658DVK2 Direct Vent Horizontal Termination & Wall Thimble & 658NSFK New Siding Flashing Kit For use with Valor brand direct vent (DV) heaters ONLY

Documents pareils
Folio Case User s Guide

Lavatory Faucet. Instruction Manual. Questions?

Le No.1 de l économie d énergie pour patinoires.

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE ombre pendant lamp lampe suspendue à tons dégradés, chocolat

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE luster chandelier lamp chandelier à trois branches en verre lustré

WINTER BOAT STORAGE SYSTEM SYSTÈME DE REMISAGE HIVERNAL POUR BATEAU

Fabricant. 2 terminals

Monitor LRD. Table des matières

Archived Content. Contenu archivé

GASKET FOR TONER COLLECTION BOTTLE

Instructions Mozilla Thunderbird Page 1

Embases pour raccordement G1/8 - G1/4

Paxton. ins Net2 desktop reader USB

IPSAS 32 «Service concession arrangements» (SCA) Marie-Pierre Cordier Baudouin Griton, IPSAS Board

Editing and managing Systems engineering processes at Snecma

Exercices sur SQL server 2000

Instructions pour mettre à jour un HFFv2 v1.x.yy v2.0.00

Notice Technique / Technical Manual

BILL 203 PROJET DE LOI 203

Gestion des prestations Volontaire

If the corporation is or intends to become a registered charity as defined in the Income Tax Act, a copy of these documents must be sent to:

English Q&A #1 Braille Services Requirement PPTC Q1. Would you like our proposal to be shipped or do you prefer an electronic submission?

AMENDMENT TO BILL 32 AMENDEMENT AU PROJET DE LOI 32

CLASSIFICATION REPORT OF REACTION TO FIRE PERFORMANCE IN ACCORDANCE WITH EN : 2007

CLASSIFICATION REPORT OF REACTION TO FIRE PERFORMANCE IN ACCORDANCE WITH EN : 2007

PRINCIPE DE HOTTE SPÉCIALE COMPLÈTE TYPE «RHC» COMPLETE «RHC» TYPE SPECIAL HOOD SYSTEM

GIGABIT PCI DESKTOP ADAPTER DGE-530T. Quick Installation Guide+ Guide d installation+

Propriétés de la matière. Material properties. Sonde de pression Pressure probe. Ref : Français p 1. English p 3.

03/2013. Mod: WOKI-60IP/TR. Production code: DTWIC 6000

Maximum Capacity / Capacité maximal: 10 kg/min

Frequently Asked Questions

Practice Direction. Class Proceedings

How to Login to Career Page

INVESTMENT REGULATIONS R In force October 1, RÈGLEMENT SUR LES INVESTISSEMENTS R En vigueur le 1 er octobre 2001

TABLE DES MATIERES A OBJET PROCEDURE DE CONNEXION

Polyisocyanurate Insulation Sheathing

AVIS DE COURSE. Nom de la compétition : CHALLENGE FINN OUEST TOUR 3 Dates complètes : 14, 15 et 16 mai 2015 Lieu : Saint Pierre Quiberon

Utiliser une WebCam. Micro-ordinateurs, informations, idées, trucs et astuces

Package Contents. System Requirements. Before You Begin

SYSTÈME DE GAINES À SPIRALE ET RACCORDS TOURNANTS

AUDIT COMMITTEE: TERMS OF REFERENCE

Cheque Holding Policy Disclosure (Banks) Regulations. Règlement sur la communication de la politique de retenue de chèques (banques) CONSOLIDATION

Z-Axis Compliance Device Compliance en z

Laboratory accredited by the French Home Office (official gazette date February 5 th, 1959, modified) Valid five years from August 27 th, 2013

Application Form/ Formulaire de demande

The UNITECH Advantage. Copyright UNITECH International Society All rights reserved. Page 1

Guide d'installation rapide TFM-560X YO.13

WEB page builder and server for SCADA applications usable from a WEB navigator

NEW Fin Fan / Air cooled condenser cleaning

Mesure chimique. Chemical measurement. Sonde de température Pt 1000 Inox Pt 1000 stainless steel. Ref : Français p 1.

Quick start guide. HTL1170B

LE FORMAT DES RAPPORTS DU PERSONNEL DES COMMISSIONS DE DISTRICT D AMENAGEMENT FORMAT OF DISTRICT PLANNING COMMISSION STAFF REPORTS

ADHEFILM : tronçonnage. ADHEFILM : cutting off. ADHECAL : fabrication. ADHECAL : manufacturing.

Scénarios économiques en assurance

À noter, s il vous plaît : Ne pas utiliser de l alcool à friction. Il contient un hydratant et n est pas convenable pour nettoyer des cloisons.

