1750v2 Linear 5-1/4 Surround Kit (1750LFBv2, 1750LFPv2, 1750LFZv2) Approved for use with Valor Models 1700 Heaters ONLY

Documents pareils
ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE ombre pendant lamp lampe suspendue à tons dégradés, chocolat

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE luster chandelier lamp chandelier à trois branches en verre lustré

Lavatory Faucet. Instruction Manual. Questions?

Instructions Mozilla Thunderbird Page 1

Le No.1 de l économie d énergie pour patinoires.

Folio Case User s Guide

Warning: Failure to follow these warnings could result in property damage, or personal injury.

GIGABIT PCI DESKTOP ADAPTER DGE-530T. Quick Installation Guide+ Guide d installation+

R.V. Table Mounting Instructions

Garage Door Monitor Model 829LM

Guide d'installation rapide TFM-560X YO.13

Guide d installation Deco Drain inc. DD200

Règlement sur le télémarketing et les centres d'appel. Call Centres Telemarketing Sales Regulation

TABLE DES MATIERES A OBJET PROCEDURE DE CONNEXION

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

Contents Windows

that the child(ren) was/were in need of protection under Part III of the Child and Family Services Act, and the court made an order on

Paxton. ins Net2 desktop reader USB

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

Contrôle d'accès Access control. Notice technique / Technical Manual

Notice Technique / Technical Manual

Fabricant. 2 terminals

Laboratory accredited by the French Home Office (official gazette date February 5 th, 1959, modified) Valid five years from August 27 th, 2013

Instructions pour mettre à jour un HFFv2 v1.x.yy v2.0.00

Table des matières QUINCAILLERIE FONCTIONNEL FUNCTIONAL HARDWARE. Clé H1 Serrure et pêne H2. Serrure à levier H4

DOCUMENTATION - FRANCAIS... 2

Editing and managing Systems engineering processes at Snecma

Using a Walker. 2. Move your injured or weak leg toward the walker first. If you have had surgery on both legs, use either leg to begin walking.

Trim Kit Installation Instruction

Package Contents. System Requirements. Before You Begin

POLICY: FREE MILK PROGRAM CODE: CS-4

AMENDMENT TO BILL 32 AMENDEMENT AU PROJET DE LOI 32

03/2013. Mod: WOKI-60IP/TR. Production code: DTWIC 6000

Monitor LRD. Table des matières

FÉDÉRATION INTERNATIONALE DE NATATION Diving

GASKET FOR TONER COLLECTION BOTTLE

How to Login to Career Page

Archived Content. Contenu archivé

Once the installation is complete, you can delete the temporary Zip files..

The new consumables catalogue from Medisoft is now updated. Please discover this full overview of all our consumables available to you.

SA-32 / SA-62 INSTRUCTION MANUAL - MANUEL D INSTRUCTIONS

Nouveautés printemps 2013

APPENDIX 6 BONUS RING FORMAT

WINTER BOAT STORAGE SYSTEM SYSTÈME DE REMISAGE HIVERNAL POUR BATEAU

PARIS ROISSY CHARLES DE GAULLE

Embases pour raccordement G1/8 - G1/4

Application Form/ Formulaire de demande

3615 SELFIE. HOW-TO / GUIDE D'UTILISATION

Lesson Plan Physical Descriptions. belle vieille grande petite grosse laide mignonne jolie. beau vieux grand petit gros laid mignon

À noter, s il vous plaît : Ne pas utiliser de l alcool à friction. Il contient un hydratant et n est pas convenable pour nettoyer des cloisons.

DOCUMENTATION - FRANCAIS... 2

Exercices sur SQL server 2000

MODE D EMPLOI USER MANUAL

22/09/2014 sur la base de 55,03 euros par action

Micro-ordinateurs, informations, idées, trucs et astuces utiliser le Bureau à distance

USB 598. Quick Start Guide (Windows) Guide de démarrage rapide (Windows) USB Modem. Modem USB.

