RA24ZC ZERO CLEARANCE KIT Approved for use only with Valor Retrofire Model RF24BN/P Insert Installation Instructions

Documents pareils
R.V. Table Mounting Instructions

Folio Case User s Guide

Lavatory Faucet. Instruction Manual. Questions?

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE ombre pendant lamp lampe suspendue à tons dégradés, chocolat

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE luster chandelier lamp chandelier à trois branches en verre lustré

Embases pour raccordement G1/8 - G1/4

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

GIGABIT PCI DESKTOP ADAPTER DGE-530T. Quick Installation Guide+ Guide d installation+

Table des matières QUINCAILLERIE FONCTIONNEL FUNCTIONAL HARDWARE. Clé H1 Serrure et pêne H2. Serrure à levier H4

03/2013. Mod: WOKI-60IP/TR. Production code: DTWIC 6000

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

Fabricant. 2 terminals

Instructions Mozilla Thunderbird Page 1

WINTER BOAT STORAGE SYSTEM SYSTÈME DE REMISAGE HIVERNAL POUR BATEAU

Paxton. ins Net2 desktop reader USB

Cheque Holding Policy Disclosure (Banks) Regulations. Règlement sur la communication de la politique de retenue de chèques (banques) CONSOLIDATION

Warning: Failure to follow these warnings could result in property damage, or personal injury.

APPENDIX 6 BONUS RING FORMAT

Contrôle d'accès Access control. Notice technique / Technical Manual

Support Orders and Support Provisions (Banks and Authorized Foreign Banks) Regulations

Le No.1 de l économie d énergie pour patinoires.

MONTEGO 3 PERSON CUSHION GARDEN SWING WITH CANOPY ASSEMBLY INSTRUCTIONS ITEM# SC-177-2GS

Exercices sur SQL server 2000

Guide d installation Deco Drain inc. DD200

Notice Technique / Technical Manual

TABLE DES MATIERES A OBJET PROCEDURE DE CONNEXION

Once the installation is complete, you can delete the temporary Zip files..

Guide d'installation rapide TFM-560X YO.13

WEB page builder and server for SCADA applications usable from a WEB navigator

Laboratory accredited by the French Home Office (official gazette date February 5 th, 1959, modified) Valid five years from August 27 th, 2013

FO-FDHB6-1 Central Heat Blower Kit for Onyx, Opel and Delta

LISTE DE PRIX / PRICE LIST. Tables avec jupes / Skirted Tables

LISTE DE PRIX / PRICE LIST. Tables avec jupes / Skirted Tables

DOCUMENTATION - FRANCAIS... 2

that the child(ren) was/were in need of protection under Part III of the Child and Family Services Act, and the court made an order on

Stérilisation / Sterilization

SYSTÈME JETS D AIR WISH WISH AIR JETS SYSTEM Système de massage à jets d air pour bains en polymère - Air jet massage system for polymer bathtubs

FÉDÉRATION INTERNATIONALE DE NATATION Diving

Editing and managing Systems engineering processes at Snecma

PRINCIPE DE HOTTE SPÉCIALE COMPLÈTE TYPE «RHC» COMPLETE «RHC» TYPE SPECIAL HOOD SYSTEM

DOCUMENTATION - FRANCAIS... 2

AMENDMENT TO BILL 32 AMENDEMENT AU PROJET DE LOI 32

LOOPED THREAD OSTEOSUTURE: SMARTLOOP

The new consumables catalogue from Medisoft is now updated. Please discover this full overview of all our consumables available to you.

Stainless Steel Solar Wall Light

Instructions pour mettre à jour un HFFv2 v1.x.yy v2.0.00

GASKET FOR TONER COLLECTION BOTTLE

Quick Start Guide This guide is intended to get you started with Rational ClearCase or Rational ClearCase MultiSite.

