CITEPH 2015 - Présentation des Besoins de SAIPEM CITEPH CITEPH 20/01/15 14/03/11 Présentation des des besoins besoins des des Sponsors Sponsors
CITEPH 20/01/15 Présentation des besoins des Sponsors 2
CITEPH 20/01/15 Présentation des besoins des Sponsors 3
TECHNOLOGY DEVELOPMENT OBJECTIF FPSO Low pressure reservoirs Deeper water Longer Marginal ressources Arctic flowlines XT XT HP/HT reservoirs Viscous fluid XT XT Acid gases ENSURE MAXIMUM RECOVERY FROM THE RESERVOIR Develop efficient, safe, reliable and cost effective solutions CITEPH 20/01/15 Présentation des besoins des Sponsors 4
TECHNOLOGY DEVELOPMENT AREAS Deepwater SURF Subsea Processing Floaters Challenges: - Design optimisation for cost reduction (riser, structure, flowline) - Materials to handle difficult services (sour service / HP/HT / ultra deep water > 3000m ) - Installation means (optimise installation time, install in more difficult sea state, install in ultra deep water) Challenges: - Subsea system simulation - Increase gas and oil recovery - Subsea instruments and control system - Increase availability (IMR/ inspection means) - Increase autonomy (energy and control) - Increase safety - Reduce environmental impact Challenges: - New processing (FLNG) - New environment (Arctic, ultra deep, difficult sea) - New building methods to decrease cost and risk - Increase safety - Reduce environmental impact (energy efficiency) CITEPH 20/01/15 Présentation des besoins des Sponsors 5
SAIPEM S ON GOING ACTIVITIES SURF development Flowline new concepts (heated, internally lined ) Riser concepts for ultra deep waters High performance insulation material Installation assets optimization (welding/coating) Floater development FLNG Subsea processing Separation solutions for deepwater: Gas/Liquid separation Liquid/Liquid separation and water reinjection Development through feasibility tests, JIP with oil companies Development of whole process solutions (oil, gas, produced water treatment) Development of complete subsea stations CITEPH 20/01/15 Présentation des besoins des Sponsors 6
TECHNOLOGY DEVELOPMENT NEEDS New engineering tools for design optimisation Flow assurance Hydrodynamic (riser, floaters) Pipeline design Topside design New materials and new technologies for frontier projects New materials: new coatings for high temperature, alternate to carbon steel for harsh environment (Corrosion resistant alloy, composite or plastic materials) Qualification of technologies / products for 4000m Water Depth New technologies supplier s cooperation Coming from other field of activity for cross cultural development Enabling to reduce cost (new fabrication methods, reduction of market monopoly/open competition) CITEPH 20/01/15 Présentation des besoins des Sponsors 7
TECHNOLOGY DEVELOPMENT NEEDS an example Autonomous subsea plant Need for compact, modular and reliable components Valves, actuators and connectors Electrical components (transmission, connectors and distribution) Control systems Need for robust & reliable monitoring systems Permanent monitoring of fluid quality (e.g. continuous monitoring of oil in water, sand in water, water composition, hydrate content, viscosity ) Subsea monitoring of equipment performances Solutions to limit loss of production Limit fooling and equipment damage (sand mgt, wax mgt) Limit maintenance vessel intervention duration Solutions to limit environmental risk and impact CITEPH 20/01/15 Présentation des besoins des Sponsors 8
EXAMPLE OF PREVIOUS CITEPH PROJECTS New simulation tools: Installation de Colis Lourds en grande profondeur (2 phases) VIV Haut Reynolds (2 phases) Modélisation interaction fluide-structure Simulation numérique des contraintes résiduelles dans un joint de soudure Etude des vibrations induites par le fluide multiphasique sur des tuyauteries Gestion des instabilités dans un écoulement multiphasique New knowledges: First-Year Ice loads on Floating Offshore Structures DP in ice Wave propagation in ice covered seas Joint de vanne en condition arctique CITEPH 20/01/15 Présentation des besoins des Sponsors 9
EXAMPLE OF PREVIOUS CITEPH PROJECTS New technologies: Floaters: Flexible marin destine au transfert de GNL Efficacité de POD pour le positionnement dynamique SURF: Technologie Laser pour préparation de surface Revêtement mono couche pour joint de soudure en mer Système de mesure sans contact de débit d anodes galvaniques Smart riser monitoring SUBSEA PROCESSING: Vision stéréoscopique pour ROV CITEPH 20/01/15 Présentation des besoins des Sponsors 10
CONTACT Merci pour votre attention Philippe MUGUERRA Philippe.muguerra@.com 01.61.37.87.82 CITEPH 20/01/15 Présentation des besoins des Sponsors 11