RONA CODE :

Documents pareils
MONTEGO 3 PERSON CUSHION GARDEN SWING WITH CANOPY ASSEMBLY INSTRUCTIONS ITEM# SC-177-2GS

Lavatory Faucet. Instruction Manual. Questions?

Warning: Failure to follow these warnings could result in property damage, or personal injury.

33 inch open & closed storage Rangement à espace fermé et ouvert de 33po (83.7cm) 33 pulgadas almacenaje abierto y cerra

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE ombre pendant lamp lampe suspendue à tons dégradés, chocolat

ASSEMBLY INSTRUCTIONS DIRECTIVES POUR L'ASSEMBLAGE luster chandelier lamp chandelier à trois branches en verre lustré

WINTER BOAT STORAGE SYSTEM SYSTÈME DE REMISAGE HIVERNAL POUR BATEAU

Folio Case User s Guide

R.V. Table Mounting Instructions

Instructions Mozilla Thunderbird Page 1

Trim Kit Installation Instruction

Table des matières QUINCAILLERIE FONCTIONNEL FUNCTIONAL HARDWARE. Clé H1 Serrure et pêne H2. Serrure à levier H4

72" STORAGE SHELF OR WORKBENCH ÉTAGERÈ DE RANGEMENT OU ETABLI DE 72 PO

Contents Windows

Typ 511. Serrure de vitrine 6005 pour portes coulissantes en verre, zamak, nickelé au mat.

Umkehrfräse Typ UF 70/80/80-T/90/100 Reversing Harrow UF 70/80/80-T/90/100

PARIS ROISSY CHARLES DE GAULLE

Guide d'installation rapide TFM-560X YO.13

Guide d installation Deco Drain inc. DD200

Le passé composé. C'est le passé! Tout ça c'est du passé! That's the past! All that's in the past!

APPENDIX 6 BONUS RING FORMAT

Carport Evolution 1 Voiture Adossant

Notice Technique / Technical Manual

FÉDÉRATION INTERNATIONALE DE NATATION Diving

Using a Walker. 2. Move your injured or weak leg toward the walker first. If you have had surgery on both legs, use either leg to begin walking.

JSIam Introduction talk. Philippe Gradt. Grenoble, March 6th 2015

Exercices sur SQL server 2000

EQUIPEMENT DU BASSIN / COMMERCIAL POOL ACCESSORIES

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

Paxton. ins Net2 desktop reader USB

LOGICIEL D'ADMINISTRATION POUR E4000 & G4000 MANAGEMENT SOFTWARE FOR E4000 & G4000

IPSAS 32 «Service concession arrangements» (SCA) Marie-Pierre Cordier Baudouin Griton, IPSAS Board

12, Chemin de la Forge L Islet (Québec) G0R 1X0 CANADA

Contrôle d'accès Access control. Notice technique / Technical Manual

GAME CONTENTS CONTENU DU JEU OBJECT OF THE GAME BUT DU JEU

03/2013. Mod: WOKI-60IP/TR. Production code: DTWIC 6000

LOOPED THREAD OSTEOSUTURE: SMARTLOOP

DOCUMENTATION - FRANCAIS... 2

3615 SELFIE. HOW-TO / GUIDE D'UTILISATION

Embases pour raccordement G1/8 - G1/4

Application Form/ Formulaire de demande

POLICY: FREE MILK PROGRAM CODE: CS-4

calls.paris-neuroscience.fr Tutoriel pour Candidatures en ligne *** Online Applications Tutorial

Le No.1 de l économie d énergie pour patinoires.

GIGABIT PCI DESKTOP ADAPTER DGE-530T. Quick Installation Guide+ Guide d installation+

Logitech Tablet Keyboard for Windows 8, Windows RT and Android 3.0+ Setup Guide Guide d installation

DOCUMENTATION - FRANCAIS... 2

Thank you for choosing the Mobile Broadband USB Stick. With your USB Stick, you can access a wireless network at high speed.

Z-Axis Compliance Device Compliance en z

lundi 3 août 2009 Choose your language What is Document Connection for Mac? Communautés Numériques L informatique à la portée du Grand Public

Fabricant. 2 terminals

FOURTH SESSION : "MRP & CRP"

Cedric Dumoulin (C) The Java EE 7 Tutorial

If you understand the roles nouns (and their accompanying baggage) play in a sentence...

RAPID Prenez le contrôle sur vos données

Practice Direction. Class Proceedings

NEW Fin Fan / Air cooled condenser cleaning

THE SUBJUNCTIVE MOOD. Twenty-nineth lesson Vingt-neuvième leçon

Tammy: Something exceptional happened today. I met somebody legendary. Tex: Qui as-tu rencontré? Tex: Who did you meet?

de stabilisation financière

SYSTÈME DE GAINES À SPIRALE ET RACCORDS TOURNANTS

Garage Door Monitor Model 829LM

The new consumables catalogue from Medisoft is now updated. Please discover this full overview of all our consumables available to you.