CLASSIFICATION REPORT OF REACTION TO FIRE PERFORMANCE IN ACCORDANCE WITH EN : 2007

INVESTMENT REGULATIONS R In force October 1, RÈGLEMENT SUR LES INVESTISSEMENTS R En vigueur le 1 er octobre 2001

RAPID Prenez le contrôle sur vos données

Sécurité relative aux sièges auto et aux rehausseurs

APPENDIX 2. Provisions to be included in the contract between the Provider and the. Holder

IPSAS 32 «Service concession arrangements» (SCA) Marie-Pierre Cordier Baudouin Griton, IPSAS Board

ENGLISH 4 FRANÇAIS 6 ESPAÑOL 8

86 rue Julie, Ormstown, Quebec J0S 1K0

Utiliser un proxy sous linux

MONTEGO 3 PERSON CUSHION GARDEN SWING WITH CANOPY ASSEMBLY INSTRUCTIONS ITEM# SC-177-2GS

Stainless Steel Solar Wall Light

Logitech Tablet Keyboard for Windows 8, Windows RT and Android 3.0+ Setup Guide Guide d installation

MELTING POTES, LA SECTION INTERNATIONALE DU BELLASSO (Association étudiante de lʼensaparis-belleville) PRESENTE :

CLASSIFICATION REPORT OF REACTION TO FIRE PERFORMANCE IN ACCORDANCE WITH EN : 2007

AUDIT COMMITTEE: TERMS OF REFERENCE

RULE 5 - SERVICE OF DOCUMENTS RÈGLE 5 SIGNIFICATION DE DOCUMENTS. Rule 5 / Règle 5

Discours du Ministre Tassarajen Pillay Chedumbrum. Ministre des Technologies de l'information et de la Communication (TIC) Worshop on Dot.

SERVEUR DÉDIÉ DOCUMENTATION

Gestion des prestations Volontaire

If the corporation is or intends to become a registered charity as defined in the Income Tax Act, a copy of these documents must be sent to:

FOURTH SESSION : "MRP & CRP"

Frequently Asked Questions

BLUELINEA ,00 EUR composé de actions de valeur nominale 0,20 EUR Date de création : 17/01/2006

ONTARIO Court File Number. Form 17E: Trial Management Conference Brief. Date of trial management conference. Name of party filing this brief

Compléter le formulaire «Demande de participation» et l envoyer aux bureaux de SGC* à l adresse suivante :

en SCÈNE RATIONAL Rational Démonstration SDP : automatisation de la chaîne de développement Samira BATAOUCHE sbataouche@fr.ibm.com

de stabilisation financière

FCM 2015 ANNUAL CONFERENCE AND TRADE SHOW Terms and Conditions for Delegates and Companions Shaw Convention Centre, Edmonton, AB June 5 8, 2015

English Q&A #1 Braille Services Requirement PPTC Q1. Would you like our proposal to be shipped or do you prefer an electronic submission?

lundi 3 août 2009 Choose your language What is Document Connection for Mac? Communautés Numériques L informatique à la portée du Grand Public

Copyright 2014, Oracle and/or its affiliates. All rights reserved.

ETABLISSEMENT D ENSEIGNEMENT OU ORGANISME DE FORMATION / UNIVERSITY OR COLLEGE:

BILL 203 PROJET DE LOI 203

LOGICIEL D'ADMINISTRATION POUR E4000 & G4000 MANAGEMENT SOFTWARE FOR E4000 & G4000

Comprendre l impact de l utilisation des réseaux sociaux en entreprise SYNTHESE DES RESULTATS : EUROPE ET FRANCE

BNP Paribas Personal Finance

Practice Direction. Class Proceedings

Quick Start Guide This guide is intended to get you started with Rational ClearCase or Rational ClearCase MultiSite.

calls.paris-neuroscience.fr Tutoriel pour Candidatures en ligne *** Online Applications Tutorial

Free filter reminders! Sign up online at: santevia.com/filterease. need help? Contact Santevia!

WiFi Security Camera Quick Start Guide. Guide de départ rapide Caméra de surveillance Wi-Fi (P5)

Confirmation du titulaire de la carte en cas de contestation de transaction(s) Cardholder s Certification of Disputed Transactions

Revision of hen1317-5: Technical improvements

CONVENTION DE STAGE TYPE STANDART TRAINING CONTRACT

Transcription:

! L2 SERIES 1750v2 Linear 5-1/4 Surround Kit (1750LFBv2, 1750LFPv2, 1750LFZv2) Approved for use with Valor Models 1700 Heaters ONLY Installation Instructions DANGER HOT GLASS WILL CAUSE BURNS. DO NOT TOUCH GLASS UNTIL COOLED. NEVER ALLOW CHILDREN TO TOUCH GLASS. A barrier designed to reduce the risk of burns from the hot viewing glass is provided with this appliance and shall be installed for the protection of children and other at-risk individuals. INSTALLER Leave this manual with the appliance. CONSUMER Retain this manual for future reference. Notes: This kit must be installed or serviced by a qualified installer, service agency or gas supplier. These instructions are to be used in conjunction with the main installation instructions for the above listed heater models. 24-5/8 (625 mm) LH Trim panel LH Side door Non-combustible cement board 59-1/2 (1511 mm) Trim size Thickness 1-3/8 (35 mm) The 1750v2 Linear 5-1/4 Surround Kit is designed to be used on the Linear L2 1700 Valor heater. The application of this kit does not affect the venting capabilities or method of preparation of the 1700 heater as described in the 1700 heater installation manual. This trim fi ts fl at against the cement board with the ability to tuck additional non-combustible materials up to 1/2 inch thickness behind the trim. Replacing the side panels on the trim allow noncombustible material thickness to be increased to 1 inch. 4005357-01 Copyright Miles Industries Ltd., 2015. Barrier screen Plinth Trim RH Trim panel Overview (Fireplace engines sold separately) RH Side door

Considerations finish wall thickness This trim can be adjusted according to the thickness of the non-combustible wall fi nish. Two options of installation can be used: Wall thickness on top of cement board of 0-1/2. For this option, the trim can be installed as it comes out of the box. Follow installation steps in the next section Installation. Wall thickness on top of cement board of 1/2-1. For this option, the side panels on the trim must be removed and the extension panels supplied with this kit must be installed. Proceed to the following steps before the installation. Installation 1. Locate trim inside perimeter of window aperture fl anges, press fi rmly against fi nished face of wall. LH side panels 2. Select a pre punched hole and secure trim using 4 no 8 screws. 0-1/2, panels deep notch 1/2-1, panels shallow notch RH side pannels fi xing screws (4) Trim Preparation 1. From the rear of the trim, remove the 6 fi xing nuts (3 per side) retaining the side panels to the trim. Recycle these panels as they will no longer be required. 2. Position the extension panels on the rear of the trim and fi x them with the 6 nuts (3 per side). Top Note: The metal fl ange is wider at the top of the trim than at the bottom Bottom 2

3. Position plinth in space between glass and trim, locate ends onto end support. Ensure plinth is level with trim. Notes : - The opening in the plinth should be oriented as shown below to allow air to enter while obstructing any view through the opening. - Each end of the plinth has a rounded notch opening to insert the tab of the side doors. - The bottom edge of the trim is more or less visible depending of the thickness of the wall fi nish under the trim. 4. Identify left hand door and its orientation according to the images below. Left door TOP of door: this space is wider TOP of door: tab at the rear Front view Rear view BOTTOM of door: this space is narrower 5. Locate hinge pin into upper hole. 6. Lower door hinge pin into the notch at the end of the plinth. Insert hinge pin here hinge pin hinge pin Insert hinge pin here hinge pin Insert tab here Trim directly on the fi nished cement board Opening in the plinth 7. Repeat for right hand door. Plinth Flange below plinth is visible when the trim is on thicker wall fi nish Trim on 1 thick wall fi nish 3

Installation of the barrier screen 1. Hold the screen on the sides and locate the top into the channel inside the top section of the surround. Removing the screen The barrier screen will need to be removed to access the fi replace controls or for maintenance. To remove the screen, hold both fi nger tabs and lift and tilt the bottom towards you, lower screen to clear the surround and away from the fi replace. 2. Grab the fi nger tabs on the bottom of the frame and lower the screen straight down locating the bottom hooks into slots hidden just behind surround plate. Finger tab Front tab Maintenance! WARNING DO NOT TOUCH THE BARRIER SCREEN OR FIREPLACE WHILE THEY ARE HOT! Let the fi replace cool fi rst before cleaning it. FOR SAFETY PURPOSE, ensure the barrier screen is re-installed on the fireplace front after maintenance if it has been removed. To clean the fi replace trim, use mild soap and water. To clean the barrier screen, dust with a soft brush. If the barrier becomes damaged, the barrier shall be replaced with the manufacturer s barrier for this appliance. To clean the window and ceramics inside the fi rebox, consult the Owner s Information section of the Installation and Owner s Manual supplied with the fi replace. DO NOT CLEAN THE GLASS WINDOW WITH AMMONIA! 3. Verify that the screen is properly hooked to the trim and secure. 4

