OBSERVE ALL GOVERNING CODES AND ORDINANCES.

Documents pareils
R.V. Table Mounting Instructions

Warning: Failure to follow these warnings could result in property damage, or personal injury.

Folio Case User s Guide

Contents Windows

GIGABIT PCI DESKTOP ADAPTER DGE-530T. Quick Installation Guide+ Guide d installation+

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE ombre pendant lamp lampe suspendue à tons dégradés, chocolat

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE luster chandelier lamp chandelier à trois branches en verre lustré

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

Fabricant. 2 terminals

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

ENGLISH 4 FRANÇAIS 6 ESPAÑOL 8

Notice Technique / Technical Manual

PARIS ROISSY CHARLES DE GAULLE

Lavatory Faucet. Instruction Manual. Questions?

Sécurité relative aux sièges auto et aux rehausseurs

Instructions pour mettre à jour un HFFv2 v1.x.yy v2.0.00

Instructions Mozilla Thunderbird Page 1

WINTER BOAT STORAGE SYSTEM SYSTÈME DE REMISAGE HIVERNAL POUR BATEAU

Garage Door Monitor Model 829LM

Guide d'installation rapide TFM-560X YO.13

FO-FDHB6-1 Central Heat Blower Kit for Onyx, Opel and Delta

Guide d installation Deco Drain inc. DD200

Stainless Steel Solar Wall Light

JSIam Introduction talk. Philippe Gradt. Grenoble, March 6th 2015

03/2013. Mod: WOKI-60IP/TR. Production code: DTWIC 6000

MONTEGO 3 PERSON CUSHION GARDEN SWING WITH CANOPY ASSEMBLY INSTRUCTIONS ITEM# SC-177-2GS

How to Login to Career Page

Table des matières QUINCAILLERIE FONCTIONNEL FUNCTIONAL HARDWARE. Clé H1 Serrure et pêne H2. Serrure à levier H4

Quick Start Guide This guide is intended to get you started with Rational ClearCase or Rational ClearCase MultiSite.

Package Contents. System Requirements. Before You Begin

DOCUMENTATION - FRANCAIS... 2

Application Form/ Formulaire de demande

WEB page builder and server for SCADA applications usable from a WEB navigator

GASKET FOR TONER COLLECTION BOTTLE

Contrôle d'accès Access control. Notice technique / Technical Manual

Compléter le formulaire «Demande de participation» et l envoyer aux bureaux de SGC* à l adresse suivante :

SYSTÈME JETS D AIR WISH WISH AIR JETS SYSTEM Système de massage à jets d air pour bains en polymère - Air jet massage system for polymer bathtubs

lundi 3 août 2009 Choose your language What is Document Connection for Mac? Communautés Numériques L informatique à la portée du Grand Public

SYSTÈME DE GAINES À SPIRALE ET RACCORDS TOURNANTS

calls.paris-neuroscience.fr Tutoriel pour Candidatures en ligne *** Online Applications Tutorial

TABLE DES MATIERES A OBJET PROCEDURE DE CONNEXION

Paxton. ins Net2 desktop reader USB

NORMES D INSTALLATION PARTITION W/SCA Avec rideau gonflable

Embases pour raccordement G1/8 - G1/4

Z-Axis Compliance Device Compliance en z

CALCUL DE LA CONTRIBUTION - FONDS VERT Budget 2008/2009

User guide Conference phone Konftel 100

Trim Kit Installation Instruction

Logitech Tablet Keyboard for Windows 8, Windows RT and Android 3.0+ Setup Guide Guide d installation

LOGICIEL D'ADMINISTRATION POUR E4000 & G4000 MANAGEMENT SOFTWARE FOR E4000 & G4000

Judge Group: P Title: Quel est meilleur: le compost ou le fertilisant chimique? Student(s): Emma O'Shea Grade: 6

Principe de TrueCrypt. Créer un volume pour TrueCrypt

DOCUMENTATION - FRANCAIS... 2

Cheque Holding Policy Disclosure (Banks) Regulations. Règlement sur la communication de la politique de retenue de chèques (banques) CONSOLIDATION

that the child(ren) was/were in need of protection under Part III of the Child and Family Services Act, and the court made an order on

ONTARIO Court File Number. Form 17E: Trial Management Conference Brief. Date of trial management conference. Name of party filing this brief

Once the installation is complete, you can delete the temporary Zip files..