Critères à l attention des fabricants et des fournisseurs de biens ou de services : dispositifs mécaniques pour bingo

Interest Rate for Customs Purposes Regulations. Règlement sur le taux d intérêt aux fins des douanes CONSOLIDATION CODIFICATION

Trim Kit Installation Instruction

Quick start guide. HTL1170B

PRACTICE DIRECTION ON THE LENGTH OF BRIEFS AND MOTIONS ON APPEAL

RAPID Prenez le contrôle sur vos données

22/09/2014 sur la base de 55,03 euros par action

RULE 5 - SERVICE OF DOCUMENTS RÈGLE 5 SIGNIFICATION DE DOCUMENTS. Rule 5 / Règle 5

Cedric Dumoulin (C) The Java EE 7 Tutorial

Application Form/ Formulaire de demande

Archived Content. Contenu archivé

CLIM/GTP/27/8 ANNEX III/ANNEXE III. Category 1 New indications/ 1 re catégorie Nouvelles indications

FOURTH SESSION : "MRP & CRP"

IPSAS 32 «Service concession arrangements» (SCA) Marie-Pierre Cordier Baudouin Griton, IPSAS Board

Loi sur la remise de certaines dettes liées à l aide publique au développement. Forgiveness of Certain Official Development Assistance Debts Act

Micro-ordinateurs, informations, idées, trucs et astuces utiliser le Bureau à distance

Typ 511. Serrure de vitrine 6005 pour portes coulissantes en verre, zamak, nickelé au mat.

POLICY: FREE MILK PROGRAM CODE: CS-4

Principe de TrueCrypt. Créer un volume pour TrueCrypt

DOCUMENTATION - FRANCAIS... 2

Wobe.

ENGLISH 4 FRANÇAIS 6 ESPAÑOL 8

Logitech Tablet Keyboard for Windows 8, Windows RT and Android 3.0+ Setup Guide Guide d installation

If you understand the roles nouns (and their accompanying baggage) play in a sentence...

en SCÈNE RATIONAL Rational Démonstration SDP : automatisation de la chaîne de développement Samira BATAOUCHE sbataouche@fr.ibm.com

USB 598. Quick Start Guide (Windows) Guide de démarrage rapide (Windows) USB Modem. Modem USB.

Lesson Plan Physical Descriptions. belle vieille grande petite grosse laide mignonne jolie. beau vieux grand petit gros laid mignon

Propriétés de la matière. Material properties. Sonde de pression Pressure probe. Ref : Français p 1. English p 3.

MELTING POTES, LA SECTION INTERNATIONALE DU BELLASSO (Association étudiante de lʼensaparis-belleville) PRESENTE :

APPENDIX 2. Provisions to be included in the contract between the Provider and the. Holder

SYSTÈME DE GAINES À SPIRALE ET RACCORDS TOURNANTS

calls.paris-neuroscience.fr Tutoriel pour Candidatures en ligne *** Online Applications Tutorial

72" STORAGE SHELF OR WORKBENCH ÉTAGERÈ DE RANGEMENT OU ETABLI DE 72 PO

Copyright 2014, Oracle and/or its affiliates. All rights reserved.

DOCUMENTATION MODULE BLOCKCATEGORIESCUSTOM Module crée par Prestacrea - Version : 2.0

General Import Permit No. 13 Beef and Veal for Personal Use. Licence générale d importation n O 13 bœuf et veau pour usage personnel CONSOLIDATION

Installation d'un serveur RADIUS

Contents Windows

SA-32 / SA-62 INSTRUCTION MANUAL - MANUEL D INSTRUCTIONS

Air Transportation Tax Order, Décret de 1995 sur la taxe de transport aérien CONSOLIDATION CODIFICATION

L. Obert, T. Lascar, A. Adam

Règlement sur le télémarketing et les centres d'appel. Call Centres Telemarketing Sales Regulation

Water Quality Information Management for Atlantic, Ontario, Manitoba, Pacific and Saskatchewan Regions

Practice Direction. Class Proceedings

An Act to Amend the Tobacco Sales Act. Loi modifiant la Loi sur les ventes de tabac CHAPTER 46 CHAPITRE 46