Repair Parts List Description Black (LSB) Part Numbers Bronze (LSZ) Nickel (LSP) 1 LH door assembly 4002957AZ 4002957AZ 4002957AZ 2 RH door assembly 4002959AZ 4002959AZ 4002959AZ 3 LH side panel (extended version) 4003909AZ 4003909AZ 4003909AZ 4 RH side panel (extended version 4003910AZ 4003910AZ 4003910AZ 5 Plinth 4003738AZ 4003738AZ 4003738AZ 6 Trim frame 4005363 4005363BR 4005363P 7 Barrier screen 4004221 4004221 4004221 #8 x 3/8 black screws (4) 100A757 100A757 100A757 3 1 2 5 4 7 6 Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication. Designed and Manufactured by / for Miles Industries Ltd. 190 2255 Dollarton Highway, North Vancouver, B.C., CANADA V7H 3B1 Tel. 604-984-3496 Fax 604-984-0246 www.valorfireplaces.com 5

LE PREMIER MC FOYER À GAZ RADIANT! SÉRIE L2 Bordure Linear 5-1/4 1750v2 (1750LFBv2, 1750LFPv2, 1750LFZv2) Homologuée pour utilisation avec les foyers Valor 1700 SEULEMENT Directives d installation DANGER VITRE CHAUDE - RISQUE DE BRÛLURES. NE TOUCHEZ PAS UNE VITRE NON REFROIDIE. NE LAISSEZ JAMAIS UN ENFANT TOUCHER LA VITRE. L écran pare-étincelles fourni avec ce foyer réduit le risque de brûlure en cas de contact accidentel avec la vitre chaude et doit être installé pour la protection des enfants et des personnes à risques. INSTALLATEUR Laissez cette notice avec l appareil. CONSOMMATEUR Conservez cette notice pour consultation ultérieure. Notes : Ce kit doit être installé ou réparé par un installateur qualifi é, une agence de service certifi ée ou un fournisseur de gaz. Ces directives doivent être utilisées conjointement avec les directives d installation du foyer Valor indiqué ci-dessus. 24-5/8 (625 mm) Panneau gauche Porte gauche Panneau de béton incombustible 59-1/2 (1511 mm) Dimensions de la bordure Épaisseur 1-3/8 (35 mm) La Bordure Linear 5-1/4 1750v2 est conçue pour installer sur les foyers Valor Linear L2 1700. L installation de ce kit n affecte pas l évacuation ou méthode de préparation du foyer 1700 tel que décrit dans le guide d installation du foyer. Cette bordure peut être installée directement sur le panneau de béton incombustible ou sur un matériau de fi nition incombustible jusqu à 1/2 pouce (13 mm) d épaisseur couvrant le panneau de béton. L épaisseur peut-être augmentée à 1 pouce (26 mm) en remplaçant les panneaux des côtés de la bordure (inclus). Pare-étincelles Plinthe Bordure Panneau droit Concept (Foyers vendus séparément) Porte droite 6 Miles Industries Ltd., 2015.Tous droits réservés.

Considérations épaisseur de la finition du mur Cette bordure est ajustable selon l épaisseur du mur incombustible fini. Deux options d installation sont offertes : Épaisseur du mur par-dessus le panneau de béton de 0 à 1/2 pouce (0-13 mm). Pour cette option, la bordure peut être installée sans qu il soit nécessaire de la modifi er. Passez directement à la section Installation. Épaisseur du mur par-dessus le panneau de béton de 1/2 pouce à 1 pouce (13-26 mm). Pour cette option, les panneaux de côtés de la bordure doivent être remplacés par les panneaux d extension fournis avec le kit. Suivez les étapes ci-dessous. Installation 1. Placez la bordure dans le périmètre de l ouverture du foyer et poussez-la fermement contre la surface du mur fi ni. Panneaux gauches 2. Sélectionnez un trou de fi xation et fi xez la bordure au foyer à l aide de 4 vis n o 8. 0-1/2 (13 mm), panneaux à découpe plus profonde 1/2-1 (13-26mm), panneaux à découpe plus étroite Panneaux droits Vis de fi xation (4) Préparation de la bordure 1. De l arrière de la bordure, enlevez les 6 écrous (3 de chaque côté) retenant les deux panneaux des côtés. Recyclez ces panneaux car ils ne sont plus nécessaires. 2. Placez les panneaux d extension sur la bordure tel qu indiqué et fi xez-les avec les 6 écrous (3 de chaque côté). Haut Note : le rebord de métal au haut de la bordure et plus large que celui du bas Bas 7