INVESTMENT REGULATIONS R In force October 1, RÈGLEMENT SUR LES INVESTISSEMENTS R En vigueur le 1 er octobre 2001

Frequently Asked Questions

Utiliser une WebCam. Micro-ordinateurs, informations, idées, trucs et astuces

MODE D EMPLOI USER MANUAL

À l'approche du festival MUTEK 2015, nous vous contactons pour vous faire part de quelques informations importantes.

Qualité. Quality. Service. Service. Innovation. Innovation produits en inventaire products in stock

Instructions pour mettre à jour un HFFv2 v1.x.yy v2.0.00

Règlement sur le télémarketing et les centres d'appel. Call Centres Telemarketing Sales Regulation

TABLE DES MATIERES A OBJET PROCEDURE DE CONNEXION

FĖDĖRATION CROATE D'ESCRIME Trg sportova 11, Zagreb Phone: Fax: crofencing@hi.htnet.hr

Présentation Windows Azure Hadoop Big Data - BI

L ABC de l acquisition de petites entreprises

Editing and managing Systems engineering processes at Snecma

PROFESSIONNELS / professionals FICHE D INSCRIPTION / registration form

Quatre axes au service de la performance et des mutations Four lines serve the performance and changes

Insérer des images dans Base

INSTRUCTIONS DE POSE

QUINTESSENCE de vie of life

Lesson Plan Physical Descriptions. belle vieille grande petite grosse laide mignonne jolie. beau vieux grand petit gros laid mignon

Serrures Locksets LAGUNE. Serrures et paumelles Locksets and hinges. LES + PRODUITS The + product. Design Certifié TUV Nombreuses versions.

AIDE FINANCIÈRE POUR ATHLÈTES FINANCIAL ASSISTANCE FOR ATHLETES

Stratégie DataCenters Société Générale Enjeux, objectifs et rôle d un partenaire comme Data4

SA-32 / SA-62 INSTRUCTION MANUAL - MANUEL D INSTRUCTIONS

Interest Rate for Customs Purposes Regulations. Règlement sur le taux d intérêt aux fins des douanes CONSOLIDATION CODIFICATION

General Import Permit No. 13 Beef and Veal for Personal Use. Licence générale d importation n O 13 bœuf et veau pour usage personnel CONSOLIDATION

F1 Security Requirement Check List (SRCL)

Compléter le formulaire «Demande de participation» et l envoyer aux bureaux de SGC* à l adresse suivante :

Township of Russell: Recreation Master Plan Canton de Russell: Plan directeur de loisirs

Copyright 2014, Oracle and/or its affiliates. All rights reserved.

Bill 69 Projet de loi 69

Supervision et infrastructure - Accès aux applications JAVA. Document FAQ. Page: 1 / 9 Dernière mise à jour: 15/04/12 16:14

How to Login to Career Page

LE FORMAT DES RAPPORTS DU PERSONNEL DES COMMISSIONS DE DISTRICT D AMENAGEMENT FORMAT OF DISTRICT PLANNING COMMISSION STAFF REPORTS

Règlement relatif à l examen fait conformément à la Déclaration canadienne des droits. Canadian Bill of Rights Examination Regulations CODIFICATION

Start Here Point de départ

Differential Synchronization

PRACTICE DIRECTION ON THE LENGTH OF BRIEFS AND MOTIONS ON APPEAL

Transcription:

ASSY NSTRUTONS SUNSTR RONA O : 38115034 T # -Z224PA-1 ardware Pack 1 60 pieces () 1/4"-20*0.6 olt 32 pieces () 1/4"-20*1.2 olt 8 pieces () 1/4"-20*1.4 olt 8 pieces () 1/4"-20*1.75 olt 124 pieces ()1/4" lat washer 16 pieces ()1/4"-20 Nut 1 piece ()1/4" Wrench 16 pieces ())5/16"*7 Stake 96 pieces () osquito netting hook

Parts ist Top connector A 1 ong beam with small roof bar 4 Short oblique beam 4 ong oblique beam 4 Top long beam 4 Top short beam 4 Oblique beam connector 4 ong round pole 4 Short round pole 4 ong support beam 4 Short support beam 4 olumn 4 Support triangle 8 olumn base N 4 ase cover O 4 Small canopy P 1 ig canopy Q 1 osquito netting R 1 Wall S 1

