d en retirer toute composante. L équipement ne doit être installé et entretenu que par du personnel correctement entraîné et qualifié. Les numéros entre parenthèses dans le texte et les figures qui suivent font référence aux items de la Table 1. 1. Inventorier le contenu du kit. Ces kits sont utilisés pour installer des disjoncteurs de type TEY dans des intérieurs à boulonnage Spectra APNB. Les pièces incluses dans ces kits sont listées à la Table 1. Qté. dans Qté. dans Item Description AMCB4EY AMCB6EY 1 Assemblage de barrette pôle A 1 1 Boulon de carrosserie, 2 1/4-20 x 1 1 /2" Boulon de carrosserie, 1/4-20 x 1" * 2 3 3 Rondelle à ressort conique, 1 /4" 2 3 4 Écrou, 1 /4-20 2 3 5 Assemblage de barrette pôle B 1 1 6 Assemblage de barrette pôle C 1 1 7 Soutien de montage inférieur 2 2 8 Vis autotaraudeuse 4 4 9 Soutien de montage supérieur 2 2 10 Vis avec rondelle de retenue, #8-32 x 1 /4" 4 4 11 Isolateur phase B 1 1 12 Pièces antirotation 2 3 * Pour utilisation avec des barres omnibus verticales à valeur nominale de 600 A. ou moins. Table 1. Pièces incluses dans les kits AMCB5EY et AMCB6EY. 2. Repérer le côté de l intérieur ayant la distance de référence de 2.75 pouces. Les barrettes de disjoncteur sont montées sur le côté de la barre omnibus intérieure du panneau pour lequel la distance de la face de la barre omnibus verticale la plus rapprochée de la face intérieure du rail de support de barre omnibus est de 2.75 pouces, comme indiqué à la Figure 2. 3. Installer les barrettes de disjoncteurs. Pour les applications à trois phases (kit AMCB6EY), installer les barrettes en débutant par le pôle le plus éloigné de la dimension de 2.75 pouces comme montré aux Figures 1 et 2. Glisser une pièce antirotation[12] par-dessus la tige carrée du boulin de carrosserie [2], puis insérer l assemblage du boulon dans la barre omnibus de la phase A, avec la tête de celui-ci à l opposée de la dimension de 2.75 pouces. Mettre en position le trou carré de la barrette de pôle A [1] sur le boulon, avec la tige du soutien antirotation insérée dans le petit trou dans la barrette. Fixer avec une rondelle à ressort conique [3] et un écrou [4], laissant la connexion serrée lâchement. Répéter le processus pour le pôle B de la barrette [5] et la barrette de pôle C [6]. S il s agit de panneaux à phase simple, d applications cc et de fins d équilibrage des phases (kit AMCB4EY), la Table 2 liste les possibilités de configurations. Aligner les assemblages appropriés de barrettes [1, 5, 6] avec les trous correspondants dans la barre omnibus verticale, tel que montré aux Figures 1 et 2. Fixer lâchement avec un boulon de carrosserie [2], une rondelle conique [3] et un écrou [4] chaque assemblage de barrette à la barre omnibus verticale, tel que décrit pour le kit à trois phases. Lors de l installation de n importe laquelle des configurations de barrettes deux pôles de la Table 2, assurez-vous d installer les barrettes dans un ordre standard de rotation des phases. Lors de l installation d un disjoncteur deux pôles et d un disjoncteur trois pôles dans un assemblage double dérivation, arranger les barrettes dans la configuration typique trois pôles, tel que montré à la Figure 2. Application Phase A Phase B Phase C Pôle simple Deux pôles * * * Utiliser pour des panneaux phase simple et application cc. Table 2. Configurations possibles de pôles avec le kit AMCB4EY.

Support du couvercle Figure 1. Montage de disjoncteurs TEY dans des intérieurs à boulonnage Spectra APNB. Côté de montage de la barrette sur la barre omnibus Support du couvercle Figure 2. Vue du bout de l assemblage d un montage de disjoncteurs TEY dans des intérieurs Spectra APNB.

4. Installer les soutiens de montage de disjoncteur les plus bas et les supports de couvercle. Fixer les soutiens de montage de disjoncteur les plus bas [7] aux rails latéraux de panneau avec les vis autotaraudeuses [8], tel qu illustré à la Figure1. Serrer les vis à 35 lb.-po. Glisser les supports de couvercle(inclus dans le kit de couvercle de disjoncteur)sur chaque soutien, avec les onglets de montage orientés vers l intérieur, jusqu à ce qu ils cliquent en place, tel que montré à la Figure 1. Utiliser l ouverture la plus élevée sur châssis de support de couvercle. Les supports de couvercles peuvent être retirés facilement en insérant une lame de tournevis dans l ouverture sous l assemblage de soutien de montage et en soulevant doucement vers le bas tout en retirant le couvercle. 5. Installer l isolateur et les soutiens de montage supérieurs. Aligner les extrémités libres de l isolateur de phase B [11] avec les trous filetés #8 correspondants sur la face supérieure des soutiens de montage inférieurs, tel que montré à la Figure 3. Placer les soutiens de montage supérieurs [9] sur le haut des extrémités de l isolateur et les aligner avec les trous, tel que montré à la Figure 1. Fixer l assemblage qui en résulte avec les vis #8-32 avec rondelles de retenue [10], laissant les vis serrées lâchement. Glisser les soutiens à leurs positions les plus éloignées. 6. Installer les disjoncteurs. Mettre les disjoncteurs en position de manière à ce que les bornes du côté ON reposent sur les barrettes. Plier les rabats de l isolateur vers le haut et les insérer dans les rainures opposées dans l habitacle du disjoncteur entre les phases, tel que montré à la Figure 4. Fixer les vis captives dans les bornes de disjoncteur aux trous filetés correspondants dans les barrettes et serrer à 35 lb-po. (Il se peut que les barrettes aient besoin d ajustements mineurs pour obtenir un alignement correct dans les trous.) À chaque disjoncteur, glisser le soutien de montage de disjoncteur le plus élevé jusqu à ce que le rebord d acier sous l habitacle du disjoncteur soit entièrement mis en prise avec la section dentelée du soutien, serrer alors les vis de soutien de montage à 18 lb.-po. 7. Serrer les connexions boulonnées. Serrer les connexions de barrette à la barre omnibus verticale à 65 lb.-po. Il se peut que l on doive retirer les modules de disjoncteurs adjacents pour obtenir l accès aux connexions boulonnées à la barre omnibus verticale. Figure 4. Installation du disjoncteur avec l isolateur de phase B. Figure 3. Installation de l isolateur de phase B.

Ces instructions n ont pas pour propos de couvrir tous les détails ou variations de l équipement ni de fournir des solutions pour tous les imprévus reliés avec les opérations causées par l installation ou l entretien. Si des informations supplémentaires étaient requises ou s il survenait un problème particulier lesquels ne sont pas suffisamment couverts selon l acheteur, ceci devrait être référé à GE Company. g GE Industrial Systems General Electric Company 41 Woodford Ave., Plainville, CT 06062 DEH055 R01 0714 2001 General Electric Company