Installation Operation and Maintenance Instructions

INVESTMENT REGULATIONS R In force October 1, RÈGLEMENT SUR LES INVESTISSEMENTS R En vigueur le 1 er octobre 2001

72" STORAGE SHELF OR WORKBENCH ÉTAGERÈ DE RANGEMENT OU ETABLI DE 72 PO

The UNITECH Advantage. Copyright UNITECH International Society All rights reserved. Page 1

Le passé composé. C'est le passé! Tout ça c'est du passé! That's the past! All that's in the past!

VTP. LAN Switching and Wireless Chapitre 4

Vanilla : Virtual Box

Gestion des prestations Volontaire

FOURTH SESSION : "MRP & CRP"

Tutoriel de formation SurveyMonkey

Utiliser un proxy sous linux

McGILL UNIVERSITY MARTLET CLASSIC UNIVERSITE McGILL CLASSIQUE MARTLET

POLICY: FREE MILK PROGRAM CODE: CS-4

Installation Instructions La section française commence après la section anglaise

EN UNE PAGE PLAN STRATÉGIQUE

Règlement sur le télémarketing et les centres d'appel. Call Centres Telemarketing Sales Regulation

SA-32 / SA-62 INSTRUCTION MANUAL - MANUEL D INSTRUCTIONS

/MC Quick Install Guide Guide d installation rapide

Now enhanced with powerful workplace solutions Maintenant amélioré, diet+ vous offre de puissantes solutions novatrices pour le milieu de travail

Nouveautés printemps 2013

3M HEPA Vacuum 497AJK. User s Guide

Stérilisation / Sterilization

Frequently Asked Questions

accidents and repairs:

BILL 203 PROJET DE LOI 203

WiFi Security Camera Quick Start Guide. Guide de départ rapide Caméra de surveillance Wi-Fi (P5)

PRINCIPE DE HOTTE SPÉCIALE COMPLÈTE TYPE «RHC» COMPLETE «RHC» TYPE SPECIAL HOOD SYSTEM

DOCUMENTATION - FRANCAIS... 2

Quick Installation Guide

Installation d'un serveur RADIUS

titre : CENTOS_CUPS_install&config Système : CentOs 5.7 Technologie : Cups Auteur : Charles-Alban BENEZECH

English Q&A #1 Braille Services Requirement PPTC Q1. Would you like our proposal to be shipped or do you prefer an electronic submission?

Restaurant Application Quick Reference Guide

If the corporation is or intends to become a registered charity as defined in the Income Tax Act, a copy of these documents must be sent to:

Start Here Point de départ

Comment Créer une Base de Données Ab Initio

Dishwasher Lave-vaisselle

CONVENTION DE STAGE TYPE STANDART TRAINING CONTRACT

has brought a motion to change the order of Justice, dated. the agreement between you and (name of party bringing this motion), dated.


ICY wine cooler manual Notice du distributeur à vin. Model / Modèle : CV2T

PROJET DE LOI. An Act to Amend the Employment Standards Act. Loi modifiant la Loi sur les normes d emploi

Comfort Duett. TV-kit. USA: English/Français/Español. Comfort Duett

Transcription:

Installation Instructions for your new RAVTRANS Transition Plenum Before you begin - Read these instructions completely and carefully. IMPORTANT OBSERVE ALL GOVERNING CODES AND ORDINANCES. Note to Installer Be sure to leave these instructions with the Consumer. Note to Consumer Keep these instructions with your Owner s Manual for future reference. RAVTRANS Kit will fit the following GE Appliances plenum kits: RAVWP6, RAVWP8, RAVWP12 and RAVWP15. This kit will not work for the Large Chassis 18,000 BTU/hr Heat Pump models. RAVTRANS kit is required when replacing an AZ75/AZ85 series vertical air conditioner with a new AZ90/91 series vertical air conditioner. Differences in chassis designs between the AZ75/AZ85 series and AZ90/91 series require careful installation planning. Changes in drain exit locations and drain routing, electrical connections, platform height, conditioned air duct location and additional space requirements for installation of RAVTRANS kit are all items that need to be considered when replacing a AZ75/AZ85 series unit with an AZ90/91 series unit. Installation of a new AZ90/91 series unit with a transition plenum will take up approximately 2-1/2 of additional closet space once the unit is fully installed. Before starting the conversion be sure there is adequate closet space to meet the manufacture s recommend minimum clearance requirements. Parts Included Transition Plenum 6 - #8 3/4 hex head sheet metal screws 4 - Pieces of Insulation 1 - Mounting screw locations Flange Unit Side Existing Wall Plenum Side (2) Top and Bottom Pieces of Insulation (2) Side Pieces of Insulation Transition Installation Overview Insulation Existing Architectural Louver Exterior/ Outside Wall RAVWP6 6 D x 19-3/4 W x 32 H RAVWP8 8 D x 19-3/4 W x 32 H RAVWP12 12 D x 19-3/4 W x 32 H RAVWP15 15 D x 19-3/4 W x 32 H Existing Transitional Unit GE is a trademark of the General Electric Company. Manufactured under trademark license. 31-30824-1 02-17 GEA

