Spectra Series Power Panelboards. General. Installation. Bolt-on Circuit Breaker Kits Catalog Numbers AMCB4FDB, AMCB6FDB

Documents pareils
Lavatory Faucet. Instruction Manual. Questions?

Warning: Failure to follow these warnings could result in property damage, or personal injury.

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

GIGABIT PCI DESKTOP ADAPTER DGE-530T. Quick Installation Guide+ Guide d installation+

WINTER BOAT STORAGE SYSTEM SYSTÈME DE REMISAGE HIVERNAL POUR BATEAU

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE ombre pendant lamp lampe suspendue à tons dégradés, chocolat

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE luster chandelier lamp chandelier à trois branches en verre lustré

R.V. Table Mounting Instructions

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

Instructions Mozilla Thunderbird Page 1

MONTEGO 3 PERSON CUSHION GARDEN SWING WITH CANOPY ASSEMBLY INSTRUCTIONS ITEM# SC-177-2GS

Le No.1 de l économie d énergie pour patinoires.

Contrôle d'accès Access control. Notice technique / Technical Manual

Sécurité relative aux sièges auto et aux rehausseurs

Notice Technique / Technical Manual

Paxton. ins Net2 desktop reader USB

ENGLISH 4 FRANÇAIS 6 ESPAÑOL 8

Folio Case User s Guide

NORME INTERNATIONALE INTERNATIONAL STANDARD. Dispositifs à semiconducteurs Dispositifs discrets. Semiconductor devices Discrete devices

Embases pour raccordement G1/8 - G1/4

DOCUMENTATION - FRANCAIS... 2

Instructions pour mettre à jour un HFFv2 v1.x.yy v2.0.00

INVESTMENT REGULATIONS R In force October 1, RÈGLEMENT SUR LES INVESTISSEMENTS R En vigueur le 1 er octobre 2001

Z-Axis Compliance Device Compliance en z

Fabricant. 2 terminals

Credit Note and Debit Note Information (GST/ HST) Regulations

03/2013. Mod: WOKI-60IP/TR. Production code: DTWIC 6000

Contents Windows

Interest Rate for Customs Purposes Regulations. Règlement sur le taux d intérêt aux fins des douanes CONSOLIDATION CODIFICATION

POLICY: FREE MILK PROGRAM CODE: CS-4

SYSTÈME DE GAINES À SPIRALE ET RACCORDS TOURNANTS

Support Orders and Support Provisions (Banks and Authorized Foreign Banks) Regulations

User guide Conference phone Konftel 100

IPSAS 32 «Service concession arrangements» (SCA) Marie-Pierre Cordier Baudouin Griton, IPSAS Board

This is a preview - click here to buy the full publication NORME INTERNATIONALE INTERNATIONAL STAN DARD. Telecontrol equipment and systems

GASKET FOR TONER COLLECTION BOTTLE

DOCUMENTATION - FRANCAIS... 2

33 inch open & closed storage Rangement à espace fermé et ouvert de 33po (83.7cm) 33 pulgadas almacenaje abierto y cerra

ETABLISSEMENT D ENSEIGNEMENT OU ORGANISME DE FORMATION / UNIVERSITY OR COLLEGE:

Compléter le formulaire «Demande de participation» et l envoyer aux bureaux de SGC* à l adresse suivante :

Trim Kit Installation Instruction

Cedric Dumoulin (C) The Java EE 7 Tutorial

Start Here Point de départ

FOURTH SESSION : "MRP & CRP"

Le passé composé. C'est le passé! Tout ça c'est du passé! That's the past! All that's in the past!

Stainless Steel Solar Wall Light

Logitech Tablet Keyboard for Windows 8, Windows RT and Android 3.0+ Setup Guide Guide d installation

Garage Door Monitor Model 829LM

CONVENTION DE STAGE TYPE STANDART TRAINING CONTRACT

Principe de TrueCrypt. Créer un volume pour TrueCrypt

PRACTICE DIRECTION ON THE LENGTH OF BRIEFS AND MOTIONS ON APPEAL

Propriétés de la matière. Material properties. Sonde de pression Pressure probe. Ref : Français p 1. English p 3.