Z-Axis Compliance Device Compliance en z

Règlement relatif à l examen fait conformément à la Déclaration canadienne des droits. Canadian Bill of Rights Examination Regulations CODIFICATION

CLASSIFICATION REPORT OF REACTION TO FIRE PERFORMANCE IN ACCORDANCE WITH EN : 2007

CLASSIFICATION REPORT OF REACTION TO FIRE PERFORMANCE IN ACCORDANCE WITH EN : 2007

LOGICIEL D'ADMINISTRATION POUR E4000 & G4000 MANAGEMENT SOFTWARE FOR E4000 & G4000

Module Title: French 4

Ottawa,, 2009 Ottawa, le 2009

Transcription:

RA24ZC ZERO CLEARANCE KIT Approved for use only with Valor Retrofire Model RF24BN/P Insert Installation Instructions Please read this manual in conjunction with the RF24B heater Installation Manual General Application The RA24ZC Zero Clearance Kit with RF24B heater may be installed in new wood frame construction with type B venting. The Zero Clearance Kit is also intended for applications where an existing gas or wood burning fireplace is being removed in whole or in part, without disturbing the surrounding wall finish. The zero clearance box may be roughed-in on its own and the RF24B heater installed later. The minimum cavity for installing the Zero Clearance Kit is shown in the Framing Dimensions diagram next page. Existing type B gas venting may be utilized provided the integrity is intact. Existing mantel clearances must conform to the chart. For visual reasons, the zero clearance box is painted black on the inside; it is recommended to paint the vent liner and gas line with high heat paint after installing. Kit Content Overview 4000876-04 2010, Miles Industries Ltd.

Framing Dimensions Note: 29 x 33 minimum opening in combustible wall. 23 Rear width 16 29 33 Front width 20 Combustible floor and hearth approved 4 dia. collar Stand-offs 23-1/4 Mantel Clearances 24-1/2 24-3/8 5-1/4 to 7-1/4 Gas line access RA24TB Fret (Black) 27 8 1225VFB Ventana Fret (Black) 25-1/2 7-5/8 16 30 10 11 RA24CV Fret (Vintage Iron) Optional Frets RA24AV Fret (Vintage Iron) Inner Front Trim Choices (one must be selected) (same perimeter size for all) 743 Double Door (hinged) Supplied with fret 744 Single Door (hinged) Supplied with fret RA24DS Draw Screen Fret supplied separately RA24FS Fixed Screen Fret supplied separately Outer Trim Options (Note: Must cover 29 x 33 minimum opening in combustible wall) Custom trims may be used to replace or extend these options. 746/747, 3-sided Shown with 750OCP 748/749, 4-sided 715 Cast Mantel 2

Prepare ZC Box NOTE: The vent plate may be positioned within a 2-inch variation front to back (see dimensions on previous page). Determine the best position for the vent plate and adjust it to suit by sliding it on top of the box. 1. Remove stand-offs from top of ZC box; fold and reattach to top of box. 2. Position ZC box in cavity and connect to vent system see note above concerning the position of the ZC box. 3. Rough-in gas line to left hand side. 4. Install the short length of 3 dia. flex liner supplied with the kit to the collar inside the ZC box using the gear clamp provided. Secure the vent plate removed from the insert to the other end of the liner using a gear clamp. 5. Compress or stretch the liner so the vent plate is approximately 19 above the floor. 6. Paint liner and gear clamps using black high heat paint (not supplied). Install Insert into ZC Box If a fan is to be installed, it should be installed to the heater before the heater is inserted into the ZC box. See separate installation instructions with the fan kit. 1. Slide the insert into the zero clearance box while guiding the vent plate into the cleats on top of the insert. Mount the fret retainers to the insert prior to installing for RA24DS/FS Screens (other fronts have the retainers built in). Secure the vent plate using 2 screws. 2. Connect the gas line to the unit. 2010, Miles Industries Ltd. 3