Installation Instructions STEP 1 Prepare Installation Area by Removing AZ75/AZ85 Unit WARNING Risk of Electrical Shock, can cause injury or death. Before servicing, switch power off at the service panel and lock the area to prevent power from being switched on accidentally. To remove the AZ75/AZ85 series unit: 1. Disconnect the power coming into the unit from the main breaker or closet mounted disconnect. 2. Remove the front case panel. 3. Unplug the 9-pin yellow connector and disconnect the wall thermostat connection. 4. Fully loosen the 4 adjustable screws on the top cover and disconnect the top duct work from the unit. 5. Remove the front and or side case-to-unit grounding screws, if present. 6. Slide the unit out of the case. 7. Disconnect all of the drains. 8. Remove the bolts holding the case to the platform (if present). 9. Remove the 6 screws securing the case to the plenum. 10. Remove the case. 11. Remove the platform, if needed. Inside Wall Access Panel or Closet Door Rigid Ductwork Existing When complete the closet area should look like this. STEP 2 Install and Connect the Transition Plenum to the Existing NOTE: The Drain pan must be installed into the transition plenum prior to screwing the transition plenum to the existing wall plenum. 1. Before mounting the transitional plenum, install a piece of precut insulation to the bottom of the transitional plenum. Insulation should be installed flush with the front side of the transitional plenum and overhang slightly on the other side. 2. Align drain pan outlet with the cutout in the bottom of the transition plenum. Drop drain pan into place. 3. Place the transitional plenum in front of the existing wall plenum with the flange side facing away from the wall plenum. 4. Align the transitional plenum mounting holes to the mounting holes on the existing wall plenum. The top of the transitional plenum should be even with the top of the existing wall plenum. 5. Attach the transitional plenum to the wall plenum with the 6 supplied screws. 6. Install the 3 remaining pieces of insulation to the top and sides of the transitional plenum. Align Mounting Holes Inside Wall Rigid Ductwork Flush with top of existing wall plenum Flange Align Front Edges Outlet Insulation Overlap 2

STEP 3 Platform Height Adjustment Installation Instructions 1. In most AZ75/AZ85 to AZ90/91 conversions the existing platform will need to be lowered to accommodate the new AZ90/91 vertical air conditioner. Having the correct platform height will ease installation of the unit by allowing the back of the unit to slide right into the transition plenum, the sealing gasket should be lubricated with soapy water or similar solution to reduce the friction between the side of the unit and the gasket. 2. Refer to the installation instructions that came with the unit to complete the installation. Inside Wall Rigid Ductwork 3/4 Transition Plenum Opening Platform Platform 3 Printed in the United States

Instructions d installation de votre nouveau plenum de transition RAVTRANS Avant de commencer Lisez ces instructions attentivement et en totalité. IMPORTANT OBSERVEZ TOUS LES CODES ET RÈGLEMENTS EN VIGUEUR. Remarque pour l installateur Assurez-vous de remettre ces instructions au consommateur. Remarque pour le consommateur Conservez ces instructions avec votre manuel d utilisation pour référence ultérieure. La trousse RAVTRANS est compatible avec les trousses de plenum GE Appliances suivantes : RAVWP6, RAVWP8, RAVWP12 et RAVWP15. Cette trousse ne convient pas aux modèles à thermopompe 18 000 BTU/h à carrosserie grand format. La trousse RAVTRANS est requise dans le cas du remplacement d un climatiseur vertical de séries AZ75/AZ85 par un nouveau climatiseur vertical de série AZ90/9. Des différences dans la conception de la carrosserie entre les séries AZ75/ AZ85 et la série AZ90/91 exige une planification minutieuse de l installation. Des modifications dans les sorties et la trajectoire du, les connexions électriques, la hauteur de plateforme, l emplacement des conduits d air et les dégagements supplémentaires requis pour l installation de la trousse RAVTRANS sont tous des éléments dont il faut tenir compte lors du remplacement d un appareil de séries AZ75/AZ85 par un autre de série AZ90/91. L installation d un nouvel appareil de série AZ90/91 avec plenum de transition nécessite un dégagement d armoire supplémentaire d environ 2 ½ po une fois l installation de l appareil terminée. Avant de commencer la conversion, assurezvous que l espace de l armoire est suffisante pour satisfaire les dégagements minimaux recommandés par le fabricant. Pièces incluses Plenum de transition Six (6) vis à tôle hexagonales #8 ¾ po Quatre (4) pièces d isolant Un (1) plateau de Emplacements des vis de montage Rebord Côté de l appareil Côté du plenum mural Deux (2) pièces d isolant, supérieure et inférieure Deux (2) pièces d isolant latérales de transition Plateau de Vue d ensemble de l installation Isolant Persienne architecturale e Mur extérieur RAVWP6 6 x 19-3/4 x 32 po RAVWP8 8 x 19-3/4 x 32 po RAVWP12 12 x 19-3/4 x 32 po RAVWP15 15 x 19-3/4 x 32 po de transition Plateau de Appareil GE est une marque de commerce de General Electric Company. Fabriqué sous licence de marque. 31-30824-1 02-17 GEA