Institut français des sciences et technologies des transports, de l aménagement

Name Use (Affiliates of Banks or Bank Holding Companies) Regulations

72" STORAGE SHELF OR WORKBENCH ÉTAGERÈ DE RANGEMENT OU ETABLI DE 72 PO

English Q&A #1 Braille Services Requirement PPTC Q1. Would you like our proposal to be shipped or do you prefer an electronic submission?

Critères à l attention des fabricants et des fournisseurs de biens ou de services : dispositifs mécaniques pour bingo

UNIVERSITY OF MALTA FACULTY OF ARTS. French as Main Area in an ordinary Bachelor s Degree

Règlement relatif à l examen fait conformément à la Déclaration canadienne des droits. Canadian Bill of Rights Examination Regulations CODIFICATION

Monitor LRD. Table des matières

THE LAW SOCIETY OF UPPER CANADA BY-LAW 19 [HANDLING OF MONEY AND OTHER PROPERTY] MOTION TO BE MOVED AT THE MEETING OF CONVOCATION ON JANUARY 24, 2002

FÉDÉRATION INTERNATIONALE DE NATATION Diving

SYSTÈME JETS D AIR WISH WISH AIR JETS SYSTEM Système de massage à jets d air pour bains en polymère - Air jet massage system for polymer bathtubs

Frequently Asked Questions

Cheque Holding Policy Disclosure (Banks) Regulations. Règlement sur la communication de la politique de retenue de chèques (banques) CONSOLIDATION

Material Banking Group Percentage Regulations. Règlement fixant le pourcentage (groupe bancaire important) CONSOLIDATION CODIFICATION

Gestion des prestations Volontaire

CALCUL DE LA CONTRIBUTION - FONDS VERT Budget 2008/2009

PARIS ROISSY CHARLES DE GAULLE

JSIam Introduction talk. Philippe Gradt. Grenoble, March 6th 2015

LE FORMAT DES RAPPORTS DU PERSONNEL DES COMMISSIONS DE DISTRICT D AMENAGEMENT FORMAT OF DISTRICT PLANNING COMMISSION STAFF REPORTS

RULE 5 - SERVICE OF DOCUMENTS RÈGLE 5 SIGNIFICATION DE DOCUMENTS. Rule 5 / Règle 5

Quick Installation Guide TEW-AO12O

How to Login to Career Page

RICHEL SERRES DE FRANCE PAR_ _02432_ALT DATE: 03/02/2012

First Nations Assessment Inspection Regulations. Règlement sur l inspection aux fins d évaluation foncière des premières nations CONSOLIDATION

The new consumables catalogue from Medisoft is now updated. Please discover this full overview of all our consumables available to you.

Package Contents. System Requirements. Before You Begin

Improving the breakdown of the Central Credit Register data by category of enterprises

APPENDIX 6 BONUS RING FORMAT

RISK-BASED TRANSPORTATION PLANNING PRACTICE: OVERALL METIIODOLOGY AND A CASE EXAMPLE"' RESUME

Nouveautés printemps 2013

Installation Instructions La section française commence après la section anglaise

Editing and managing Systems engineering processes at Snecma

AMENDMENT TO BILL 32 AMENDEMENT AU PROJET DE LOI 32

Loi sur la Semaine nationale du don de sang. National Blood Donor Week Act CODIFICATION CONSOLIDATION. S.C. 2008, c. 4 L.C. 2008, ch.

Archived Content. Contenu archivé

Railway Operating Certificate Regulations. Règlement sur les certificats d exploitation de chemin de fer CODIFICATION CONSOLIDATION

SERVEUR DÉDIÉ DOCUMENTATION

Exercices sur SQL server 2000

LOI SUR LA RECONNAISSANCE DE L'ADOPTION SELON LES COUTUMES AUTOCHTONES ABORIGINAL CUSTOM ADOPTION RECOGNITION ACT

Restaurant Application Quick Reference Guide

Free filter reminders! Sign up online at: santevia.com/filterease. need help? Contact Santevia!