Install Heat Shield and Convection Baffle 1. Place heat shield into ZC box through the notched cut-outs on each side at the top of box. 2. Place the tabs at the rear edge of the heat shield into the slots. Secure the heat shield using 2 screws on each side. Screw from within the ZC box. 3. Slide the convection baffle supplied with the heater into the slots at the top and tighten the wingnuts. 4. Finish the installation of bricks, logs, remote control, glass, etc. as per instructions packed with the RF24B heater. 4

Install Trims Note: Outer trims may require extending or custom trims may be required to cover openings. The trim packs may contain redundant parts not required for these applications as trims are common to other model heaters. Discard unused parts. 1. Fasten the mounting brackets supplied with the zero clearance kit to the back of the outer trim using screws provided. Note: It may be necessary to extend the outer trim to cover the combustible wall opening. Custom noncombustible sheet metal pieces may be added to the extruded aluminum trims and fastened using the screw channel on the back of the trim. 2. Fasten the outer trim with the mounting brackets attached to the side flanges of the ZC box using 2 screws each side. 3. Hook the cast iron fret onto the retainers mounted to the heater if using the RA24DS or FS Screens. Note: Other fronts include the retainers. 4. Hook the front to the mounting brackets on the ZC box. It may be desirable for visual reasons to adjust the front-to-back position of the insert depending on which inner front trim is used and where the cast iron fret positions. 2010, Miles Industries Ltd. 5

Parts Vent plate n o 4000982 Stand-offs (2) (shipped flat) n o 4000979 3 Gear Clamps (2) n o 4000768 3 dia. Flex (connects to 3 collar within box) n o MFL770Z05 Convective Heat Shield (installs within box) n o 4000978 Stand-offs (2) n o 4000976 Trim Mounting Brackets (2) n o 4000135 Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication. Designed and Manufactured by / for Miles Industries Ltd. 190 2255 Dollarton Highway, North Vancouver B.C., CANADA V7H 3B1 Tel. 604-984-3496 Fax 604-984-0246 www.valorfireplaces.com 6

Kit à dégagement zéro RA24ZC Homologué pour utilisation avec le foyer encastrable Valor Retrofire RF24BN/P seulement Directives d installation Veuillez utiliser ce guide avec le manuel d installation du foyer RF24BN/BP. Application générale Le Kit à dégagement zéro RA24ZC est utilisé avec le foyer Retrofire RF24 lorsque celui-ci est installé dans une nouvelle construction de bois avec un système d évacuation à tirage naturel ( B vent). Le Kit à dégagement zéro est également conçu pour installations dans un foyer existant au gaz ou au bois, lorsque le foyer existant peut être enlevé en tout ou en partie, sans affecter la finition du mur. La caisse à dégagement zéro peut être mise en place sommairement et le foyer installé à une date ultérieure. Les dimensions minimales de l âtre sont indiquées au schéma Dimensions d encastrement à la page suivante. Un système d évacuation de type B déjà existant peut être utilisé tant que son intégrité est intacte. Les dégagements pour manteau de cheminée doivent être conformes à ceux indiqués au tableau de la page suivante. À des fins esthétiques, la caisse à dégagement zéro est peinte en noir. Il est recommandé de peindre également le conduit souple et la conduite de gaz avec une peinture à haute température, une fois l installation complétée. Buse de 4 de diamètre Accès pour la conduite de gaz Foyer RF24BN/P Accès pour la conduite de gaz Buse de 4 de diamètre Caisse à dégagement zéro RA24ZC Conduit souple de 3 de diamètre Écarteurs (fournis à plat) Déflecteur de chaleur (fourni avec kit à dégagement zéro) Serre-joints de 3 (2) Conduit souple de 3 de diamètre (se branche à la buse de 3 dans la caisse) Supports de montage de bordure (2) Déflecteur de chaleur (s installe dans la caisse) Contenu du kit Supports de montage (fournis avec kit à dégagement zéro) Bordure au choix : 746, 747, 748, 749 ou 715 Grande plaque de couverture 750OCP ou fabriquée sur mesure (requise pour fermer l ouverture autour du foyer) Pare-étincelles au choix : RA24DS amovible RA24FS fixe 743FVI porte double 744FVI porte simple Base de foyer au choix : RA24TB traditionnelle RA24CV contemporaine RA24AV avant-garde Concept 2010, Miles Industries Ltd. 7