Guide d installation Deco Drain inc. DD200

Quatre axes au service de la performance et des mutations Four lines serve the performance and changes

Présentation par François Keller Fondateur et président de l Institut suisse de brainworking et M. Enga Luye, CEO Belair Biotech

THE OUAGADOUGOU RECOMMENDATIONS INTERNET INFRASTRUCTURE FOR AN AFRICAN DIGITAL ECONOMY 5-7 MARCH 2012

Contents Windows

ERA-Net Call Smart Cities. CREM, Martigny, 4 décembre 2014 Andreas Eckmanns, Responsable de la recherche, Office Fédéral de l énergie OFEN

Cedric Dumoulin (C) The Java EE 7 Tutorial

HUAWEI TECHNOLOGIES CO., LTD. channelroad. A better way. Together.

en SCÈNE RATIONAL Rational Démonstration SDP : automatisation de la chaîne de développement Samira BATAOUCHE sbataouche@fr.ibm.com

Forthcoming Database

RULE 5 - SERVICE OF DOCUMENTS RÈGLE 5 SIGNIFICATION DE DOCUMENTS. Rule 5 / Règle 5

Association les DAUPHINS. Club des Dauphins. Régate des Bancs de Flandre Dunkerque 19 & 20 septembre Avis de course

iqtool - Outil e-learning innovateur pour enseigner la Gestion de Qualité au niveau BAC+2

Projet de réorganisation des activités de T-Systems France

Contrôle d'accès Access control. Notice technique / Technical Manual

Water Quality Information Management for Atlantic, Ontario, Manitoba, Pacific and Saskatchewan Regions

Pièces métalliques pour équipement des coffrets. Metal components for High-End Trunks / Cases / Boxes

POLICY: FREE MILK PROGRAM CODE: CS-4

RAPID Prenez le contrôle sur vos données

Stéphane Lefebvre. CAE s Chief Financial Officer. CAE announces Government of Canada participation in Project Innovate.

Once the installation is complete, you can delete the temporary Zip files..

R.V. Table Mounting Instructions

Improving the breakdown of the Central Credit Register data by category of enterprises

86 rue Julie, Ormstown, Quebec J0S 1K0

Préparation / Industrialisation. Manufacturing Engineering/ On-site Industrialisation. Qualité, contrôle et inspection. On-site quality and Inspection

FÉDÉRATION INTERNATIONALE DE NATATION Diving

Rapport d'évaluation CCMC R IGLOO Wall Insulation

Plan Vert de l industrie touristique montréalaise 21 février 2014

Panorama des bonnes pratiques de reporting «corruption»

Installation d'un TSE (Terminal Serveur Edition)

CLIM/GTP/27/8 ANNEX III/ANNEXE III. Category 1 New indications/ 1 re catégorie Nouvelles indications

APPENDIX 6 BONUS RING FORMAT

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

Université de XY University of XY. Faculté XY Faculty of XY

Le Tour de Bretagne à la Voile est une épreuve de catégorie 3 des RSO. En cas de traduction de cet avis de course, le texte français prévaudra

Copyright 2014, Oracle and/or its affiliates. All rights reserved.

Copyright 2013, Oracle and/or its affiliates. All rights reserved.

SERRURES EXTRA-PLATES

The new consumables catalogue from Medisoft is now updated. Please discover this full overview of all our consumables available to you.

Critères à l attention des fabricants et des fournisseurs de biens ou de services : dispositifs mécaniques pour bingo

Stratégie DataCenters Société Générale Enjeux, objectifs et rôle d un partenaire comme Data4

22/09/2014 sur la base de 55,03 euros par action

that the child(ren) was/were in need of protection under Part III of the Child and Family Services Act, and the court made an order on

Discours du Ministre Tassarajen Pillay Chedumbrum. Ministre des Technologies de l'information et de la Communication (TIC) Worshop on Dot.

Transcription:

658DVK2 Direct Vent Horizontal Termination & Wall Thimble & 658NSFK New Siding Flashing Kit For use with Valor brand direct vent (DV) heaters ONLY Installation Instructions Note: This kit must be installed by a qualifi ed installer, service agency or gas supplier. These instructions are to be used in conjunction with the fi replace main installation instructions. Horizontal Termination 658DVK2 5-1/2 (140 mm) 6-1/2 (165 mm) 12 (305 mm) 2-piece Wall Thimble 6-5/8 (168 mm) 12 outer pipe size (305 mm) Important Installer Notice Weather Sealing & Vapor Barriers It is the installer s responsibility to ensure that vent installations through exterior walls are caulked, fl ashed and weatherproofed in such a manner as to: Prevent rain water from entering the wall from the weather side by adequately caulking the outer vent plate to the exterior wall surface. Prevent moisture inside the home from penetrating into the wall structure by ensuring the inside wall plate is adequately sealed to the inside vapor barrier. Prevent rain water and moisture from entering the walls by sealing the joints between vent tube and the inner and outer wall plates. We recommend the use of a high quality polyurethane sealant. For use where listed with Valor brand fireplaces only. Refer to Approved Venting Components list in appliance installation manual. For use as horizontal termination only. Do not use as vertical termination. May be used with any brand co-axial pipe listed in appliance installation manual. The 658 terminal provides approximately 5-1/2 of slip length; ensure a minimum of 1-1/2 overlap and use 3 screws to secure to pipe. The 658 terminal is intended to slip over a regular section of pipe and may not fi t over adjustable or extension pipe sections that tend to be slightly oversize. Use Mill-Pac sealant on 4 exhaust connection to 658 terminal. Refer to installation manual packaged with appliance for acceptable locations with respect to building openings and projections. A Valor Terminal Guard is required for safety when the 658DVK2 is within 7-0 of grade or accessible to persons. Typical installation VALOR 658TG TERMINAL GUARD (sold separately) VALOR 658DVK2 HORIZONTAL TERMINATION 2-PIECE WALL THIMBLE FLASHING PIPE LENGTH (sold separately) DRIP FLASHING VALOR 658NSFK NEW SIDING FLASHING KIT (sold separately) for applications where new siding is being applied All horizontal pipe runs must be graded 1/4 inch per foot upwards in the direction of the exhaust fl ow. The fi nal pipe length may be graded downwards slightly to prevent water migration. 4005123-03 Copyright Miles Industries Ltd., 2016.

Wall Thickness The appliance vent and wall thimble are suitable for penetrating a combustible wall assembly up to 8 inches in thickness. A non-combustible wall can be of any thickness up to the maximum horizontal run of vent pipe allowed for the particular installation. Framing Vent in Combustible Walls When penetrating through combustible walls, frame a minimum of 10 in x 10 in opening and ensure that the insulation is kept clear of the vent pipe using the 2-piece wall thimble supplied with this kit. Non-combustible walls do not require a thimble. Existing Siding Applications (for new siding applications, use 658NSFK New Siding Flashing Kit) 10 (254 mm) Inner Thimble Outer Thimble Horizontal Termination 10 (254 mm) 658TG Terminal Guard as required (sold separately) 1 (25 mm) deep flange Siding should NOT project forward of the termination plate. DO NOT RECESS the terminal into the wall finish. 2

New Siding Applications - Use 658NSFK New Siding Flashing Kit (sold separately) where new siding is applied 2 (51 mm) Drip flashing 11-7/8 (302 mm) up Flashing o 658NSFK 11-7/8 (302 mm) Note orientation of overlap to shed water Seal these corners (4) from backside of flashing using high quality sealant to avoid leakage de nt kage 10 x 10 framed hole with wall thimbles Exterior plywood sheathing 658NSFK Flashing and drip flashing (sold separately) Installs onto sheathing 658DVK2 terminal overlaps up to 1 of flashing depth Air/Moisture barrier installed over flanges on flashing 3

Air/Moisture barrier 658TG Terminal Guard where required (sold separately) Siding. Finish up to edge of flashing/ terminal Rainscreen cavity furring strips where required Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication. Designed and Manufactured by / for Miles Industries Ltd. 190 2255 Dollarton Highway, North Vancouver, B.C., CANADA V7H 3B1 Tel. 604-984-3496 Fax 604-984-0246 www.valorfireplaces.com 4