Règlement sur le télémarketing et les centres d'appel. Call Centres Telemarketing Sales Regulation

Comprendre l impact de l utilisation des réseaux sociaux en entreprise SYNTHESE DES RESULTATS : EUROPE ET FRANCE

GAME CONTENTS CONTENU DU JEU OBJECT OF THE GAME BUT DU JEU

accidents and repairs:

Consultants en coûts - Cost Consultants

Consultation Report / Rapport de consultation REGDOC-2.3.3, Periodic Safety Reviews / Bilans périodiques de la sûreté

lundi 3 août 2009 Choose your language What is Document Connection for Mac? Communautés Numériques L informatique à la portée du Grand Public

Transcription:

DEH40424 Installation Instructions R02 g Spectra Series Power Panelboards Bolt-on Circuit Breaker Kits Catalog Numbers AMCB4FDB, AMCB6FDB General WARNING: Danger of electrical shock or injury. Turn OFF power ahead of the panelboard or switchboard before working inside the equipment or removing any component. Do not remove or install circuit protective devices or any other component until the power is turned OFF. These bolt-on circuit breaker kits are for use with the following catalog numbers: Circuit breaker types FCV, FCS, FCN, FCH, and FCL Circuit breaker cover kit AFP6FDD The parts contained in these kits are listed in Table 1. Numbers in brackets in the text and figures refer to the item numbers in this table. Item Description Qty. 1 A & C phase outer strap 2 2 A & C phase inner strap 2 3 B phase strap 2 4 1/4-20 x 1 1 /2" carriage bolt 3 5 1/4" Belleville washer 3 6 1/4-20 nut 3 7 Barrier mounting bracket 2 8 Thread-forming screw 4 9 Barrier 1 10 Breaker mounting bracket 2 11 #8-32 x 1 /2" screw 4 12 Shakeproof screw 6 13 #8-32 x 3 1 /8" screw 4 14 #8 lock washer 4 15 Antiturn clip 3 Table 1. Parts included in the bolt-on circuit breaker kits. Installation CAUTION: For Spectra APNB bolt-on style interiors, locate the side of the panel interior for which the dimension from the nearest vertical bus face to the inner face of the bus support rail is 2.75 inches, as indicated in Figure 2. The circuit breaker straps must be mounted on this side of the bus. 1. Install circuit breaker straps. Install the straps beginning with phase A, as shown in Figure 1 and Figure 2. Align the outer [1] and inner [2] straps back to back, as shown. Slide the square hole in the antiturn clip [15] over the square shank of the carriage bolt [4], then insert the pin section of the clip through the circular hole in the strap assembly, with the bolt extending through the square hole immediately below. Fasten the complete strap assembly loosely to the vertical bus, using a Belleville washer [5] and nut [6]. Repeat the procedure for the phase B straps [3] and the phase C straps [1, 2]. 2. Install the cover supports. Using the uppermost slot on each cover support body, slide the cover supports (included in the breaker cover kit), with their mounting tabs oriented inward, onto each barrier mounting bracket [7] until they snap into place. The cover supports can be easily removed by inserting a screwdriver into the mounting slot on the underside of the mounting bracket assembly and gently prying downward while pushing off the cover support. 3. Install bus barrier and breaker mounting brackets. Attach the barrier mounting brackets [7] to the panel side rails with the thread-forming screws [8], as shown in Figure 1. Place the barrier [9] over the straps, with the flanges resting on the mounting brackets. Place the breaker mounting brackets [10] over the barrier and secure with the #8-32 screws to the barrier and barrier mounting brackets. Tighten the thread-forming screws [8] to 15 20 in-lb. 4. Install circuit breakers. Position the circuit breakers such that the line- or ON-side terminals rest on the straps and the opposite sides are supported by the mounting brackets. a. Insert the shakeproof screws [12] into the holes in the line connections of the breakers. Align the screws with the holes in the line straps and secure loosely. b. Align each breaker parallel to the unit, then fasten the breakers to the brackets with the #8-32 x 3 1 /8" screws [13] and lock washers [14] and tighten to 15 20 in-lb. c. Tighten the line screws to 27 32 in-lb. Note that the straps may require minor adjustments for proper hole alignment. 5. Tighten bolted connections. Tighten the bolted strap connections at the vertical bus to 65 in-lb. It may be necessary to remove the adjacent circuit breakers to allow access to the bolted connections at the vertical bus.