Step1 ig.4 ig.5 ig.3 ig.2 ig.1 O ig.1 ig.2 N ig.3 () ig.5 ig.4 Step1 1. Slide base cover (O) onto column (), connect column base (N) to column () using bolt (), flat washer () and tighten. (ig.1) Repeat for each column. 2. nsert side of long support beam () into short support beam (), then connect using bolt () and flat washer () and tighten. (ig.2) Repeat for each side. 3. nsert the notch of the short support beam () into the notch of the long support beam (), and then insert both into the notch of column (). (ig.3) Repeat on each corner. 4. onnect support triangle () to the column (), and to the long support beam () as well as the short support beam () using bolt () and flat washer () to connect. Assemble all corners before tightening. (ig.4) 5. onnect long round pole (), short round pole (), to short support beam () and long support beam () using bolt () and flat washer (). Assemble all corners before tightening. Note: long round pole () should be attached next to short support beam () at one end.

A ig.8 ig.9 ig.10 ig.12 ig.13 ig.14 ig.11 ig.6 ig.7 ig.13 A ig.12 ig.11 ig.10 ig.14 ig.9 ig.8 Step2

Step2 6. onnect top short beam (), long support beam (), top long beam () and short support beam () using bolt (), flat washer (), and assemble all corners before tightening. (ig.6) Repeat on all sides. 7. onnect top short beam (), top long beam () and long support beam (), using bolt () and flat washer (), assemble all corners before tightening. (ig.7) Repeat on all sides. 8. onnect one side of the top long beam () to one side of the top short beam (), using bolt (), flat washer () and nut (), assemble all corners before tightening. (ig.8) 9. onnect the other side of the top long beam () to the other side of the top short beam (), using bolt (), flat washer () and nut (), assemble all corners before tightening.(ig.9) 10. onnect oblique beam connector () and top short beam (), using bolt () and flat washer (), assemble all corners before tightening. (ig.10) Repeat for each beam. 11. onnect short oblique beam () to beam connector (), using bolt (), flat washer () and nut (), assemble all corners before tightening. (ig.11) Repeat for each beam. 12. nsert long oblique beam with small roof bar () into long pole of top connector (A) and one side of long oblique beam () into short pole of top connector (A). (ig.12) 13. nsert one side of long beam with small roof ar () into short oblique beam (). Then connect using bolt () and flat washer () and lock tight. (ig.13) 14. onnect long oblique beam () to top long beam () using bolt (), flat washer () and nut (), assemble all corners before tightening. (ig.14) Step3 P ig. 16 Q ig. 15 ig. 18 ig. 17 S R ig. 19 () ig.17 () () ig.18 () ig 19 O R S N

Step3 15. over roof with big canopy (Q), do not fully extend. (ig.15) 16. over top with small canopy (P). (ig.16) 17. ang mosquito netting (R) onto long round pole () and short round pole (), using mosquito netting hooks ()). (ig.17) 18. ang wall (S) onto top long beam () and top short beam (), using mosquito netting hooks (). (ig.18). Then finish stretching big canopy (Q). 19. Anchor column base (N) to ground using stake (), and then cover the column base with base cover. (ig.19). Repeat for all columns. o over all the assembly steps. ANTNAN: 1. This sun shelter is not a permanent structure and should be disassembled & stored away after use. 2. o not repack your sun shelter until it is completely dry. 3. This sun shelter must be assembled by two adults or more. 4. This sun shelter must not be left erect in windy conditions.

NSTRUTONS ONTA AR SO O RONA-38115034 ART No. -Z224PA-1 Sachet de quincaillerie 60 pièces oulon () 1/4"-20*0.6 32 pièces oulon () 1/4"-20*1.2 8 pièces oulon ( 1) 1/4"-20*1.4 8 pièces oulon ( 2) 1/4"-20*1.75 124 pièces Rondelle plate () φ1/4" 16 pièces Écrou () 1/4"-20 1 pièces lé plate () 1/4" 16 pièces Piquet () 5/16"*7 96 pièces Anneau pour filet moustiquaire ()

iste de pièces onnexion du toit A 1 Poutre oblique avec poutre du petit toit 4 Poutre oblique courte 4 Poutre oblique longue 4 Poutre longue du toit 4 Poutre courte du toit 4 onnexion des poutres obliques 4 arre longue ronde 4 arre courte ronde 4 Poutre horizontale longue 4 Poutre horizontale courte 4 olonne 4 Triangle de support 8 ase de la colonne N 4 ouvre-base pour colonne O 4 Petit auvent P 1 rand auvent Q 1 ilet moustiquaire R 1 ur S 1