Instructions d installation ÉTAPE 1 Préparez la zone d installation en retirant l appareil AZ75/AZ85 AVERTISSEMENT Risque de choc électrique pouvant causer des blessures ou le décès. Avant de procéder à un entretien ou une réparation, coupez l alimentation électrique au panneau de service et verrouillez son accès afin de prévenir une remise sous tension accidentelle. Pour retirer l appareil de série AZ75 ou AZ85 : 1. Coupez l alimentation électrique à l appareil à partir du disjoncteur principal ou de celui monté dans l armoire. 2. Retirez le panneau frontal de l enceinte. 3. Débranchez le connecteur jaune à 9 broches et débranchez la connexion au thermostat mural. 4. Desserrez complètement les 4 vis ajustables sur le couvercle de dessus et déconnectez le conduit d air supérieur de l appareil 5. Retirez les vis de mise à la terre frontales et latérales reliant l enceinte à l appareil, si elles sont présentes. 6. Glissez l appareil à l extérieur de l enceinte. 7. Déconnectez tous les drains. 8. Retirez les boulons qui fixent l enceinte à la plateforme (si présents). 9. Retirez les 6 vis qui fixent l enceinte au plenum. 10. Retirez l enceinte. 11. Retirez la plateforme, au besoin. Mur intérieur Panneau d accès ou porte de l armoire Conduit rigide Une fois terminée, la zone de l armoire devrait ressembler à ceci. ÉTAPE 2 Installation et raccordement du plenum de transition au plenum mural REMARQUE : Le plateau de doit être installé dans le plenum de transition avant de visser ce dernier dans le plenum mural. 1. Avant de monter le plenum de transition, posez une pièce d isolant prédécoupée dans le bas de celui-ci. L isolant doit être posé à égalité avec la face avant du plenum de transition et dépasser légèrement de l autre côté. 2. Alignez l orifice de sortie du plateau de sur la découpe dans le bas du plenum de transition. Laissez tomber le plateau de en place. 3. Placez le plenum de transition devant le plenum mural avec le côté à rebord orienté à l opposé du plenum mural. 4. Alignez les trous de montage du plenum de transition sur les trous de montage du plenum mural. Le dessus du plenum de transition doit être à égalité avec le dessus du plenum mural. 5. Fixez le plenum de transition sur le plenum mural à l aide des 6 vis fournies. 6. Posez les 3 autres pièces d isolant sur le dessus et les côtés du plenum de transition. Plateau de Aligner les trous de montage Mur intérieur Conduit rigide À égalité avec le dessus du plenum mural Rebord Aligner les bords avant Orifice du plateau de Isolant Superposition 2

Instructions d installation ÉTAPE 3 Ajustement de la hauteur de la plateforme 1. Dans la plupart des conversions AZ75/AZ85 à AZ90/91, la plateforme e devra être abaissée pour s adapter au nouveau climatiseur vertical AZ90/91. Une hauteur de plateforme appropriée facilitera l installation en permettant à l arrière de l appareil de glisser directement dans le plenum de transition. Le joint d étanchéité devrait être lubrifié avec de l eau savonneuse ou une solution similaire afin de réduire la friction entre le côté de l appareil et le joint. 2. Reportez-vous aux instructions d installation incluses avec l appareil pour compléter l installation. Mur intérieur Conduit rigide 3/4 po Ouverture du plenum de transition de la plateforme de la plateforme 3 Imprimé aux États-Unis