LE PREMIER MC FOYER À GAZ RADIANT Sortie d évacuation horizontale et Manchon d emboîtement 658DVK2 et Solin pour nouveau parement 658NSFK Pour usage avec les foyers Valor à évent direct (DV) SEULEMENT Directives d installation Note : Cette devanture doit être installée par un installateur qualifiée, une agence de service certifiée ou un fournisseur de gaz. Ces instructions doivent être utilisées conjointement avec les instructions fournies avec le foyer. Sortie horizontale 658DVK2 5-1/2 (140 mm) 6-1/2 (165 mm) 12 (305 mm) Manchon d emboîtement en 2 pièces 12 (305 mm) Avis à l installateur Isolation du conduit d évacuation L installateur est responsable de s assurer que les installations d évacuation à travers les murs extérieurs sont étanches, et à l épreuve des conditions atmosphériques de façon à : Prévenir l infi ltration d eau de pluie dans le mur extérieur en appliquant un joint d étanchéité entre le pourtour de la plaque murale extérieure et la surface du mur extérieur. Prévenir la pénétration de l humidité de la maison dans le mur en appliquant un joint d étanchéité entre le pourtour de la plaque murale intérieure et le pare-vapeur. Prévenir l infi ltration d eau de pluie et la pénétration de l humidité en appliquant un joint d étanchéité entre le conduit d évacuation et les plaques murales intérieure et extérieure. Nous conseillons l utilisation d un produit d étanchéité à base de polyuréthane de haute qualité. Tous droits réservés, Miles Industries Ltd., 2016. 6-5/8 (168 mm) diamètre extérieur du conduit Usage lorsqu homologuée avec les foyers de marque Valor seulement. Consultez la liste des Accessoires d évacuation homologués dans le guide d installation du foyer. Pour usage comme sortie d évacuation horizontale seulement. Ne pas utiliser comme sortie d évacuation verticale. Peut être utilisée avec les marques d accessoires d évacuation indiquées dans le guide d installation du foyer. Le conduit de la sortie 658 est d environ 5-1/2 pouces (140 mm) assurez-vous d un chevauchement minimal de 1-1/2 pouce (38 mm) et utilisez 3 vis pour fixer la sortie au conduit d évacuation. La sortie 658 est conçue pour recouvrir une section de conduit régulière et il est possible qu elle ne se raccorde pas à des sections de conduit réglables qui ont tendance à être légèrement plus gros. Utilisez un scellant tel que Mill-Pac sur le raccord d évacuation de 4 pouces de la sortie 658. Consultez le guide d installation du foyer pour connaître les emplacements permis selon les ouvertures et projections de l édifi ce. Un Grillage de sortie Valor est exigé lorsque la sortie 658DVK2 est à moins de 7 pieds du sol ou facile d accès. Installation typique GRILLAGE DE SORTIE VALOR 658TG (vendu séparément) VALOR 658DVK2 MANCHON D EMBOÎTEMENT 2-PIÈCES SORTIE HORIZONTALE SOLIN LONGUEUR DE CONDUIT D ÉVACUATION (vendue séparément) LARMIER VALOR 658NSFK SOLIN POUR NOUVEAU PAREMENT (vendu séparément) pour applications avec nouveau parement Tout parcours horizontal des conduits doit être élevé de 1/4 po (7 mm) pour chaque portion de 1 pi (30 cm) dans la direction du courant d évacuation. Le dernier conduit avant la sortie peut être incliné vers le bas afi n de permettre le drainage. 5

Épaisseur du mur Les conduits d évacuation de cet appareil et le manchon d emboîtement peuvent pénétrer un mur combustible d au plus 8 po (20 cm) d épaisseur. Un mur incombustible peut être de n importe quelle épaisseur jusqu à la longueur maximale permise pour le conduit horizontal de l installation. Évacuation à travers un mur combustible Lorsque le conduit d évacuation pénètre un mur combustible, percez un trou d un minimum de 10 po sur 10 po (254 mm sur 254 mm) pour le passage du conduit et assurez-vous que l isolant ne touche pas le conduit en utilisant le manchon d emboîtement. Le manchon d emboîtement en deux pièces est fourni avec ce kit. Le manchon d emboîtement n est pas exigé pour les murs incombustibles. Applications à parement existant (pour applications à nouveau parement, utilisez le Solin pour nouveau parement 658NSFK 10 (254 mm) Manchon d emboîtement - partie intérieure Sortie horizontale Manchon d emboîtement - partie extérieure 10 (254 mm) Grillage de sortie d évacuation 658TG (vendu séparément) Rebord de 1 (25 mm) Le parement de finition peut être appliqué autour de la plaque de la sortie d évacuation mais NE DOIT PAS DÉPASSER LA SURFACE DE LA PLAQUE. 6

Applications à nouveau parement Utilisez le Solin pour nouveau parement 658NSFK (vendu séparément) pour applications où le nouveau parement est utilisé 2 (51 mm) 658NSFK 11-7/8 (302 mm) 11-7/8 (302 mm) haut Larmier Solin Notez l orientation du recouvrement afin de permettre l écoulement de l eau Scellez ces coins (4) de l intérieur du solin à l aide d un scellant afin d éviter les fuites SCELLANT ment ettre de l eau afin ites SCELLANT Ouverture de 10 par 10 avec manchons encastrés Revêtement intermédiaire extérieur en contreplaqué Sortie d évacuation 658DVK2 couvre le solin jusqu à 1 (25 mm) d épaisseur Solin et larmier 658NSFK (vendu séparément) S installent sur le revêtement intermédiaire Pare-air/pare-vapeur couvrant les rebords du solin 7

Pare-air/pare-vapeur Grillage de sortie d évacuation 658TG lorsque requis (vendu séparément) Parement. Finissez jusqu au bord du solin/ sortie d évacuation Fourrures pour cavité pare-pluie lorsque requis Parce que nous favorisons une politique de développement continu, certains détails de la présente publication peuvent varier. Conçue et fabriquée par / pour Miles Industries Ltd. 190 2255 Dollarton Highway, North Vancouver, BC, CANADA V7H 3B1 Tél. 604-984-3496 Téléc. 604-984-0246 www.foyervalor.com 8