Cover Support (slide into bracket using uppermost slot) Figure 1. Bolt-on circuit breaker assembly exploded view. Cover Support (included in cover kit) Figure 2. Bolt-on circuit breaker assembly end view. Denotes strap mounting side on busbar

Two-Pole Configurations For phase-balancing purposes, see Table 2 for the twophase breaker-mounting configurations available. Catalog Number AMCB4FDB A-Phase B-Phase C-Phase Table 2. Possible pole connection combinations with the bolt-on breaker kit. When installing any of the strap configurations in Table 2 or a three-phase strap configuration, be sure to use standard phase rotation, as required. For example, when phase balancing a two-pole breaker, the A strap must be above the B or C straps on the vertical buses and the B strap must be above the C strap. Figure 3. Applying insulating tape to unused strap contact surfaces. Mounting a Single Breaker When mounting a single breaker, apply multiple wrappings of insulation to unused strap contact surfaces, as shown in Figure 3. A UL-Recognized 105 C thermoplastic tape (OANZ2) is required. Overlap greater than one-half of preceding turns, as shown, to achieve a minimum tape thickness of 0.013 inch.

These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency that may be met in connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise that are not covered sufficiently for the purchaser s purposes, the matter should be referred to the GE Company. g GE Industrial Systems General Electric Company 41 Woodford Ave., Plainville, CT 06062 DEH40424 R02 0802 2002 General Electric Company

DEH40424 Instructions d Installation R02 g Panneaux de distribution Spectra Series Kits pour disjoncteurs à boulonnage Numéros de catalogues AMCB4FDB, AMCB6FDB AVERTISSEMENT: Danger de choc électrique ou de blessure. Mettre le courant en avant du panneau ou du tableau de contrôle à OFF avant de travailler à l intérieur de cet équipement ou d en retirer toute composante. Ne pas retirer ou installer les mécanismes de protection des circuits ou tout autre composante jusqu à ce que le courant soit à OFF. Généralités Ces kits pour disjoncteurs à boulonnage sont pour utilisation avec les numéros de catalogue suivants: Disjoncteurs de types FCV, FCS, FCN, FCH, et FCI Kit pour couvercle de disjoncteur AFP6FDD Les pièces contenues dans ces kits sont listées à la Table 1. Les numéros entre parenthèses dans le texte et les figures font référence aux numéros des items dans cette table. Item Description Qty. 1 Barrettes extérieures pour pôles A & C 2 2 Barrettes intérieures pour pôle A & C 2 3 Barrettes pôle B 2 4 Boulon de carrosserie 1 /4-20 x 1 1 /2" 3 5 Rondelles Belleville 1 /4" 3 6 Ecrou 1 /4-20 3 7 Soutien de montage de la barrière 2 8 Vis autotaraudeuses 4 9 Barrière 1 10 Soutien de montage du disjoncteur 2 11 Vis #8-32 x 1 /2" 4 12 Vis indesserable 6 13 Vis #8-32 x 3 1 /8" 4 14 Rondelle de retenue #8 4 15 Pinces anti-rotation 3 Table 1. Pièces incluses dans les kits de disjoncteur à boulonnage. Installation ATTENTION: Pour les intérieurs à boulonnage de style Spectra APNB, repérer le côté de l intérieur du panneau dont la dimension de la face de la barre verticale la plus près au rail de support de la face intérieure est de 2.75 pouces, tel qu indiqué à la Figure 2. Les barrettes de disjoncteurs doivent être montées sur ce côté de la barre omnibus. 1. Installer les barrettes de disjoncteurs. Installer les barrettes de disjoncteurs en commençant par la phase A, tel que montré à la Figure 1 et à la Figure 2. Aligner les barrettes extérieures [1] et intérieures [2] dos à dos, comme illustré. Glisser le trou carré dans la pince antirotation [15] par-dessus la tige carrée du boulon de carrosserie [4], puis insérer la section à tige de la pince à travers le trou circulaire dans l assemblage de la barrette, avec le boulon passant à travers le trou carré situé immédiatement dessous. Fixer lâchement l assemblage complet de la barrette à la barre omnibus verticale, en utilisant une rondelle Belleville [5] et un écrou [6]. Répéter la procédure pour les barrettes de phase B [3] et les barrettes de phase C [1, 2]. 2. Installer les supports de couvercle. Utliser l ouverture la plus élevée sur chaque support de couvercle, et glisser les supports de couvercle (inclus dans le kit de disjoncteur avec couvercle), avec leurs onglets orientés vers l intérieur, sur chaque soutien de montage de la barrière [7] jusqu à ce qu ils cliquent en place. Les supports de couvercle s enlèvent facilement en insérant un tournevis dans l ouverture de montage sur le dessous du soutien de montage et en poussant vers le bas tout en retirant le support de couvercle. 3. Installer la barrière de barre omnubus et les soutiens de montage. Attacher les soutiens de montage de la barrière [7] aux rails latéraux du panneau avec les vis autotaraudeuses [8], tel qu illustré à la Figure 1. Placer la barrière [9] par-dessus les barrettes avec les brides reposant, sur les soutiens de montage. Placer les soutiens de montage du disjoncteur [10] pardessus la barrière et les fixer avec des vis autotaraudeuses #8-32 à la barrière et aux soutiens de montage de la barrière. Serrer les vis autotaraudeuses [8] à 15 20 lb.-po. 4. Installer les disjoncteurs. Positionner les disjoncteurs de manière à ce que la ligne électrique ou le côté ON des terminaux repose sur sur les barrettes et que les côtés opposés soient soutenus par les soutiens de montage. a. Insérer les vis indesserrables (12) dans les trous des connexions ligne des disjoncteurs. Aligner les vis avec les trous dans les barrettes de ligne et fixer lâchement. b. Aligner chaque disjoncteur parallèle à l'unité, puis attacher les disjoncteurs aux soutiens avec les vis #8-32 x 3 1 /8" (13) et les rondelles de retenue (14) et serrer à 15 20 lb.-po.