Dimensions d encastrement Note : L ouverture minimale dans un mur combustible est de 29 de haut sur 33 de large 8-3/4 à 10-3/4 23 Largeur arrière 16 29 33 Largeur avant 5-1/4 à 7-1/4 Accès de la conduite de gaz 20 Plancher et base de foyer combustibles homologués Buse de 4 dia. Écarteurs 23-1/4 Dégagements du manteau de cheminée 24-1/2 Base de feu style traditionnel RA24TB (noire) 27 8 24-3/8 Base de feu Ventana 1225FVB (noire) 25-1/2 7-5/8 16 30 10 11 Base de feu style contemporain RA24CV (fer antique) Bases de feu Base de feu style avant-garde RA24AV (fer antique) Bordures intérieures (bordure requise) (toutes ces bordures ont le même périmètre) 743 Portes doubles (à charnières) Base de feu incluse 744 Porte simple (à charnières) Base de feu incluse RA24DS Pare-étincelles (amovible) Base de feu vendue séparément RA24FS Pare-étincelles (fixe) Base de feu vendue séparément Bordures extérieures (facultative) (Note : Doit couvrir une ouverture minimale dans un mur combustible de 29 de haut sur 33 de large). Une bordure faite sur mesure peut être utilisée en plus ou à la place de ces bordures. 746/747, à 3 côtés montrée avec le 750OCP 748/749, à 4 côtés 715 bordure de fonte 8

Préparation de la caisse à dégagement zéro NOTE : Vous pouvez positioner la plaque d évent de la caisse zéro en la glissant d avant en arrière ou l inverse sur une distance de 2 pouces (voir les dimensions à la page précédente). Déterminez la position idéale, dévissez les vis sur la plaque et ajustez sa position. 1. Enlevez les écarteurs du dessus de la caisse; pliezles et fixez-les au dessus de la caisse. Pliez les écarteurs et fixez-les sur le dessus de la caisse 2. Placez la caisse dans l âtre et branchez-la au système d évacuation voir la note ci-haut concernant la position de la plaque d évent de la caisse zéro. 3. Installez sommairement la conduite de gaz du côté gauche de la caisse. 4. À l aide du serre-joint fourni, fixez un des bouts du conduit souple fourni à la buse, de l intérieur de la caisse. Fixez l autre bout du conduit souple à la plaque d évent du foyer. Fixez les écarteurs de chaque côté de la caisse Fixez le conduit souple aux buses à l aide de serrejoints Plaque d évent (fournie avec le foyer) 5. Ajustez la longueur du conduit souple de façon à ce que la plaque d évent du foyer soit à approximativement 19 au dessus du plancher. 6. Appliquez de la peinture noire à haute température (non fournie) aux conduit souple et serres-joints. Approx. 19 au-dessus du plancher Installation du foyer dans la caisse à dégagement zéro Dans le cas ou un ventilateur doit être installé, installezle au foyer avant d insérer le foyer dans la caisse à dégagement zéro. Consultez le manuel d installation fourni avec le ventilateur. 1. Glissez le foyer dans la caisse et guidez la plaque d évent du foyer dans ses rainures sur la boîte de foyer. Si vous installez un des pare-étincelles RA24DS ou RA24FS, montez les supports de base de feu d abord. Si vous installez d autres devantures, elles sont déjà équipées avec les supports de base de feu. 2. Fixez le devant de la plaque d évent au foyer à l aide de deux vis. 3. Branchez la conduite de gaz à l appareil. 2010, Miles Industries Ltd. Montez les supports de base de feu avant d insérer le foyer dans la caisse Glissez le foyer sur la plaque d évent Fixez le rebord avant de la plaque d évent au foyer avec 2 vis 9