3. Placez la plinthe dans l espace entre la fenêtre et la bordure. La plinthe repose sur le rebord au bas de la bordure; assurez-vous que le bord de la plinthe est égal au bord de la bordure. Notes : - L ouverture dans la plinthe doit être orientée tel qu indiqué ci-dessous afi n de permettre l entrée d air tout en cachant l intérieur de l appareil. - L espace arrondi dans le coin permet l installation des portes des côtés. - Le rebord au bas de la bordure est plus ou moins visible selon l épaisseur de la fi nition du mur. 4. Identifi ez la porte gauche et son orientation selon les images ci-dessous. Porte gauche HAUT de porte : cet espace est plus large HAUT de porte : onglet à l arrière Avant Arrière BAS de porte : cet espace est plus étroit 5. Insérez la cheville dans le trou du haut de l ouverture du foyer. 6. Poussez la porte vers le haut et insérez la cheville du bas dans le trou au bout de la plinthe. Insérez la cheville ici cheville cheville Insérez la cheville ici cheville Insérez la cheville ici Bordure sur panneau de béton fi ni Ouverture de la plinthe 7. Répétez avec la porte droite. Plinthe Rebord de métal de la bordure est visible quand la bordure est sur un fi ni plus épais Bordure sur fi nition de 1 po d épaisseur 8

Installation du pare-étincelles 1. En le tenant par les côtés, insérez le haut du pareétincelles dans la rainure de la bordure. Enlèvement du pare-étincelles Le pare-étincelles doit être enlevé pour avoir accès aux commandes du foyer ou pour l entretien. Pour enlever le pare-étincelles, soulevez-le à l aide des onglets du bas, décrochez-le et tirez-le vers le bas. 2. Tenez le pare-étincelles par les onglets du bas et insérez les crochets du bas dans les fentes cachées juste derrière la face avant de la bordure. Entretien! AVERTISSEMENT AVERTISSEMENT NE TOUCHEZ PAS AU PARE-ÉTINCELLES OU AU FOYER LORSQU ILS SONT CHAUDS! Laissez le foyer refroidir avant de le nettoyer. POUR DES RAISONS DE SÉCURITÉ, assurez- vous que le pare-étincelles soit réinstallé sur la bordure après l entretien s il a été enlevé. Onglet Crochet Pour nettoyer le pare-étincelles, utilisez une brosse à poils doux. Si le pare-étincelles est endommagé, il doit être remplacé par le pare-étincelles conçu par le manufacturier pour cet appareil. Pour nettoyer la vitre de la fenêtre et l intérieur du foyer, consultez la section Information à l intention du consommateur dans le Guide de l installation et du consommateur fourni avec le foyer. NE NETTOYEZ PAS LA VITRE DE LA FENÊTRE AVEC UN PRODUIT À BASE D AMMONIAQUE! 3. Assurez-vous que le pare-étincelles est bien ancré à la bordure. 9

Liste de pièces Description Noire (LSB) Numéros de pièces Bronze (LSZ) Nickel (LSP) 1 Porte gauche 4002957AZ 4002957AZ 4002957AZ 2 Porte droite 4002959AZ 4002959AZ 4002959AZ 3 Panneau d extension gauche 4003909AZ 4003909AZ 4003909AZ 4 Panneau d extension droit 4003910AZ 4003910AZ 4003910AZ 5 Plinthe 4003738AZ 4003738AZ 4003738AZ 6 Bordure 4005363 4005363BR 4005363P 7 Pare-étincelles 4004221 4004221 4004221 Vis noires n o 8 x 3/8 (4) 100A757 100A757 100A757 3 1 2 5 4 7 6 Parce que nous favorisons une politique de développement continu, certains détails de la présente publication peuvent varier. Conçue et fabriquée par / pour Miles Industries Ltd. 190 2255 Dollarton Highway, North Vancouver, BC, CANADA V7H 3B1 Tél. 604-984-3496 Téléc. 604-984-0246 www.foyervalor.com 10