Support du couvercle (glisser dans le soutien en utilisant l ouveture la plus élevée) Figure 1. Vue en pièces détachées de l assemblage du disjoncteur à boulonnage. Support du couvercle (inclus dans le kit de couvercle) Prendre note du côté de montage de la barrette sur la barre omnibus Figure 2. Vue du fond de l assemblage du disjoncteur à boulonnage.

c. Serrer les vis de ligne à 27 32 lb.-po. Prendre note qu il se peut que les barrettes aient besoin d ajustements mineurs pour qu elles s alignent correctement dans le trou. 5. Serrer les connexions boulonnées. Serrer les connexions boulonnées de la barrette à la barre omnibus verticale à 65 lb.-po. Il sera peut-être nécessaire de retirer un disjoncteur adjacent pour permettre l accès à la barre omnibus verticale. Configurations deux pôles À des fins d équilibrage des phases, voir la Table 2 pour les configurations de montage de disjoncteur deux phases disponibles. Figure 3. Application de ruban isolant aux surfaces de contact inutilisées de la barrette. Numéro de catalogue AMCB4FDB Phase A Phase B Phase C Table 2. Combinaisons de connexions possibles des pôles avec un kit de disjoncteur à boulonnage. Lors de l'installation de n'importe lesquelles des configurations de barrettes de la Table 2 ou de configuration de barrette trois phases, assurez-vous d'utiliser une rotation de phase standard, tel que demandé. Par exemple, lors de l'équilibrage de phases d'un disjoncteur deux pôles, la barrette A doit être audessus des barrettes B ou C sur les barres omnibus verticales et la barrette B doit être au-dessus de la barrette C. Montage d'un disjoncteur unique Lors du montage d'un disjoncteur unique, appliquer de multiples couches d isolation aux surfaces de contact inutilisées de la barrette, tel que montré à la Figure 3. Un ruban thermoplastique UL-Reconnu 105 C (OANZ2) est nécessaire. Superposer le ruban sur plus de la moitié des tours précédents, comme illustré, pour obtenir une épaisseur minimale de 0.013 de ruban.

Ces instructions n ont pas pour propos de couvrir tous les détails ou variations de l équipement ni de fournir des solutions pour tous les imprévus reliés avec les opérations causées par l installation ou l entretien. Si des informations supplémentaires étaient requises ou s il survenait un problème particulier lesquels ne sont pas suffisamment couverts selon l acheteur, ceci devrait être référé à GE Company. g GE Industrial Systems General Electric Company 41 Woodford Ave., Plainville, CT 06062 DEH40424 R02 0802 2002 General Electric Company