Étape 1 ig.4 ig.5 ig.3 ig.2 ig.1 O ig.1 ig.2 N ig.3 () ig.5 ig.4 Étape 1 1. lissez le couvre-base (O) sur la colonne (), connectez la base de la colonne (N) à la colonne () avec boulon (), rondelle plate () et serrez-les. (ig.1) Répétez pour chaque colonne. 2. ntroduisez une extrémité de la poutre horizontale longue () dans la poutre horizontale courte (), et connectez-les avec boulon () et rondelle plate () et serrez-les. (ig.2) Répétez l'opération pour chaque côté. 3. ntroduisez l entaille de la poutre horizontale courte () dans l entaille de la poutre horizontale longue (), et ensuite introduisez les deux poutres ( et ) dans l entaille de la colonne (). (ig.3) Répétez pour chaque coin. 4. onnectez le triangle de support () à la colonne (), et à la poutre horizontale longue () ainsi qu à la poutre horizontale courte () avec des boulons () et rondelles plates (). Assemblez tous les coins avant de serrer tous les boulons. (ig.4) 5. onnectez la barre longue ronde (), la barre courte ronde (), la poutre horizontale courte (), et la poutre horizontale longue () avec un boulon () et une rondelle plate (). Assemblez tous les coins avant de serrer tous les boulons. Avis: a barre longue ronde () doit être fixée près de la poutre horizontale courte () à une extrémité.

Étape 2 ig.14 ig.8 ig.12 A ig.6 ig.13 ig.9 ig.10 ig.11 ig.7 ig.8 ig.9 ig.10 ig.11 A ig.12 ig.13 ig.14 Étape 2 6. onnectez la poutre courte du toit (), la poutre horizontale longue (), la poutre longue du toit () et la poutre horizontale courte () avec un boulon (), une rondelle plate (), et serrez-les fortement. (ig.6) Répétez de chaque côté. 7. onnectez la poutre courte du toit (), a poutre longue du toit () et la poutre horizontale longue (), avec un boulon () et une rondelle plate (), et serrez-les fortement.. (ig.7) Répétez de chaque côté. 8. onnectez une extrémité de la poutre longue du toit () à une extrémité de la poutre courte du toit (), avec un boulon (), une rondelle plate () et un écrou (), et serrez-les fortement. (ig.8) 9. onnectez l autre extrémité de la poutre longue du toit () à l autre extrémité de la poutre courte du toit (), avec un boulon (), une rondelle plate () et un écrou (), et serrez-les fortement. (ig.9) 10. ixez la connexion des poutres obliques () et la poutre courte du toit (), avec un boulon () et une rondelle plate (), et serrez-les fortement. (ig.10) Répétez pour chaque poutre. 11. onnectez la poutre oblique courte () à la connexion des poutres (), avec un boulon (), une rondelle plate () et un écrou (), et serrez-les fortement. (ig.11) Répétez pour chaque poutre.

12. ntroduisez la poutre oblique avec poutre du petit toit () dans longue ronde de la connexion du toit (A) et une extrémité de la poutre oblique longue () dans courte ronde de la connexion du toit (A). (ig.12) 13. ntroduisez une extrémité de la poutre oblique avec poutre du petit toit () dans la poutre oblique courte (). nsuite connectez avec un boulon () et une rondelle plate () et serrez-les fortement. (ig.13) 14. onnectez la poutre oblique longue () à la poutre longue du toit () avec un boulon (), une rondelle plate () et un écrou (), et serrez-les fortement. (ig.14) Étape 3 P ig.16 Q ig. 15 ig. 18 ig. 17 S R ig. 19 () ig.17 () () ig.18 () ig 19 O Étape 3 R S 15. Étalez le grand auvent (Q) sur le toit, mais ne l étendez pas complètement. (ig.15) 16. ouvrez le petit toit avec le petit auvent (P). (ig.16) 17. Accrochez le filet moustiquaire (R) sur la barre longue ronde () et la barre courte ronde (), avec les anneaux pour filet moustiquaire ()). (ig.17) 18. Accrochez le mur (S) sur la poutre longue du toit () et la poutre courte du toit (), avec les anneaux pour filet moustiquaire (). (ig.18). nsuite étirez le grand auvent (Q). 19. Ancrez la base de la colonne (N) à la terre avec les piquets (), et couvrez la base de la colonne (O) avec le couvre-base (N). (ig.19). Répétez pour toutes les colonnes. Vérifiez toutes les étapes de montage. N ntretien : 1. et abri soleil n est pas une structure permanente et devra être démonté et rangé après l emploi. 2. N emballez pas votre abri soleil jusqu à ce qu il soit complètement sec. 3. et abri soleil doit être monté avec l aide de deux adultes ou plus. 4. et abri soleil ne doit pas être laissé en position érigée quand il y a du vent.