Installation du déflecteur de chaleur et du déflecteur de convection 1. Insérez le déflecteur de chaleur dans la caisse à dégagement zéro en le guidant dans les encoches des coins supérieurs de la caisse. Insérez le déflecteur de chaleur en le guidant dans les encoches des coins supérieurs de la caisse 2. Glissez les onglets du déflecteur dans les fentes de la moitié arrière située dans le haut de la caisse. De l intérieur de la caisse, fixez le déflecteur à l aide de 2 vis de chaque côté. Insérez les onglets dans les fentes de la moitié arrière de la caisse et fixez le déflecteur à l aide de 2 vis de chaque côté 3. Glissez le déflecteur de convection fourni avec le foyer dans les fentes du dessus du foyer prévues à cet effet. Serrez les écrous à oreilles du déflecteur. Déflecteur de convection fourni avec le foyer 4. Complétez l installation des panneaux de briques, des bûches, de la télécommande, etc. tel qu indiqué dans le manuel d installation du foyer RF24. Vissez partiellement les écrous à oreilles sur les goujons. Glissez le déflecteur dans les fentes. Une fois la devanture installée, ajustez le déflecteur pour qu il touche l arrière du pare-étincelles. Écrous à oreilles (2) Déflecteur de convection (fourni avec le foyer) 10

Installation de la bordure Note : Il est possible que la bordure extérieure ne soit pas assez grande pour couvrir l ouverture de l âtre et une bordure faite sur mesure peut être nécessaire. Les bordures sont utilisées sur d autres modèles de foyers et certaines de leurs pièces ne seront pas nécessaires pour l installation sur le RA24ZC. Jetez ou recyclez les pièces inutilisées. 1. Fixez les supports de montage fournis avec le kit à dégagement zéro à l arrière de la bordure extérieure. Note : Il est possible que la bordure nécessite une extension pour couvrir l ouverture de l âtre jusqu au mur combustible. Des pièces de métal taillées sur mesure peuvent être ajoutées à la bordure en les fixant à la rainure de vis située à l arrière de la bordure. 2. À l aide de 2 vis par côté, fixez à la caisse la bordure extérieure munie des supports de montage. Avec 4 vis, fixez à la caisse la bordure extérieure munie des supports de montage 3. Si vous installez un pare-étincelles RA24DS ou RA24FS, accrochez la base de feu en fonte aux supports montés au foyer. Note : Les autres modèles de devanture incluent les supports de montage de base de feu. Avec les pare-étincelles RA24DS ou RA24FS : Accrochez la base de feu aux supports fixés au foyer. 4. Accrochez la bordure intérieure aux supports de montage de la caisse. Pour des raisons esthétiques, il peut être souhaitable d ajuster la position du foyer d avant en arrière dans l âtre selon l espace disponible, la bordure utilisée et la position de la base de feu. Accrochez le pare-étincelles aux supports de montage de la bordure extérieure. Note : Avec les bordures 743/744, ramenez le foyer vers l avant dans la caisse à dégagement zéro et accrochez la base de feu sur les supports de la bordure. 2010, Miles Industries Ltd. 11

Pièces de remplacement Plaque d évent n o 4000982 Écarteurs (2) (fournis à plat) n o 4000979 Serre-joints de 3 (2) n o 4000768 Conduit souple de 3 (se branche à la buse de l intérieur de la caisse) n o MFL770Z05 Déflecteur de chaleur (s installe dans la caisse) n o 4000978 Écarteurs (2) n o 4000976 Supports de montage (2) n o 4000135 Parce que nous favorisons une politique de développement continu, certains détails de la présente publication peuvent varier. Conçue et fabriquée par / pour Miles Industries Ltd. 190 2255 Dollarton Highway, North Vancouver, BC, CANADA V7H 3B1 Tél. 604-984-3496 Téléc. 604-984-0246 www.foyervalor.com 12